Project (ISO 21502)
A temporary endeavour undertaken to create a unique product, service or result, with defined start and end points and constrained by scope, time, cost and quality.
Programme
A group of related projects and other work managed in a coordinated way to obtain benefits that could not be realised by managing them individually.
Portfolio
The collection of projects, programmes and other work that an organisation manages together to meet its strategic objectives and optimise overall value.
Project management
The application of methods, tools, techniques and competencies to achieve project objectives, integrating practices iteratively throughout the project life cycle.
ISO 21502 status
ISO 21502 provides guidance only, not requirements, so it cannot be used for certification of conformity or for contractual compliance claims.
Project life cycle
The sequence of phases from project start to end, defined by the nature of the work, the product to be delivered and the level of control required.
Phase gate
A review at the end of a project phase where authorised management decides to continue, modify, hold or terminate the project before the next phase begins.
Project sponsor
The role that authorises the project, secures resources, provides strategic alignment and supports the project manager in resolving escalated issues.
Project manager
The role accountable for achieving project objectives within agreed constraints, integrating all practices and reporting progress to the sponsor and governance body.
Business case
The documented justification for the project investment, stating expected benefits, costs and risks, reviewed at phase gates to confirm continued viability.
Project charter
The document that authorises the project, records its objectives and high-level scope, and establishes the authority of the project manager.
Project governance
The framework of authority, decision rights, policies and oversight structures that directs and controls the project and its alignment with organisational strategy.
Project constraints
Interrelated limiting factors such as scope, schedule, cost and quality; changing one typically affects others, so trade-offs are managed through integrated decisions.
Project stakeholder
A person, group or organisation that can affect, be affected by, or perceive itself to be affected by the project or its outcomes.
Integrated practices
Project management practices that apply across the whole project, such as life cycle, stakeholders, risk, change control, benefits, reporting and information management.
Individual practices
Project management practices applied to specific aspects of the work, such as scope, schedule, cost, quality, resources and procurement management.
Project management plan
The integrated, baselined document combining all subsidiary plans and describing how the project will be executed, monitored, controlled and closed.
Integrated change control
A process that logs every change request, assesses its impact across scope, schedule, cost, quality, risk and benefits, and obtains a decision from the authorised level.
Work breakdown structure
A hierarchical decomposition of the total scope into deliverables; its lowest level, the work package, is where cost and duration are estimated and controlled.
Critical path
The longest path through the project schedule network, which determines the shortest possible project duration and has zero total float.
Total float
The amount of time an activity can be delayed without delaying the project completion date, calculated as late finish minus early finish.
Cost variance
Earned value minus actual cost (CV = EV - AC); a negative value indicates the project is spending more than the value earned.
Schedule variance
Earned value minus planned value (SV = EV - PV); a negative value indicates the project is behind the planned schedule.
Cost performance index
Earned value divided by actual cost (CPI = EV / AC); a value below 1.0 indicates cost inefficiency relative to the work performed.
Schedule performance index
Earned value divided by planned value (SPI = EV / PV); a value below 1.0 indicates less work has been completed than planned.
Risk treatment options
Ways of responding to risk, including avoiding, reducing likelihood or impact, transferring to a third party, sharing, or accepting the risk with a reserve.
Risk owner
The named person accountable for monitoring a specific risk and implementing and evaluating the effectiveness of its agreed treatment actions.
Contingency reserve
An amount of time or money allocated to cover the known risks that have been identified and analysed, held outside the project cost baseline.
Quality control
The practice of inspecting deliverables against documented acceptance criteria and recording results, distinct from quality assurance, which checks process compliance.
Lessons learned register
A repository of knowledge captured throughout the project about what worked and what did not, used to improve the current and future projects.
Communication plan
A document defining which stakeholders receive which information, in what format and channel, at what frequency, and who is responsible for sending it.
Benefits management
The practice of defining, measuring and sustaining the benefits expected from project outputs, often realised after closure and owned by the sponsoring organisation.