PECB ISO 28000 Lead Auditor flashcards
PECB ISO 28000 Lead Auditor · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Security management system
- A set of interrelated elements an organization uses to establish security policy, objectives, and processes to achieve those objectives, following the high-level structure of ISO 28000 clauses 4-10.
- PDCA cycle
- Plan-Do-Check-Act: the continual improvement loop that maps to ISO 28000 clauses 4-6 (Plan), 7-8 (Do), 9 (Check), and 10 (Act), used to classify findings.
- Security risk
- The combination of the likelihood of a security event and its consequences for people, assets, information, or supply continuity, assessed and treated by the organization.
- High-level structure
- The common clause framework (4-10) shared by ISO management-system standards, allowing integrated audits and one-to-one mapping of requirements across standards.
- Top management commitment
- The clause 5 requirement that top management establish policy, assign roles, provide resources, and integrate security into business processes, evidenced by actions not statements.
- SMS scope
- The documented boundary of the security management system, including functions, sites, and activities covered, which must be available as documented information under clause 4.
- Security policy
- Top management's documented statement of security intent, including commitment to satisfy applicable requirements and to continual improvement, communicated within the organization.
- Risk assessment
- The clause 6 process of identifying threats and vulnerabilities, evaluating consequences, and determining controls and objectives consistent with the security policy.
- Documented information
- Information required to be controlled and maintained by the organization, including creation, update, distribution, and retention, as specified in clauses 7 and 8.
- Operational control
- The clause 8 requirement to plan and control processes needed to meet security requirements, including outsourced processes and incident and emergency response.
- Management review
- A clause 9 activity where top management reviews the SMS at planned intervals for continuing suitability, adequacy, and effectiveness, with documented outputs.
- Corrective action
- Action to eliminate the root cause of a nonconformity so it does not recur, with retained evidence of the nature of the nonconformity and results of action.
- Audit definition
- A systematic, independent, and documented process for obtaining objective evidence and evaluating it objectively against audit criteria to determine conformity.
- Audit principles
- Integrity, fair presentation, due professional care, confidentiality, independence, evidence-based approach, and risk-based approach, which guide auditor conduct and judgement.
- Audit criteria
- The set of policies, procedures, or requirements used as a reference against which objective evidence is compared to determine conformity.
- Objective evidence
- Records, statements of fact, or other information verified to be true and traceable to its source, used to support audit findings and conclusions.
- Nonconformity
- The failure to meet a specified requirement, graded as major or minor depending on whether the failure is systemic or isolated.
- Audit programme
- A set of one or more audits planned for a specific time frame and directed toward a specific purpose, managed under ISO 19011 clause 5.
- Audit plan
- A description of the activities and arrangements for a single audit, including objectives, scope, criteria, dates, sites, and team roles.
- Opening meeting
- The meeting at the start of an audit that confirms scope, criteria, methods, communication channels, and that findings are preliminary until the closing meeting.
- Risk-based planning
- Allocating audit time and depth according to the risk profile of processes, so high-risk areas such as access control and incident response receive more attention.
- Checklist use
- Checklists are aids derived from audit criteria and the process approach; they support but do not replace auditor judgement or sampling.
- Evidence collection
- Gathering information through interviews, observation, and document review, recording source, date, and location so findings are traceable and verifiable.
- Process tracing
- Following a shipment, visitor, or incident end-to-end to verify controls at each handoff and confirm that procedures are actually implemented.
- Major nonconformity
- A systemic failure or absence of a required SMS element that affects the capability of the management system to achieve its intended results.
- Minor nonconformity
- An isolated lapse or single observed departure from a requirement that does not indicate a systemic failure of the management system.
- Observation
- A finding that is not a nonconformity but indicates a potential improvement or risk that the organization may wish to address.
- Closing meeting
- The meeting at the end of an audit where findings and their grading are presented, questions are answered, and the auditee is informed of follow-up requirements.
- Audit report
- The documented output of an audit covering objectives, scope, criteria, team, findings with evidence, and conclusions on conformity and effectiveness.
- Corrective action request
- A record requiring the auditee to address a nonconformity through correction, root-cause analysis, and corrective action, verified for closure by the auditor.
- Auditor competence
- The education, training, experience, and personal attributes required to perform audits, maintained through records and used to assign auditors to audits.
- Programme review
- The planned evaluation of the audit programme's performance, using indicators such as on-time completion and repeat findings, to adjust frequency and resources.