This domain tests fieldwork: opening the audit, collecting and verifying evidence, evaluating it against criteria, documenting findings and closing the fieldwork with a clear conclusion. The exam favours scenario questions about sampling, evidence quality and auditor conduct.

Fieldwork rules

  • Hold an opening meeting to confirm scope, criteria, schedule, methods, confidentiality and safety, and to explain sampling.
  • Collect evidence through interviews, observation, document and data review, and site walks. Follow energy flows from source to use and check SEUs on the floor against records.
  • Corroborate evidence. A claim in an interview should be checked against a record or observation; a record should be checked against practice.
  • Evaluate evidence against the audit criteria. Write findings that state the requirement, the objective evidence, and the effect or risk; avoid naming individuals.
  • Keep an audit trail: what was sampled, who was interviewed, what was seen and what was concluded.
  • Hold a closing meeting to present findings and conclusions, explain the nonconformity process, and agree follow-up.

Worked example

The auditor is checking operational control for an SEU. The procedure requires a weekly setpoint check. The operator says checks are done; the log shows weekly entries; observation shows the current setpoint outside the specified range. The auditor records the observed setpoint, the specified range and the log, then writes a nonconformity against Clause 8.1 because control is not effective, not merely because a record is missing.

Traps

Auditing only documents; accepting verbal assurance without verification; writing “poor energy culture” as a finding; debating corrective action during fieldwork; and losing the audit trail when a lead changes.