PECB ISO 55001 Foundation study materials
PECB ISO 55001 Foundation study resources

PECB ISO 55001 Foundation study plan

PECB ISO 55001 Foundation · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Fundamental principles and concepts of an asset management system (AMS)

  • Define asset management, an asset management system (AMS), and the purpose of the ISO 55000 family in your own words without looking at notes

  • Distinguish the terms asset, asset portfolio, asset management, asset management system, and asset management plan, and give one workplace example of each

  • Explain the three core concepts behind ISO 55000: value realization from assets, alignment of asset management with organizational objectives, and the balancing of cost, risk, and performance

  • Map the relationship between ISO 55000 (overview), ISO 55001 (requirements), and ISO 55002 (guidance) and state which one is certifiable

Your checkpoint

A one-page glossary of 12 key terms plus a diagram showing how ISO 55000, ISO 55001, and ISO 55002 relate, self-graded against the standard's definitions

Week 2

Fundamental principles and concepts of an asset management system (AMS)

  • Describe the benefits and costs of an AMS for an organization, including financial, risk, and reputational effects

  • Explain the role of the asset management policy, strategic asset management plan (SAMP), and asset management objectives in linking intent to action

  • Outline the elements of the asset management system as described in ISO 55000, including context, leadership, planning, support, operation, performance evaluation, and improvement

  • Identify the stakeholders of an AMS and explain why their needs and expectations shape the system

Your checkpoint

A 400-word written summary explaining how an asset management policy flows into a SAMP, objectives, and asset management plans, with one worked example from a sector you know

Week 3

Fundamental principles and concepts of an asset management system (AMS)

  • Explain the concept of asset management decision-making across the asset life cycle, from acquisition through disposal

  • Describe the role of risk assessment and risk treatment in prioritizing asset-related actions

  • Summarize the concepts of asset performance, condition, criticality, and lifecycle costing at a foundation level

  • Distinguish leading and lagging indicators used to measure asset management performance

  • Explain the principle of continual improvement and how the Plan-Do-Check-Act cycle applies to an AMS

Your checkpoint

A one-page decision map linking life-cycle stage, typical risk question, and typical performance indicator, reviewed for internal consistency

Week 4

Fundamental principles and concepts of an asset management system (AMS) & ISO 55001 requirements for an AMS

  • Consolidate Domain 1 by answering a self-made set of 30 recall questions on principles, terminology, and benefits with at least 85% accuracy

  • Read the scope and normative references of ISO 55001 and identify which clauses contain requirements versus guidance

  • List the clause structure of ISO 55001 from Clause 4 to Clause 10 and state the title and intent of each clause

  • Explain the difference between a requirement (shall) and a recommendation or note, using examples from ISO 55001

Your checkpoint

A completed clause map of ISO 55001 (Clauses 4-10) with a one-sentence intent statement per clause and a 30-question self-test score recorded

Week 5

ISO 55001 requirements for an AMS

  • Explain the Clause 4 requirements for understanding the organization and its context, including internal and external issues and interested parties

  • Describe the Clause 4 requirements for defining the scope of the AMS and establishing the asset management system and its processes

  • Explain the Clause 5 requirements for leadership commitment, the asset management policy, and organizational roles, responsibilities, and authorities

  • Draft a sample asset management policy that satisfies the Clause 5 requirements

Your checkpoint

A draft asset management policy of 250-350 words plus a scope statement for a fictional organization, checked line by line against Clauses 4 and 5

Week 6

ISO 55001 requirements for an AMS

  • Explain the Clause 6 requirements for planning, including actions to address risks and opportunities, asset management objectives, and planning to achieve them

  • Describe the Clause 6 requirement for strategic asset management planning and how objectives must be measurable and consistent with policy

  • Explain the Clause 7 support requirements covering resources, competence, awareness, communication, and documented information

  • Distinguish the types of documented information required by ISO 55001 and explain why control of documented information matters

Your checkpoint

A table listing at least 10 Clause 6 and Clause 7 requirements, each with a concrete example of evidence an auditor could expect to see

Week 7

ISO 55001 requirements for an AMS

  • Explain the Clause 8 operational planning and control requirements, including criteria, control of outsourced processes, and management of change

  • Describe the Clause 9 requirements for monitoring, measurement, analysis, evaluation, internal audit, and management review

  • Explain the Clause 10 requirements for nonconformity, corrective action, and continual improvement

  • Trace how one nonconformity would move from detection through corrective action and into management review

Your checkpoint

A worked nonconformity case study of 300 words tracing Clauses 9 to 10, including root cause, corrective action, and the management review input it generates

Week 8

Fundamental principles and concepts of an asset management system (AMS) & ISO 55001 requirements for an AMS

  • Review all eight weeks of notes and produce a condensed revision sheet of no more than three pages

  • Answer a full-length mock examination of at least 60 mixed questions with a target score of 80% or higher

  • Re-teach the five weakest topics aloud in under five minutes each without notes

  • Verify that every ISO 55001 clause requirement can be matched to at least one example of evidence

  • Plan examination-day logistics, including timing strategy for scenario-based questions

Your checkpoint

A recorded mock-exam score of 80% or higher plus a final three-page revision sheet covering both domains

Milestones

Week 2: Can explain the ISO 55000 family structure and the policy-to-plan flow in under 10 minutes without notes

Week 4: Scores at least 85% on a 30-question Domain 1 self-test and has a complete ISO 55001 clause map

Week 6: Can state the Clause 4 to Clause 7 requirements and give one evidence example for each without consulting notes

Week 8: Scores 80% or higher on a 60-question mixed mock exam and has a finished three-page revision sheet