Nordwind Industrietechnik is a 780-person German manufacturer of hydraulic components. Its managing director wants ISO 56001 certification within 12 months and has asked you to assess readiness. The company's innovation register lists 42 'innovation projects', all of which are engineering change requests opened by the R&D department; 6 reached the market last year, and 3 of those were cost-reduction variants of existing products. There is no record of customer or supplier insight being used to originate ideas, and the sales director says innovation 'belongs to R&D'. The company operates three sites: the main plant in Kassel, a sales office in Lyon, and a 49%-owned joint venture in Poland that uses the Nordwind brand but has its own management system. The MD wants the certification scope to cover 'all Nordwind innovation activities worldwide' because, he says, a narrower scope 'looks weak to customers'.

1. Assess whether Nordwind's 42-item innovation register demonstrates conformity with the ISO 56001 concept of innovation. What must change in how the organization identifies and records innovation, and why?

Read the worked answer

What the standard actually requires. Innovation is defined as a new or changed entity that realizes or redistributes value. Two elements must both be present: novelty (to the organization, not necessarily to the world) and realized value. Nordwind's register demonstrates neither systematically.

Diagnosis of the 42 projects.

  • All 42 are engineering change requests raised inside R&D. That is an input channel, not an innovation portfolio. Ideas originating from customers, suppliers, service technicians or regulatory change are invisible, so the organization cannot show it exploits insights.
  • Six launches in a year is plausible, but cost-reduction variants are innovations only if value is realized and evidenced. A specification change with no measured benefit is an improvement, not an innovation. Conversely, do not dismiss them: incremental innovation is squarely in scope.
  • Nothing links projects to strategic direction, so the register cannot support portfolio decisions or the objectives required by Clause 6.

What must change. Introduce classification at intake: type (product, service, process, business model, method), degree of novelty (incremental or radical), and a value hypothesis stating who captures what value. Record at closure the evidence of realized value (sales, margin, cycle time, customer outcome). Separate the innovation portfolio from routine engineering change control while allowing a change request to be promoted into the portfolio on defined criteria.

Audit test. An auditor will sample three to five entries and ask: what was new, for whom, what value was realized, and how do you know? Nordwind currently fails that test on most entries.

2. Determine and justify the certification scope. Should the Polish joint venture and the Lyon sales office be included?

Read the worked answer

Rule. The scope statement must be accurate and must not mislead. It describes the boundaries within which the management system is applied and audited. It cannot include an entity the client does not control and that is not covered by the client's management system.

Poland (49% JV) - exclude. Nordwind has no management authority over the JV, which runs its own management system and governance. Placing it under 'all Nordwind innovation activities worldwide' would misstate the scope and, if discovered at Stage 2 or during surveillance, is a serious integrity issue that can lead to suspension. If the JV's innovation work matters commercially, the routes are a separate certification for the JV or a change in control, which is not the case at 49%.

Lyon - include only if it performs IMS processes. If the sales office captures customer insights and deploys solutions in the French market under the same control, it can legitimately be listed as a site. If it only sells and executes no IMS process, listing it adds audit surface without benefit.

Kassel - include. This is where the innovation process actually operates.

Recommended wording. 'Design, development and deployment of hydraulic components and related innovation activities at Kassel (DE) and Lyon (FR).' Document the justification for the boundary under Clause 4.3.

Advice to the MD. A precise scope reads as competence to an auditor and to sophisticated customers; an over-broad scope reads as a warning sign and will be tested at Stage 2.

3. Which context and interested-party issues must be addressed under Clause 4 before the register can be judged conformant? Explain the consequence of skipping this step.

Read the worked answer

Requirement. Clause 4 requires determination of external and internal issues relevant to purpose and strategic direction, and of interested parties and their relevant requirements. This is not paperwork; it supplies the criteria against which everything else is judged.

Issues to capture for Nordwind.

  • External: electrification displacing hydraulic demand in some segments; EU machinery and pressure-equipment regulation; price pressure from low-cost suppliers; availability of engineering talent; customer consolidation.
  • Internal: R&D concentrated at one site; a culture that assigns innovation to R&D; current IP position; digital and simulation capability.
  • Interested parties: OEM customers requiring shorter development cycles and documented change control; suppliers; employees and works council; regulators; the JV partner; insurers.

Consequences of skipping. Without this, the innovation strategy has no basis, opportunities cannot be prioritized because there is no strategic-fit criterion, the portfolio cannot be balanced across horizons, and risks and uncertainties cannot be identified. Objectives set under Clause 6 become arbitrary numbers. In audit terms the findings cascade: the auditor will try to trace objectives and risk-register entries back to identified issues and will not find the link.

Practical step. A half-day workshop with the MD, sales, engineering and finance producing a context and interested-party register, reviewed annually and on significant change such as losing a major OEM account.