Fundamental Principles and Concepts of Information Security, Cybersecurity, and Privacy

  • Confidentiality, integrity and availability (CIA) are the three core information security properties; ISO/IEC 27000 defines each and they anchor every control objective in ISO/IEC 27002:2022.

  • Information security preserves CIA; cybersecurity adds the protection of networks, systems and data against digital attack, including resilience and the ability to recover.

  • Privacy protection concerns the rights of natural persons (PII principals) and is governed by principles such as lawfulness, purpose limitation, data minimisation, accuracy, storage limitation, and accountability.

  • ISO/IEC 27701 extends ISO/IEC 27001 and 27002 to PII controllers and processors; privacy controls are additive to, not a substitute for, information security controls.

  • Risk is defined as the effect of uncertainty on objectives, expressed as a combination of likelihood of an event and its consequence; ISO/IEC 27005 provides the risk management guidance.

  • The 2022 edition of ISO/IEC 27002 restructured controls into four themes: organizational (37), people (8), physical (14) and technological (34), totalling 93 controls.

  • Five control attributes are used for classification: control type (preventive, detective, corrective), information security properties (CIA), cybersecurity concepts (identify, protect, detect, respond, recover), operational capabilities, and security domains (governance, protection, defence, resilience).

  • Defence in depth layers preventive, detective and corrective controls; no single control is assumed sufficient, and compensating controls address residual risk where a primary control is not feasible.

  • Threat, vulnerability, likelihood and impact are distinct: a threat exploits a vulnerability, likelihood estimates occurrence, and impact measures consequence on CIA or on PII principals.

Quick reference

ISMS and Initiation of ISO/IEC 27002 Controls Implementation

  • ISO/IEC 27001 specifies requirements for establishing, implementing, maintaining and continually improving an ISMS; ISO/IEC 27002 is guidance and is not certifiable on its own.

  • Plan-Do-Check-Act (PDCA) underpins continual improvement; ISO/IEC 27001:2022 clauses 4-10 map to context, leadership, planning, support, operation, performance evaluation and improvement.

  • Clause 6.1 requires risk assessment and risk treatment, and 6.1.3 requires a Statement of Applicability (SoA) listing each Annex A control, its applicability, justification, and implementation status.

  • Annex A of ISO/IEC 27001:2022 mirrors the 93 controls and 4 themes of ISO/IEC 27002:2022; the SoA must reference all 93 controls even where exclusion is justified.

  • Scope definition (clause 4.3) must consider internal and external issues, interested parties, interfaces and dependencies; scope exclusions require justification in the SoA.

  • Risk treatment options per ISO/IEC 27005 are: modify (mitigate), retain (accept), avoid, and share (transfer); selected options drive control selection from ISO/IEC 27002.

  • Gap analysis compares current controls against the ISO/IEC 27002:2022 control set to produce a remediation roadmap prioritised by risk, cost and dependency.

  • Documented information required includes the ISMS scope, information security policy, risk assessment and treatment results, SoA, and evidence of competence and monitoring.

  • Top management must demonstrate leadership through policy approval, resource provision, assignment of roles, and integration of information security into business processes (clause 5).

Quick reference

Organizational and People Controls (ISO/IEC 27002:2022 Themes 5 and 6)

  • Organizational controls (5.1-5.37) include policies, roles and responsibilities, segregation of duties, threat intelligence, information classification, access control policy, supplier relationships, incident management, business continuity and legal compliance.

  • Information classification (5.12) and labelling (5.13) require a scheme defining levels, handling rules, and a defined owner who approves classification and access decisions.

  • Access control (5.15-5.18) follows need-to-know and least privilege; access rights are granted through a formal request, reviewed at defined intervals, and removed on termination.

  • Supplier relationships (5.19-5.22) require due diligence before contracting, security requirements in agreements, monitoring of service delivery, and management of changes to supplier services.

  • Information security incident management (5.24-5.28) covers planning, reporting channels, assessment and decision, response, and learning from incidents; evidence collection must preserve chain of custody.

  • Business continuity (5.29, 5.30) requires ICT readiness planning based on business impact analysis, with recovery objectives (RTO, RPO) defined and tested.

  • Legal, statutory and contractual requirements (5.31-5.34) include identification of applicable legislation, protection of intellectual property, records retention, and privacy and PII protection.

  • People controls (6.1-6.8) cover screening, terms and conditions of employment, awareness and training, disciplinary process, post-termination responsibilities, confidentiality agreements and remote working.

  • Screening (6.1) must comply with law and ethics and be proportionate to the role's sensitivity and the classification of information the person will access; background verification is repeated where justified.

Quick reference

Physical and Technological Controls (ISO/IEC 27002:2022 Themes 7 and 8)

  • Physical controls (7.1-7.14) include perimeter protection, physical entry controls, securing offices and facilities, monitoring, protection against physical and environmental threats, and secure disposal or reuse of equipment.

  • Clear desk and clear screen (7.7) and secure disposal (7.14) require defined rules for unattended media and verified destruction or sanitisation before equipment leaves the organisation.

  • Technological controls (8.1-8.34) include endpoint protection, privileged access rights, information access restriction, cryptography, logging, backup, data leakage prevention, and secure development.

  • Privileged access rights (8.2) require restriction and management of administrative accounts, separate accounts for administrative tasks, and logging of privileged activity.

  • Cryptography (8.24) requires a policy defining when and how cryptographic controls are used, including key management lifecycle: generation, distribution, storage, rotation, revocation and destruction.

  • Logging (8.15, 8.16) requires event logs recording activities, exceptions and faults, with clocks synchronised and monitoring activities defined for anomaly detection.

  • Backup (8.13) requires backup copies of information, software and systems, tested at defined intervals and protected in accordance with the classification of the source data.

  • Secure development (8.25-8.31) covers secure coding principles, security requirements analysis, separation of development, test and production environments, and protection of test information.

  • Technical vulnerability management (8.8) requires timely identification of vulnerabilities, risk-based evaluation, patching, and management of the exposure window; it is distinct from penetration testing.

Quick reference

Performance Measurement, Testing and Monitoring of ISO/IEC 27002 Controls

  • Clause 9.1 requires monitoring, measurement, analysis and evaluation with defined: what is monitored, methods, when, who, and when results are analysed and evaluated.

  • Clause 9.2 requires internal audit at planned intervals, with an audit programme considering the importance of processes and prior results; auditors must be independent of the audited activity.

  • Clause 9.3 requires management review at planned intervals covering audit results, nonconformities, monitoring results, risk assessment status, and opportunities for improvement.

  • Key performance indicators measure control effectiveness (e.g., percentage of access reviews completed on time); key risk indicators measure exposure trends; both need baselines and targets.

  • Control testing methods include walkthrough, observation, inspection of evidence, re-performance, sampling, and technical testing such as vulnerability scanning and penetration testing.

  • Evidence must be sufficient, reliable and time-bound; sampling size should reflect population size and risk, and exceptions must be recorded with root cause analysis.

  • Nonconformity and corrective action (clause 10.2) require identifying the cause, evaluating the need for action, implementing it, reviewing effectiveness, and retaining documented information.

  • Penetration testing should follow a defined scope and rules of engagement, be performed by competent testers, and results fed into the risk treatment process rather than treated as an audit substitute.

  • Metrics should be SMART (specific, measurable, achievable, relevant, time-bound) and reported to management; trends across periods are more informative than single-point measurements.