PRC EPLE study materials
PRC EPLE study resources

Who May Sign the Test Report?

PRC EPLE · Put your knowledge to work in context.

All case studies

Who May Sign the Test Report?

A PRC-registered electronics testing laboratory has one PECE (the owner), two ECEs, and four ECTs. On a Friday the PECE leaves for a conference. A client delivers three 13.8 kV/400 V dry-type transformers for routine insulation-resistance, winding-resistance, and ratio tests. The ECT on duty performs the tests, fills in the raw data sheets, and issues a final test report on the laboratory letterhead over his signature, writing 'for the Resident Engineer.' The client submits the report to the distribution utility to support energization on Monday. The PECE returns Tuesday and is asked to 'back-sign' the report because the utility will not accept it otherwise. The raw data sheets show one transformer's insulation resistance at 60 seconds was 1.1 GΩ at 30 °C, and the ratio test on another unit deviated by 0.6% from nameplate. The ECT noted both as 'pass' based on the client's acceptance criteria.

1. Identify the regulatory and technical defects in the report and in the laboratory's practice.

Read the worked answer

The main regulatory defect is that the final test report was issued by an ECT over his own signature, with no supervising ECE or PECE identified as responsible. ECTs may perform routine tests under supervision, but the report that certifies results must be under the direction and review of the engineer responsible for the test. Writing 'for the Resident Engineer' does not transfer responsibility and is misleading because no named engineer reviewed the work. 'Back-signing' after the report has already gone to the utility would be a false attestation unless the PECE actually reviews the data and accepts responsibility. The technical defects are also serious. A 0.6% ratio deviation may exceed the applicable tolerance; transformer ratio tolerance is commonly ±0.5% of the declared ratio under the applicable standard, so the ECT's 'pass' must be checked against the correct acceptance criterion. The insulation-resistance value of 1.1 GΩ at 30 °C must be temperature-corrected and compared with the specified minimum, not merely marked pass. The report should also identify the instrument calibration status, test voltage, and test conditions.

2. What must the PECE do before any signature is applied, and what should he do if the utility's Monday deadline cannot be met?

Read the worked answer

Before signing, the PECE must review the raw data sheets, the test method, the instrument calibration certificates, the test conditions, the nameplate data, and the applicable acceptance criteria. He must confirm that the ECT was competent and supervised, and that the recorded values are complete and internally consistent. If the data are insufficient or the ratio result is outside tolerance, he must not certify a pass. He should authorize re-testing or issue a factual report that states the measured values, the applicable limits, and any nonconformance. If the Monday deadline cannot be met with a truthful report, he should tell the client and the utility in writing that a preliminary data report is available but that certification is pending resolution of the nonconformance. He should not sign a 'pass' report to meet the energization schedule. If the transformer is nonconforming, the proper outcome is a report that supports engineering disposition, not a false clearance.

3. What changes should the laboratory make to its supervision and signing procedures?

Read the worked answer

The laboratory should adopt a written supervision plan that names the supervising ECE or PECE for each test category and states who may release reports. Only authorized signatories should appear on the letterhead, and every report should show the name and PRC registration number of the responsible engineer. ECT-prepared data should be reviewed before a report is released, and the report should state that the tests were performed under the supervision of the named engineer. The laboratory should keep raw data, calibration records, and review checklists, and it should prohibit 'back-signing' after release. It should also define what happens when the supervising engineer is absent: either reschedule the test or have another qualified engineer review and sign. Finally, acceptance criteria should come from the applicable standard or the client's approved specification, not from an informal 'client criteria' note, and any deviation should be escalated before a pass or fail is recorded.