HEO Crawler Crane NC III study materials
HEO Crawler Crane NC III study resources

HEO Crawler Crane NC III: Occupational safety and health, including crane signals and exclusion zones

HEO Crawler Crane NC III · Work through your exam, one topic at a time.

All guide sections

Occupational safety and health, including crane signals and exclusion zones

Occupational safety and health, including crane signals and exclusion zones

This domain tests the safety system around the lift: who signals, who is excluded, and what stops the job.

Signals and communication

  • One designated signalman, identifiable by vest or gloves, with a clear view of the load and the operator. Anyone may give the emergency stop signal and the operator must obey it.
  • Signals are agreed at the pre-lift briefing. If signals are ambiguous or the distance is too great, switch to radio on a dedicated channel with a hand-signal fallback. An unclear signal is a stop signal.
  • Standard signals include hoist and lower (forefinger circling), boom up/down, swing left/right, travel, dog everything (clenched fists), stop (one hand), emergency stop (both hands).

Exclusion zones

  • Barricade the full swing radius measured from the centre of rotation, covering the largest of load radius plus load dimension, tail swing, and lagging sweep, plus a buffer.
  • Nobody under a suspended load; no hands on the load to steady it - use tag lines from outside the fall zone.
  • Maintain crane-to-crane and crane-to-structure clearance and control access with barriers and a banksman.
  • Weather, lighting and heat are part of the zone: state wind limits, lightning stop criteria, and lighting for night work.

Worked example

A crane with 4.5 m tail swing working at 12 m radius. The controlling dimension is the 12 m load radius plus the carried load dimension, not the smaller 4.5 m tail swing; barricade that larger envelope plus a buffer, and keep the signalman outside it with a clear line of sight.

Traps

Letting an unbriefed rigger signal; standing inside the swing radius to "guide" the load; assuming only the signalman can call stop; forgetting counterweight tail swing when the boom is short.