Masonry NC II study materials
Masonry NC II study resources

Masonry NC II cheat sheet

Masonry NC II · Keep the key ideas within reach.

Quick reference

Workplace Communication

  • A complete work instruction answers: what to build, where, to what dimension, with what material, by when, and who verifies it.

  • Verbal instructions must be confirmed by repeating them back to the speaker; unresolved differences are escalated in writing before work proceeds.

  • A bar chart or work schedule links each activity to a start date, finish date, predecessor, and crew size - use it to sequence masonry after structural framing and before finishing trades.

  • Standard hand signals for crane and hoist work: raised fist = stop, open palm up = hoist, open palm down = lower, arm extended and pointing = travel direction.

  • Daily site records (manpower, weather, work accomplished, deliveries received, instructions received) form the basis of progress claims and delay documentation.

  • A material requisition states unit, quantity, size, grade, and required delivery date; a delivery receipt is signed only after count and visual inspection.

  • Written change orders or site instructions must be signed and dated by the authorized representative before the affected work is executed.

  • Toolbox talks are logged with topic, date, attendees' signatures, and the hazard discussed; the log is the evidence of communication.

Quick reference

Workplace Safety and Housekeeping

  • Personal protective equipment minimum on a masonry site: hard hat, safety footwear, eye protection, and gloves; add hearing protection near cutters and respirator when cutting silica-bearing units dry.

  • Fall protection is required at heights of 2 m or more, or where a fall hazard exists over openings, edges, or impalement hazards.

  • Scaffold rules: full planking, guardrails at approximately 1 m and 0.5 m, toe boards, stable footing, and inspection tagging before first use each shift.

  • Silica dust control hierarchy: substitution, wet cutting or water suppression, local exhaust ventilation, then respiratory protection as the last line.

  • Ladder setup: 4:1 slope for leaning ladders, extend 1 m above the landing, secure top and bottom, and maintain three points of contact.

  • Housekeeping rule: keep walkways and egress clear, remove offcuts and mortar spill at each shift end, and stack units at a stable height on level ground.

  • Manual handling limit for one person is roughly 25 kg at waist height; use two-person lifts, wheelbarrows, or mechanical hoists for heavier units.

  • Emergency response: know the assembly point, first-aid station, and the location of the nearest fire extinguisher and electrical disconnect before starting work.

Quick reference

Tool, Equipment, and Material Handling

  • Bricklayer's trowel sizes: 250-300 mm blade for general work; pointing trowel 150-200 mm for filling joints; margin trowel for tight areas.

  • Line and pins establish course alignment; a spirit level checks level and plumb, and a corner block or story pole transfers course heights.

  • A mason's line is stretched taut and checked at mid-span for sag; sag produces a bowed wall that fails the straightedge check.

  • Concrete mixer capacity is rated in drum volume; the batch must not exceed roughly 10 percent below the drum's rated capacity to allow proper tumbling.

  • Mortar board and hawk are kept clean; hardened mortar on tools is removed with water and a wire brush, never by striking against the wall.

  • Abrasive cutters for masonry units require water suppression or dust extraction, a full guard, and correct wheel rating for the machine's RPM.

  • Storage: cement bags on pallets, off the ground, under cover, and used oldest first; aggregate stockpiles separated by type and kept free of soil.

  • Inspection rule: tag out and remove from service any tool with a damaged cord, cracked handle, missing guard, or worn cutting wheel.

Quick reference

Interpretation of Drawings and Specifications

  • Drawing set order: title sheet, site plan, floor plans, elevations, sections, details, schedules, and structural drawings; the structural drawing governs member sizes.

  • Scale reading: verify the stated scale, then confirm a known dimension with a scale rule before taking off any measurement from the print.

  • A masonry unit schedule gives type, nominal dimensions, compressive strength, and joint thickness; the general notes give mortar class and reinforcement.

  • Nominal vs actual dimensions: a 200 mm concrete hollow block is nominally 200 mm wide but actual width is about 190 mm, with the 10 mm joint making up the module.

  • Section markers, detail callouts, and grid lines link plans to details; always trace a detail back to its location on the plan before building it.

  • Specifications override general notes when they conflict; where drawings and specifications conflict, raise a request for information before proceeding.

  • Symbol conventions: solid line = visible edge, dashed line = hidden or above, centerline = axis of symmetry, hatch = material type.

  • Control dimensions are the ones used for setting out; never scale a dimension that is written, and never assume a dimension that is missing.

Quick reference

Layout and Setting Out

  • Setting out sequence: establish the reference line or baseline from the site plan, then set corners by offset and diagonal check.

  • 3-4-5 method: measure 3 units along one line and 4 along the perpendicular, and adjust until the diagonal reads 5 units - this produces a right angle.

  • Rectangular check: both diagonals of a rectangle must be equal; a difference of more than about 5 mm over a 10 m building requires re-setting.

  • Profile boards and batter boards are set back from the excavation edge so they survive digging; string lines between them mark wall faces and column centers.

  • The module of masonry is unit length plus joint thickness; course heights are set out from a story pole marked with the actual unit-plus-joint increments.

  • Level datum is transferred from a benchmark with a level or water level; all floor levels and finished floor heights reference the same datum.

  • Wall thickness set-out line: mark both faces of the wall, not just the centerline, so the mason can check thickness continuously.

  • Tolerances: plumb and level deviation is generally held within 10 mm over a storey height and 5 mm over 3 m of wall length unless the specification is stricter.

Quick reference

Mortar Mixing and Preparation

  • Mortar types by cement-to-lime-to-sand proportion by volume: Type M 1:1:6, Type S 1:1/2:4 1/2, Type N 1:1:6, Type O 1:2:9 - higher cement content gives higher strength.

  • Type N is the general-purpose mortar for exposed above-grade masonry; Type S is used where higher flexural or compressive strength is needed; Type M for severe exposure.

  • Water is added to reach a workable consistency, roughly a slump of 100-150 mm on a flow test; too much water reduces strength and increases shrinkage.

  • Mortar must be used within about 1.5 hours of mixing in cool weather and 1 hour in hot weather; retempering with water is limited to one addition.

  • Batch measurement is by volume with a consistent gauge box; the sand must be measured damp and allowance made for bulking of moist sand.

  • Sand for mortar is clean, well graded, and free of organic matter and clay lumps; a dirty sand raises water demand and lowers strength.

  • Mixer sequence: add part of the water, then sand and cementitious materials, then the balance of water; mix 3-5 minutes after all materials are in.

  • Mortar joints are typically 10 mm thick; joints thinner than about 6 mm or thicker than about 13 mm reduce bond and compressive strength.

Quick reference

Laying and Bonding of Masonry Units

  • Bond rules: vertical joints in successive courses must be offset by at least one-quarter of the unit length; continuous vertical joints are prohibited.

  • Running or stretcher bond offsets each course by half a unit; header bond uses headers to tie two leaves; English bond alternates header and stretcher courses; Flemish bond alternates stretcher and header in the same course.

  • Full bed and full head joints are required; a face-shell-bedded hollow block wall relies on the shell area and is specified only for non-structural or low-load walls.

  • Frog-up versus frog-down: solid units are laid with the frog upward unless the specification states otherwise; hollow units are laid with the larger face up.

  • Course height control uses a story pole and line; the line is moved up every course and checked for level at both ends and mid-span.

  • Units are laid with a slight tapping motion to set the joint, never by sliding, which smears mortar and breaks bond.

  • Toothing and racking: a wall left for the day is stepped or raked back, not left as a straight vertical joint, so the next lift can bond into it.

  • Hollow unit walls are laid from the corners, with the first course set on a full mortar bed and checked for level and square before continuing.

Quick reference

Reinforcement, Anchoring, and Structural Components

  • Horizontal joint reinforcement is laid in the mortar bed at specified vertical intervals, typically every second course or as shown on the structural drawings.

  • Reinforcement must be embedded with adequate cover; mortar cover to steel in exposed masonry is generally at least 15-20 mm.

  • Grout for reinforced hollow masonry is a high-slump mix placed in lifts; lifts are limited in height and consolidated to avoid voids around the steel.

  • Lintels span openings and must bear on the wall at each end by the specified bearing length, commonly 100-150 mm, and never bear on a hollow unit's void.

  • Wall ties connect leaves of a cavity wall; they are spaced per specification and sloped slightly to shed water toward the outer leaf.

  • Anchors into concrete or masonry are selected by load type (tension, shear, combined), base material, and edge distance; expansion, adhesive, and screw anchors behave differently.

  • Movement joints accommodate expansion and contraction; they are located at changes in height, at junctions with other materials, and at specified intervals along long walls.

  • Beams, columns, and bond beams are cast or placed in the sequence shown on structural drawings; masonry is not loaded by a member until the member has reached adequate strength.

Quick reference

Finishing, Curing, and Quality Control

  • Joint finishes: flush, weathered (recessed at the bottom), struck or keyed, and raked; the specified profile is applied when the mortar is thumb-print hard.

  • Tooling compacts the mortar at the joint face and improves weathertightness; a joint left as cut by the trowel is more permeable.

  • Curing keeps moisture in the mortar; masonry is protected from rapid drying by wind and sun for at least the first 24-72 hours depending on specification.

  • Hot-weather precautions: shade the materials, use cooler water, keep units damp, and avoid laying on a hot dry surface that pulls water from the mortar.

  • Cold-weather rule: protect masonry from freezing until the mortar has gained strength; do not lay on a frozen bed or with frozen materials.

  • Quality checks: plumb with a level or plumb bob, level with a spirit level, straightness with a straightedge and line, and joint thickness with a rule at several points.

  • Compressive strength acceptance is by sampling mortar or masonry prisms per the specification; results are compared with the specified class.

  • Acceptance criteria for finished walls include alignment within tolerance, full joints, correct bond pattern, clean face, and no unplanned shrinkage cracks.

Quick reference

Maintenance and Repair of Masonry Works

  • Diagnose before repairing: distinguish settlement cracks (diagonal, wider at one end) from shrinkage cracks (uniform, often at joints) and from thermal movement cracks.

  • Crack repair: clean the crack, wet the surface, and fill with a compatible mortar or sealant; movement cracks use a flexible sealant, not rigid mortar.

  • Repointing sequence: cut out the old mortar to a depth of at least twice the joint width (minimum 10 mm), clean, wet, and fill in compacted layers.

  • Repair mortar must be compatible with the original - usually weaker and more permeable than the unit, so the mortar fails before the masonry does.

  • Efflorescence is removed by dry brushing and flushing with clean water; persistent recurrence indicates a water source that must be corrected.

  • Spalling and delamination are often caused by moisture ingress and salt crystallization; repair requires correcting the water path, not just patching the face.

  • Replacement of units: remove the damaged unit without loading the wall above, clean the pocket, and re-bed the new unit with full mortar contact.

  • Maintenance schedule: inspect joints, flashings, weepholes, and movement joints after each rainy season and record defects with location and extent.