Tile Setting NC II study materials
Tile Setting NC II study resources

Tile Setting NC II study plan

Tile Setting NC II · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Tile laying and fixing (floor, wall, and special features) & Tools, equipment and materials selection, use and maintenance

  • Identify and describe the functions of at least 10 tile-laying tools and materials (trowels, spacers, levels, cutters, adhesives, etc.)

  • Explain the sequence of steps for laying floor tiles on a concrete substrate, from surface prep to grouting

  • Demonstrate the correct method for checking substrate flatness with a straightedge and level

  • List the personal protective equipment (PPE) required for tile setting tasks and explain why each is needed

Your checkpoint

Create a written checklist of tools and PPE for a typical floor-tiling job, with a brief description of each item's use.

Week 2

Tile laying and fixing (floor, wall, and special features) & Workplace safety and housekeeping (5S)

  • Describe the 5S methodology (Sort, Set in order, Shine, Standardize, Sustain) and give two examples of each in a tiling workplace

  • Demonstrate proper housekeeping procedures for a tiling work area, including waste segregation and cleanup

  • Explain safe handling and storage of tile adhesives, grouts, and chemicals according to label instructions

  • Identify common workplace hazards in tiling (silica dust, sharp edges, heavy loads) and propose control measures

Your checkpoint

Produce a 5S audit checklist for a tiling workshop, with at least 15 checkpoints and a scoring system.

Week 3

Tile laying and fixing (floor, wall, and special features) & Surface preparation and setting-out

  • Prepare a concrete floor surface for tiling: clean, repair cracks, and apply primer as per specification

  • Set out a tile layout for a rectangular room using the 3-4-5 method to establish squareness

  • Calculate the number of tiles needed for a given area, accounting for cuts and waste (minimum 10% allowance)

  • Demonstrate the correct technique for back-buttering and notching adhesive with a trowel

Your checkpoint

Produce a setting-out plan for a 3m x 4m room, including tile layout, starting point, and cut tile locations, with calculations.

Week 4

Tile laying and fixing (floor, wall, and special features) & Cutting and shaping of tiles

  • Cut ceramic and porcelain tiles using manual and electric cutters, achieving clean edges without chipping

  • Shape tiles for obstacles (pipes, corners, outlets) using hole saws, angle grinders, and nippers

  • Install floor tiles in a dry layout, then fix them with adhesive, maintaining consistent joint widths

  • Install wall tiles on a vertical surface, ensuring plumb and level alignment

Your checkpoint

Complete a practical project: tile a 1m x 1m practice board with a mix of full and cut tiles, including one hole for a pipe, and photograph the result.

Week 5

Mortar and adhesive mixing and application & Grouting, sealing and finishing

  • Mix tile adhesive and grout to the correct consistency according to manufacturer instructions, using a mixing paddle and drill

  • Apply adhesive uniformly with the correct trowel size and notch shape for the tile type and substrate

  • Grout a tiled area, filling joints completely and cleaning excess without disturbing the joints

  • Apply sealant (silicone) around edges and in wet areas, achieving a smooth, neat finish

Your checkpoint

Create a step-by-step guide for mixing and applying adhesive and grout, including ratios, tools, and curing times, and demonstrate on a small sample.

Week 6

Interpretation of drawings, plans and specifications & Workplace communication

  • Read and interpret a simple floor plan and elevation drawing, identifying tile types, sizes, and layout patterns

  • Extract quantities from drawings to create a material take-off list for tiles, adhesive, and grout

  • Communicate effectively with a client or supervisor to clarify tiling specifications and report progress

  • Interpret specification sheets for tile products, including PEI rating, water absorption, and slip resistance

Your checkpoint

Given a sample drawing, produce a material take-off and a written communication (email or memo) summarizing the tiling plan and any clarifications needed.

Week 7

Quality control, defect identification and rectification & Workplace safety and housekeeping (5S)

  • Inspect a tiled surface for common defects: lippage, hollow spots, uneven joints, efflorescence, and cracking

  • Diagnose the causes of at least three common tiling defects and propose corrective actions

  • Demonstrate the tap test to detect hollow tiles and explain acceptable tolerances

  • Review and apply 5S principles to maintain an organized and safe work area during and after tiling

Your checkpoint

Conduct a quality inspection of a tiled area (your practice board or a real job) and produce a defect report with photos and recommended fixes.

Week 8

Tile laying and fixing (floor, wall, and special features) & Quality control, defect identification and rectification & Workplace communication

  • Integrate all skills to complete a small tiling project from planning to finishing, including surface prep, layout, cutting, fixing, grouting, and sealing

  • Perform a final quality check and rectify any defects identified

  • Document the project with a before-and-after photo log and a brief written report

  • Explain the importance of client communication and handover procedures in tiling work

Your checkpoint

Complete a comprehensive tiling project (e.g., a small bathroom floor or kitchen backsplash) and submit a portfolio with photos, material list, and self-assessment against quality standards.

Milestones

Week 2: Pass a 20-item quiz on tools, materials, and safety with at least 80% correct.

Week 4: Successfully tile a 1m x 1m practice board with cuts and a pipe hole, meeting criteria for alignment, joint width, and cleanliness.

Week 6: Accurately interpret a provided drawing and produce a material take-off with less than 10% error.

Week 8: Complete a full tiling project and pass a self-assessment checklist covering all domains with at least 90% compliance.