A private hospital operates 45 ICU ventilators across three models, aged two to nine years. The annual failure rate is 14%, mean downtime is 36 hours, and the OEM service contract costs PKR 22 million per year, about 18% of the fleet’s capital value. A third-party bidder offers PKR 8.5 million per year with a 24-hour response, but has no ISO 13485 certification, proposes non-OEM flow sensors and batteries, and cannot provide a ventilator test bench. The hospital has two biomedical engineers but no calibrated ventilator analyser. The ICU director wants to accept the lower bid to free budget for new monitors. DRAP requires that servicing maintain the device’s safety and performance, and the hospital’s accreditation body will audit maintenance records.

1. Evaluate the two bids using risk, lifecycle cost, and regulatory criteria. Recommend a decision.

Read the worked answer

The lower bid is not automatically the lower risk. The third-party price is attractive, but three gaps matter: no ISO 13485-quality system, non-OEM flow sensors and batteries, and no test bench. Flow sensors directly affect tidal volume and trigger performance; a non-OEM sensor without calibration evidence can cause subtle under- or over-ventilation. Batteries are safety-critical during power failure. Without a ventilator analyser, neither the vendor nor the hospital can verify delivered volume, pressure, leakage, and alarm function after repair.

The OEM contract is expensive but includes validated parts, software support, and documented test methods. The third-party bid may still be usable for non-critical preventive maintenance if it can demonstrate competence. A reasonable decision is a hybrid: retain OEM support for the two newest or highest-acuity ventilators and for any software or recall work; competitively tender preventive maintenance and first-line repairs for the older fleet, conditional on ISO 13485 or equivalent quality evidence, OEM-trained technicians, traceable parts, and access to a calibrated test bench. Require the vendor to use the hospital’s analyser or provide one.

Compare total cost, not contract price: 14% failure and 36-hour downtime already imply clinical risk and cancelled cases. A cheap contract that lengthens downtime is not a saving.

2. Specify the contract KPIs, acceptance tests, and record-keeping you would require before signing with any service provider.

Read the worked answer

KPIs should be measurable and linked to clinical availability: response within 2 hours for a ventilator in use, on-site within 4 hours, restoration within 24 hours or provision of a loaner, and monthly uptime of at least 98% for the fleet. Include penalties for missed response and repeated failures, and a right to audit subcontracted work. Require a named service manager and a 24/7 contact.

Acceptance tests after every repair or preventive maintenance should include delivered tidal volume and pressure accuracy, leakage, oxygen concentration, alarm and safety-valve function, battery runtime under load, and electrical safety. Use a calibrated ventilator analyser and record the calibration certificate. The provider must supply traceable part numbers, lot numbers, and evidence that non-OEM parts meet the original specification. Software changes must be authorised and recorded.

Record-keeping should be device-specific: asset ID, service history, parts used, test results, technician identity, and next-due date. The hospital should retain ownership of records and receive them in a format usable for accreditation. Require immediate reporting of adverse events or field safety notices to the biomedical department, and a root-cause analysis for any failure that occurs during patient use.

3. The ICU director wants to use the savings to buy new monitors. How would you frame the trade-off and what residual risks would you accept?

Read the worked answer

Frame the trade-off as capacity versus resilience. The saving is about PKR 13.5 million per year, which could buy monitors, but monitors do not ventilate patients. If the cheaper contract increases ventilator downtime, the ICU loses beds and may cancel surgery. The relevant comparison is cost per available ventilator-day, not contract price alone.

A defensible position is to release part of the saving only after the service provider passes a three-month probation with the agreed KPIs and test results. Hold back a contingency of 15–20% of the contract value for loaner ventilators, analyser calibration, and OEM support for complex faults. If the provider cannot supply a test bench or traceable sensors, do not accept the contract for critical-care ventilators.

Residual risks can be accepted for older ventilators used for stable patients, provided a loaner fleet is available and the hospital performs independent acceptance testing. Do not accept residual risk for neonatal or high-acuity ventilation without OEM support. The decision should be reviewed after six months using uptime, failure rate, and adverse-event data, and the contract should allow termination for safety-related non-performance.