32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Cutoff grade
The minimum grade at which mined material is economic to process; material below the cutoff is treated as waste or stockpiled for possible future use.
Stripping ratio
The ratio of waste material to ore material mined; a high stripping ratio increases cost per tonne of ore produced and affects economic viability.
Mineral resource
A concentration of material of economic interest in or on the Earth's crust, classified by confidence in geological knowledge and sampling data.
Mineral reserve
The economically mineable part of a measured or indicated resource, including dilution and losses, based on a modifying factor study and a mine plan.
Qualified person
A professional with relevant experience and membership in a recognised professional body who takes responsibility for public reporting of exploration results and reserves.
Powder factor
The mass of explosive used per unit volume of rock blasted, expressed in kilograms per cubic metre; it controls fragmentation and blast efficiency.
Burden and spacing
The distance from a blasthole to the free face (burden) and the distance between adjacent blastholes (spacing); both govern fragmentation and flyrock risk.
Methane explosive range
Methane mixed with air is explosive at roughly 5% to 15% by volume; ventilation and gas monitoring keep concentrations well below the lower explosive limit.
Roof bolting
A ground support method where bolts are installed into the roof or hanging wall to bind rock strata together and prevent falls of ground.
Bench height
The vertical height of a single mining bench in an open pit; it is limited by equipment reach, blasthole depth, and slope stability considerations.
Haulage cycle time
The total time for a haul truck to complete one trip, including loading, hauling, dumping, returning, and queueing or spotting at the shovel.
Truck-shovel match
The number of trucks assigned per shovel, calculated from the ratio of shovel cycle time to truck cycle time to avoid queueing or shovel idle time.
Mining dilution
The proportion of waste material mined together with ore, which lowers the grade delivered to the processing plant and increases cost per unit of metal.
Grade control
The process of defining ore and waste boundaries through drilling, sampling, and assay so that material is sent to the correct destination.
Silicosis
A lung disease caused by inhaling respirable crystalline silica dust; prevention relies on wet suppression, ventilation, and respiratory protection.
Hierarchy of controls
A risk management framework ranking controls from elimination and substitution through engineering controls to administrative controls and personal protective equipment.
Net present value
The sum of discounted future cash flows using a chosen discount rate; a positive NPV indicates a project adds value at that rate.
Rehabilitation bond
A financial assurance provided by a mining company to cover the cost of mine closure and rehabilitation if the company fails to complete the work.
Environmental impact assessment
A formal process that identifies, predicts, and evaluates the environmental and social effects of a proposed mining project before approval is granted.
Progressive rehabilitation
The staged rehabilitation of disturbed land during mine life rather than only at closure, reducing final liability and improving environmental outcomes.
Open pit slope angle
The overall angle of the pit wall; steeper slopes reduce stripping but increase risk of slope failure depending on rock mass and groundwater conditions.
Sublevel stoping
An underground mining method where ore is blasted in stopes between sublevels and drawn from below, suitable for steep, competent orebodies.
Room and pillar
A mining method leaving pillars of ore to support the roof while extracting rooms; pillar design controls stability and recovery.
Ventilation air quantity
The volume of air flowing through a mine airway per unit time, calculated as cross-sectional area multiplied by air velocity.
Flyrock
Rock thrown beyond the blast area by explosive energy; controlled by adequate burden, stemming, and blast design to protect people and equipment.
Stemming
Inert material placed in the top of a blasthole above the explosive charge to confine gases and reduce flyrock, airblast, and fumes.
Head grade
The grade of ore delivered to the processing plant; it is reduced by dilution and determines recovery and metal production economics.
Recovery
The fraction of metal or mineral in the ore that is successfully extracted and recovered in the concentrate or final product.
Payable factor
The proportion of contained metal in concentrate that the smelter or refiner pays for, after deductions for treatment and refining charges.
Feasibility study
A detailed engineering and economic assessment that confirms the technical and financial viability of a mining project before a construction decision.
Mine plan
A schedule of mining sequence, equipment, and production volumes that guides ore and waste extraction over the life of the mine.
Diesel particulate matter
Fine particles emitted by diesel engines in underground mines; exposure is controlled by ventilation, engine maintenance, and low-emission fuels.