PEC EPE Part-I flashcards
PEC EPE Part-I · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Paramountcy of public welfare
- The principle that public safety, health and welfare take precedence over obligations to clients, employers or personal gain when the two conflict in professional decisions.
- Conflict of interest disclosure
- A written declaration of any financial or personal interest that could bias professional judgement, made to the client or employer before the affected work proceeds.
- Standard of care
- The degree of care and skill a reasonably competent professional would exercise in the same circumstances at the time the service was performed.
- Four elements of negligence
- A successful negligence claim requires a duty of care, a breach of that duty, causation of loss, and actual damage; all four must be proven.
- Competence limitation duty
- A professional must decline or refer work outside their demonstrated competence rather than accept it, unless supervised or trained to reach the required standard.
- Whistleblowing escalation
- Reporting serious harm through internal channels first, then to the regulator or authority, when the risk is grave, imminent and internal remedies have failed.
- Sealing and signing responsibility
- Applying a signature or professional seal certifies personal review and responsibility for the document's content, which cannot be transferred to an employer.
- Confidentiality exceptions
- Client information may be disclosed when required by law, court order or statute, or when necessary to prevent serious harm to life, health or environment.
- Factor of safety
- The ratio of material strength or resisting capacity to the applied working stress or load; the allowable stress equals strength divided by this factor.
- Beam bending stress
- The flexural stress at a section is σ = Mc/I, where M is bending moment, c is distance from the neutral axis, and I is second moment of area.
- Bernoulli equation
- For steady, incompressible, frictionless flow along a streamline, p/γ + V²/2g + z remains constant, expressing conservation of energy per unit weight.
- Darcy-Weisbach head loss
- Pipe friction head loss h_f = f(L/D)(V²/2g), where f is the friction factor, L pipe length, D diameter and V mean velocity.
- Three-phase power
- Real power in a balanced three-phase circuit equals √3 times line voltage times line current times power factor; apparent power omits the power factor term.
- Carnot efficiency
- The maximum thermal efficiency of any heat engine between two reservoirs is 1 − T_cold/T_hot, with both temperatures expressed in kelvin.
- Galvanic corrosion
- Corrosion of the more active (anodic) metal when two dissimilar metals are joined in an electrolyte; small anode area relative to cathode accelerates attack.
- Closed-loop transfer function
- For forward path G and feedback path H, the closed-loop response is G/(1 + GH); the roots of 1 + GH = 0 determine stability.
- Section modulus
- The ratio S = I/c of second moment of area to extreme fibre distance, used to compute maximum bending stress directly as σ = M/S.
- Liquefaction susceptibility
- Loose, saturated, uniformly graded sands are most prone to losing shear strength during earthquake shaking, causing settlement and lateral spreading.
- Incorporation by reference
- A standard becomes legally enforceable when a statute, regulation, contract or permit cites it, even though the standard itself was written as voluntary consensus.
- Governing code edition
- The edition of a standard cited in the permit, regulation or contract at the time of design governs, not necessarily the most recently published edition.
- Shall versus should
- In standards, 'shall' states a mandatory requirement, 'should' a recommendation, and 'may' a permission; specifications must preserve this distinction.
- Authority having jurisdiction
- The organisation or official responsible for approving equipment, installations or procedures and for enforcing the applicable code requirements.
- Load and resistance factors
- Paired multipliers applied to loads and to resistances in limit-state design; they are calibrated together and must not be mixed between code families.
- Hold and witness points
- Agreed stages in an inspection and test plan where work must pause for authority review, or where the authority must be notified before work continues.
- Non-contractual statutory duties
- Health, safety and environmental obligations imposed by law remain with the duty holder regardless of how a contract allocates risk or indemnities.
- Inspection and test plan
- A controlled document listing inspection activities, acceptance criteria, responsible parties, and hold or witness points for a construction or manufacturing scope.
- Executive summary content
- A one-page standalone statement of the problem, method, key quantitative findings and recommendation, readable without reference to the main report body.
- Measurement uncertainty statement
- A report must state the uncertainty of measured values and its confidence level, and must distinguish measured, calculated and assumed data clearly.
- Reproducible calculation record
- A calculation shows inputs, governing equation, substitution and result with units, plus software name, version and validation status where software was used.
- Citation and attribution
- Every borrowed figure, table, equation, standard clause or data set must be referenced, and verbatim text must be quoted and attributed to avoid plagiarism.
- Document control fields
- Issued documents carry version number, author, checker, approver, date and revision history, and superseded issues are formally withdrawn from use.
- Traceable recommendations
- Each recommendation must be supported by evidence in the report and must state limitations, residual risk and any required follow-up action.