PL-600 study materials
PL-600 study resources

PL-600 study plan

PL-600 · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Perform solution envisioning and requirement analysis

  • Map the envisioning workshop stages to the artifacts each one must produce in a Power Platform engagement

  • Extract business goals, pain points, success metrics, and constraints from a stakeholder interview you write yourself

  • Compare three candidate approaches (out-of-the-box, configure, custom build) and document cost, benefit, and risk for each

  • Draft the executive summary and scope statement of a solution blueprint

Your checkpoint

A 3-5 page envisioning document for a self-invented scenario containing stakeholders, goals, risks, and a first-pass options comparison table

Week 2

Perform solution envisioning and requirement analysis

  • Classify requirements into functional, non-functional, data, and reporting categories and write testable acceptance criteria for each

  • Perform a fit-gap analysis against standard Power Platform capabilities and record a resolution for every gap

  • Specify data requirements including entity scope, volume, retention, and data sensitivity classification

  • Prioritize the requirement set with MoSCoW and assign items to delivery phases

Your checkpoint

A fit-gap matrix covering at least 15 requirements, each with category, priority, gap status, and proposed resolution

Week 3

Perform solution envisioning and requirement analysis & Architect a solution

  • Design the data model: tables, relationships, keys, business rules, and migration source mapping

  • Select the app type for each requirement (model-driven, canvas, Power Pages) and justify the choice in writing

  • Draft the security model using business units, security roles, column security profiles, and manager hierarchy

  • Translate the design into licensing and capacity implications

Your checkpoint

Two blueprint sections - a written data model specification with relationship list, and an app selection rationale table with one justification line per requirement

Week 4

Architect a solution

  • Choose an integration pattern for each gap (native connector, custom connector, Azure service, virtual table, Dataverse event) and state the tradeoffs

  • Define the environment strategy: number of environments, purpose of each, and promotion path

  • Identify single points of failure and performance risks in the proposed architecture

  • Assemble the full solution blueprint from the pieces produced in weeks 1-3

Your checkpoint

A consolidated solution blueprint document reviewed against a self-written 20-point completeness checklist scoring 18 or higher

Week 5

Architect a solution

  • Design the ALM approach: publisher and solution segmentation, source control, and pipeline stages

  • Define data loss prevention policies and compliance controls covering connectors, data residency, auditing, and access

  • Evaluate the design against reliability, security, operational excellence, performance, and experience considerations, documenting at least two tradeoffs

  • Specify the backup, disaster recovery, and support model

Your checkpoint

An ALM and governance plan document that names every environment, the solution segmentation scheme, and the pipeline stage gates

Week 6

Architect a solution & Implement the solution

  • Build a work breakdown structure that sequences configuration, integration, data migration, testing, and cutover

  • Create a Dataverse solution containing tables, a model-driven app, and at least one automation, then export it as managed

  • Configure a deployment pipeline and promote the solution from development to a second environment

  • Record and resolve the errors encountered during import

Your checkpoint

A working solution exported as managed and successfully imported into a test environment, plus a deployment log listing each error and its fix

Week 7

Implement the solution

  • Write a test plan covering unit, system integration, user acceptance, and performance testing with entry and exit criteria

  • Validate the security model using at least two test users with different role assignments

  • Run a go-live readiness review covering data migration, training, support handover, and rollback

  • Deploy a corrective change through the pipeline and confirm it reaches the test environment

Your checkpoint

A test results summary with pass/fail per test case and a signed-off go-live checklist

Week 8

Perform solution envisioning and requirement analysis & Architect a solution & Implement the solution

  • Complete two timed full-length practice assessments under exam conditions

  • Tag every missed item by domain and root cause (knowledge gap, misread, or guess)

  • Re-study the two weakest sub-areas until you can explain them without notes

  • Condense architecture decision patterns into a one-page reference sheet you can recite

Your checkpoint

A timed assessment score of 80 percent or higher plus a written remediation list with zero unresolved items

Milestones

Week 2: Produce a complete fit-gap matrix from a fresh scenario in under 45 minutes without notes

Week 4: Solution blueprint scores 18 or higher on the 20-point completeness checklist and covers all five architecture considerations

Week 6: Managed solution deployed end-to-end through a pipeline to a second environment with zero blocking errors

Week 8: Two timed practice assessments completed with an average score of 80 percent or higher