SCE PE Water Resources & Environmental flashcards
SCE PE Water Resources & Environmental · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Rational method
- Peak discharge equals runoff coefficient times rainfall intensity times drainage area; Q = CiA/360 for cubic feet per second, inches per hour, and acres.
- Time of concentration
- Minimum time for rainfall at the farthest point to contribute to outlet flow; used to select rainfall intensity for rational method design.
- Return period
- Average interval between events exceeding a given magnitude; reciprocal of annual exceedance probability, so T = 1/p.
- SCS curve number
- Empirical index for direct runoff; runoff Q = (P - 0.2S)^2/(P + 0.8S) when P exceeds 0.2S, with S from curve number.
- Unit hydrograph
- Direct runoff hydrograph from one unit depth of excess rainfall uniformly distributed over a watershed in a specified duration.
- Horton infiltration
- Infiltration rate decays exponentially from initial to final capacity: f(t) = fc + (f0 - fc)e^(-kt), where k controls decay rate.
- IDF curve
- Graph or equation giving rainfall intensity for a specified duration and return period; intensity decreases with duration and increases with return period.
- Darcy-Weisbach equation
- Head loss in pipe flow: hf = f(L/D)(V^2/2g), where f is friction factor, L length, D diameter, V velocity, g gravity.
- Reynolds number pipe
- Re = VD/ν; flow is laminar below about 2000, transitional between 2000 and 4000, and turbulent above 4000.
- Hazen-Williams formula
- Empirical pipe head loss: hf = 10.67 L Q^1.852/(C^1.852 D^4.87) in SI units, with C depending on pipe roughness.
- Minor loss
- Local head loss from fittings, valves, bends, or transitions: hL = K(V^2/2g), where K is the loss coefficient.
- Pump power
- Power required: P = ρgQH/η, where ρ is density, Q flow, H pump head, and η overall efficiency.
- Water hammer
- Pressure surge caused by rapid velocity change; magnitude approximated by Δp = ρaΔV, where a is pressure wave celerity.
- Manning equation
- Open-channel velocity: V = (1/n)R^(2/3)S^(1/2) in SI units, where n is roughness, R hydraulic radius, S slope.
- Hydraulic radius
- Flow area divided by wetted perimeter, R = A/P; used in Manning and Chezy equations for open-channel flow.
- Froude number
- Fr = V/sqrt(gD), with D hydraulic depth A/T; subcritical when Fr < 1, critical at 1, supercritical when > 1.
- Critical depth
- Depth at minimum specific energy for a given discharge; occurs when Froude number equals one in open-channel flow.
- Hydraulic jump
- Rapid transition from supercritical to subcritical flow; dissipates energy and raises water surface, with sequent depths related by momentum.
- Best hydraulic section
- Most efficient open-channel cross section for a given area and roughness; trapezoidal best section has side slope 60 degrees and R = y/2.
- BOD5
- Five-day biochemical oxygen demand at 20°C; approximately 68 percent of ultimate BOD when k = 0.23 per day.
- F/M ratio
- Food-to-microorganism ratio: F/M = Q S0/(V X), where Q influent flow, S0 influent substrate, V aeration volume, X biomass.
- Solids retention time
- SRT = VX/(QwXr + QeXe); average time biomass remains in activated sludge system, controlling treatment performance.
- Overflow rate
- Surface settling rate in clarifier: Q/A; particles with settling velocity greater than overflow rate are removed.
- Stokes law
- Settling velocity of small spherical particle: vs = g(ρp - ρw)d^2/(18μ) for laminar settling in water.
- CT disinfection
- CT = C × T, product of disinfectant residual concentration and contact time; used with tables to verify pathogen inactivation.
- Nitrification
- Biological oxidation of ammonia to nitrite then nitrate by autotrophic bacteria; consumes oxygen and alkalinity in wastewater treatment.
- Benefit-cost ratio
- Ratio of present worth of benefits to present worth of costs; project acceptable when ratio exceeds one.
- Present worth factor
- P/F = 1/(1+i)^n; converts a future single payment to present value at interest rate i over n periods.
- Design life risk
- Probability of at least one exceedance in n years: R = 1 - (1 - 1/T)^n for return period T.
- Detention storage
- Required stormwater storage approximated by inflow hydrograph volume minus allowable outflow volume; often estimated with modified rational method.
- Sensitivity analysis
- Tests how changes in input parameters affect model outputs; identifies which uncertainties most influence design decisions.
- Life-cycle cost
- Total present worth of capital, operation, maintenance, replacement, and salvage costs over project life; used to compare alternatives.