SCA Barista study materials
SCA Barista study resources

SCA Barista study plan

SCA Barista · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Brewing and Barista Techniques

  • Dial in espresso grind, dose, and yield across three coffee types while recording extraction times

  • Calibrate a grinder and document the burr-adjustment procedure step by step

  • Demonstrate and label milk-texturing stages for microfoam at two viscosity targets

  • Explain brew-ratio math and calculate recipes for filter and espresso methods

Your checkpoint

A brewing log of 15 espresso shots with dose, yield, time, and taste notes plus a one-page grinder calibration sheet

Week 2

Brewing and Barista Techniques & Coffee Quality Evaluation and Cupping

  • Execute pour-over and immersion brews to a target recipe and record deviations

  • Set up and run a structured cupping session using SCA protocol steps

  • Score three samples on fragrance, flavor, acidity, body, and aftertaste using the cupping form

  • Identify and describe at least six common flavor attributes in blind samples

Your checkpoint

A completed cupping form for three coffees with attribute scores and written justifications

Week 3

Coffee Quality Evaluation and Cupping

  • Define and apply SCA cupping standards for water temperature, ratio, and grind

  • Detect and describe defective flavors such as phenolic, fermented, and underdeveloped notes

  • Compare washed versus natural process samples and articulate the sensory differences

  • Perform a triangulation discrimination test and record accuracy

Your checkpoint

A flavor-defect reference sheet with descriptors plus results of three triangulation tests

Week 4

Coffee Quality Evaluation and Cupping & Brewing and Barista Techniques

  • Evaluate coffee quality across green, roasted, and brewed stages using defined criteria

  • Identify roast defects from appearance and cup profile

  • Adjust a brew recipe in response to a scored sensory deficiency

  • Explain how extraction variables map to sour, bitter, and balanced cup outcomes

Your checkpoint

A quality evaluation report linking one brew adjustment to a measured sensory improvement

Week 5

Equipment Maintenance

  • Disassemble, clean, and reassemble an espresso machine group head and portafilter

  • Describe a daily, weekly, and monthly cleaning schedule for grinder and espresso equipment

  • Diagnose common faults such as channeling, scale buildup, and inconsistent grind

  • Test and interpret water hardness, alkalinity, and TDS against equipment tolerances

Your checkpoint

A maintenance checklist covering daily, weekly, and monthly tasks plus a water test report

Week 6

Equipment Maintenance & Sustainability

  • Perform grinder burr inspection and document wear assessment criteria

  • Explain descaling procedure and safety steps for espresso and brew equipment

  • Describe waste-reduction practices for milk, grounds, and single-use items

  • Summarize water and energy conservation measures in a cafe workflow

Your checkpoint

A written equipment maintenance and sustainability action plan for a mock cafe

Week 7

Sustainability

  • Trace coffee supply chain stages from farm to cup and identify sustainability leverage points

  • Explain certification and sourcing schemes and their stated criteria

  • Describe responsible disposal and composting of coffee byproducts

  • Outline social and economic sustainability considerations for producers and staff

Your checkpoint

A one-page supply-chain map with sustainability interventions annotated at each stage

Week 8

Brewing and Barista Techniques & Sustainability & Equipment Maintenance & Coffee Quality Evaluation and Cupping

  • Complete a timed mock exam across all four domains and review every missed item

  • Re-run a full cupping and espresso dial-in under timed conditions

  • Recite the cleaning and calibration procedures from memory

  • Consolidate weak areas into a final review list and close each gap

Your checkpoint

A scored mock exam with a written remediation list and evidence each gap was closed

Milestones

Week 2: Brewing log and cupping form complete with defensible sensory justifications

Week 4: Quality evaluation report shows a documented brew-adjustment decision

Week 6: Maintenance checklist and sustainability plan reviewed against equipment and sourcing criteria

Week 8: Mock exam score meets target and all remediation items are signed off