Quick reference

Preliminary Phase and Architecture Governance

  • The Preliminary Phase has exactly two objectives: determine the Architecture Capability that the organization requires, and establish that capability.

  • Typical outputs are the Organizational Model for Enterprise Architecture, tailored ADM and architecture principles, the Architecture Governance framework, the Architecture Repository, the Architecture Capability Framework, and a Request for Architecture Work.

  • Architecture Governance operates at corporate, IT, architecture, and technology portfolio levels, and is a quality-of-service concept: disciplined, transparent, and accountable control of architecture creation, maintenance, and monitoring.

  • The Architecture Board is the principal governing body: it approves architecture, resolves inter-project conflicts, monitors compliance, and sponsors the architecture program; it is usually chaired by the CIO or Chief Architect.

  • Architecture principles are recorded with a Name, Statement, Rationale, and Implications, are few and stable, and must be formally approved by the executive before use.

  • The Architecture Maturity Model uses six levels: 0 None, 1 Initial, 2 Under Development, 3 Defined, 4 Managed, 5 Optimized.

  • The Architecture Skills Framework defines architecture roles, the skills each role needs, and the proficiency levels required, and is used to plan capability development.

  • Business principles, business goals, and business drivers are inputs to the Preliminary Phase; they are elicited from the enterprise, not created by the architecture function.

  • ADM tailoring decisions in the Preliminary Phase cover the level of iteration (whole enterprise, segment, capability, or project), scope, and formality.

Quick reference

Phase A: Architecture Vision

  • Phase A objectives: develop a high-level aspirational vision of the capabilities and business value to be delivered, and obtain approval of the Statement of Architecture Work.

  • Standard steps include establishing the architecture project, identifying stakeholders and concerns, confirming business goals and drivers, evaluating capabilities, assessing transformation readiness, defining scope, and defining the vision.

  • Key outputs are the Architecture Vision, the approved Statement of Architecture Work, the Capability Assessment, the Communications Plan, and a draft Architecture Definition Document with a Solution Concept Diagram.

  • The Architecture Vision must be approved by the sponsor and/or Architecture Board before Phase B proceeds; the Statement of Architecture Work is the contract authorizing the engagement.

  • Phase A views typically include a business scenario or value chain view and a solution concept diagram, chosen from the stakeholder map to address high-priority concerns.

  • Stakeholders are catalogued and classified using a power/interest grid, which determines the level of engagement and the views produced.

  • Phase A is re-entered at the start of every ADM cycle, and may also be re-entered when Phase H identifies a re-architecting change.

  • The Business Transformation Readiness Assessment is first performed in Phase A and reused in Phase E to shape the implementation strategy.

Quick reference

Phase B: Business Architecture

  • Phase B develops a Baseline Business Architecture and a Target Business Architecture, and performs gap analysis between them, describing the business strategy, capabilities, processes, functions, roles, and organizational structure.

  • Common techniques are the Business Model Canvas, Business Capability Map, Value Stream Map, Organization Map, and BPMN process modeling.

  • Outputs populate the Architecture Definition Document and the Architecture Requirements Specification, including business catalogs, matrices, and diagrams.

  • Gap analysis classifies elements as added, removed, changed, or retained between baseline and target; retained elements must be explicitly recorded.

  • Business architecture elements must trace back to the business goals, drivers, and vision established in Phase A.

  • Business services are the building blocks of the Business Architecture and are later mapped to information systems and technology building blocks.

  • Phase B may be executed at whole-enterprise, segment, or capability level, and may iterate with Phase A if the vision cannot be supported.

  • Non-functional and behavioral business requirements identified here enter the Architecture Requirements Specification for central management.

Quick reference

Phase C: Information Systems Architectures

  • Phase C comprises two sub-phases: Data Architecture and Application Architecture; they may be carried out in either order, though data-first is the more common practice.

  • Data Architecture deliverables include the Data Entity/Data Component Catalog, Data Entity/Data Component Diagram, Data Dissemination Diagram, Data Security Diagram, Data Migration Diagram, and Data Lifecycle Diagram.

  • Application Architecture deliverables include the Application Portfolio Catalog, Application/Function Matrix, Application Communication Diagram, Application and User Location Diagram, and Application Use-Case Diagram.

  • The Integrated Information Infrastructure Reference Model (III-RM) is the TOGAF reference model for boundaryless information flow and is reused here where relevant.

  • Both sub-phases produce baseline and target descriptions plus a gap analysis, and both feed the Architecture Requirements Specification.

  • Information systems services are defined as building blocks so that Phase D can map them to technology components.

  • Reference models, standards, and existing assets held in the Architecture Repository must be checked before new data or application models are created.

  • Access to data and application services should be modeled through the principle of service encapsulation, ensuring services are reusable and location independent.

Quick reference

Phase D: Technology Architecture

  • Phase D describes the baseline and target Technology Architecture: hardware, software infrastructure, networks, communications, processing, and technology standards.

  • Deliverables include the Technology Standards Catalog, Technology Portfolio Catalog, Environments and Locations Diagram, Platform Decomposition Diagram, Processing Diagram, and Networked Computing/Hardware Diagram.

  • The TOGAF Technical Reference Model provides the taxonomy and nomenclature of technology services, and the Standards Information Base records the standards that apply.

  • Design considers security, manageability, performance, availability, scalability, and cost, and must satisfy the information systems and business requirements already specified.

  • Technology building blocks are defined as candidate Solution Building Blocks derived from the Architecture Building Blocks identified in earlier phases.

  • A gap analysis between baseline and target technology identifies replaced, retired, and newly introduced technology components.

  • Phase D commonly iterates with Phase C because application placement decisions constrain, and are constrained by, infrastructure capabilities.

  • Emerging technologies recognized in Phase D that are not required by the current target feed the change management process in Phase H.

Quick reference

Phase E: Opportunities and Solutions

  • Phase E consolidates the gaps, solutions, and dependencies from Phases B to D into work packages and identifies transition architectures that deliver value before the target state is complete.

  • Three implementation and migration strategy options are evaluated: Greenfield (build anew), Revolutionary (replace in a single step), and Evolutionary (incremental delivery).

  • The phase determines which Architecture Building Blocks are reused, replaced, outgrown, or retired, and defines candidate Solution Building Blocks for each work package.

  • Capability-Based Planning is used to define increments that each deliver a coherent set of business capabilities and measurable business outcomes.

  • Outputs include the initial Architecture Roadmap, Transition Architectures, Work Packages, the Implementation and Migration Strategy, and the Consolidated Gaps, Solutions, and Dependencies Matrix.

  • Work packages are grouped by considering dependencies, business value, technical risk, and the capability increments they deliver.

  • The Business Transformation Readiness Assessment from Phase A is applied here to judge whether each candidate increment is achievable.

  • Phase E does not produce detailed schedules or costs; those are produced in Phase F during migration planning.

Quick reference

Phase F: Migration Planning

  • Phase F finalizes the Architecture Roadmap and the Implementation and Migration Plan, and completes the Transition Architectures defined in Phase E.

  • The Implementation Factor Assessment and Deduction Matrix lists factors affecting implementation, their impact, and the deductions that determine how work packages are organized.

  • Projects and work packages are prioritized with criteria such as business value, technical risk, cost, resource availability, and dependency; business value against technical risk is the classic plotting.

  • Outputs include the Implementation and Migration Plan, finalized Transition Architectures, the Benefits and Cost/Business Case information, and the Consolidated Gaps, Solutions, and Dependencies Matrix.

  • Each work package in the plan is described with its deliverables, milestones, resources, dependencies, and the transition architecture it realizes.

  • Costs, benefits, and return on investment are estimated and validated with the sponsor to confirm the business case before implementation begins.

  • Phase F aligns the migration plan with the organization's portfolio and project management methods so that projects can be initiated and resourced.

  • Phase G begins as soon as the first implementation project is launched from the plan; Phases F and G therefore run concurrently.

Quick reference

Phase G: Implementation Governance

  • Phase G objectives: ensure conformance of implementation projects with the target architecture, and ensure that deployed solutions deliver the expected business value.

  • The Architecture Contract is agreed between the architecture function and the implementation organization, stating purpose, scope, conformance requirements, acceptance criteria, deliverables, and milestones.

  • Architecture Compliance Reviews compare project work products with the specification using checklists and a scoring model, and record dispositions with conditions for acceptance.

  • Typical dispositions are conformant, conformant with conditions, and non-conformant; non-conformance may be escalated to the Architecture Board for a decision to proceed or halt.

  • Change requests raised by implementers are routed back to the architecture function for impact assessment, and significant ones return to Phase H.

  • Phase G performs implementation governance through the Architecture Board, architecture contracts, compliance reviews, and deployment oversight.

  • Implementation governance must also verify that the deployed solution supports the business goals recorded in the Architecture Vision.

  • Lessons learned and implementation issues recorded in Phase G feed the next ADM cycle through the architecture change management process.

Quick reference

Phase H: Architecture Change Management

  • Phase H establishes and operates the processes for managing architecture change, monitors business and technology trends, and maintains the architecture capability and value realization.

  • Changes are classified into three categories: Simplification Change, Incremental Change, and Re-Architecting Change.

  • Simplification Change reduces complexity without altering architecture scope and is handled by change management without re-entering the ADM.

  • Incremental Change extends capabilities inside existing architectural boundaries and usually re-enters the ADM at a later phase such as Phase B, C, or D.

  • Re-Architecting Change fundamentally alters scope or approach and re-enters the ADM at Phase A, restarting the cycle.

  • Change drivers include business changes, technology changes, simplification opportunities, and changes in the architecture capability itself.

  • The Architecture Board governs change via change requests, compliance reviews, and the decision on whether and where to re-enter the ADM.

  • Phase H also maintains the Architecture Repository and closes the loop by feeding confirmed changes into the next iteration of the ADM.

Quick reference

Architecture Requirements Management and ADM Techniques

  • Requirements Management is the central, continuous phase of the ADM: it stores, prioritizes, and disseminates requirements to every phase through the Requirements Repository.

  • The Architecture Requirements Specification holds the requirements the architecture must satisfy, with measurable acceptance criteria, and is the basis for compliance checking in Phase G.

  • A Requirements Impact Assessment determines the effect of a requirements change on the architecture and identifies which ADM phase must be re-entered.

  • The Business Scenario technique specifies a problem, the business and technology environment, the actors and roles, the desired outcome, and the measures of success used to validate it.

  • The Business Transformation Readiness Assessment scores readiness factors on maturity, readiness, and difficulty, and records the risk of not addressing each factor.

  • Gap analysis compares baseline and target element by element and classifies elements as added, removed, changed, or retained.

  • ADM iteration is applied at four levels: strategic (whole enterprise), segment, capability, and project-level architecture.

  • Risk management is performed in every phase: risks are identified, classified, mitigated, and residual risk is recorded for acceptance by the sponsor.

  • Interoperability requirements are captured and assessed per phase, because they constrain how building blocks from different architectures can be assembled.