You inspect a 1930s semi-detached house with a persistent damp patch on the front room wall, black mould around the window reveal and a musty smell. The owner had a chemical damp-proof course injected three years ago under a 20-year guarantee. The patch is worse in winter. The external wall is solid brick with cement render painted with masonry paint; the outside ground level is about 150 mm above the internal floor and two courses above the visible slate DPC. A gully beside the wall is blocked. Internal relative humidity is 78% at 18°C. The owner wants you to confirm rising damp so the guarantee can be enforced and the wall re-injected.

1. Form a differential diagnosis of the damp and explain what evidence would distinguish the likely causes.

Read the worked answer

The evidence does not justify confirming rising damp. A 78% relative humidity at 18°C, black mould around a cold window reveal and a musty smell point strongly towards condensation, but the high external ground level, blocked gully and painted cement render also create a credible penetrating-damp pathway. Rising damp is possible but should not be assumed merely because a damp patch is low on a wall; chemical injection does not prove that rising damp was correctly diagnosed, and the guarantee is a contractual document, not diagnostic evidence.

I would distinguish the causes by: checking the external ground level and DPC continuity; clearing and testing the gully and rainwater goods; taking moisture profiles at several heights and depths with a calibrated meter and carbide testing; checking for hygroscopic salts, which can indicate rising damp or contamination; using thermal imaging and internal/external moisture readings; inspecting sub-floor ventilation and floor structure; and checking whether the patch correlates with weather-driven rain or with occupation and drying. A salt analysis and a monitored drying test would be more informative than another injection. I would also inspect the guarantee's scope and exclusions before advising the owner to rely on it.

2. Specify a proportionate repair and monitoring plan, and explain why re-injection is not your first recommendation.

Read the worked answer

The first actions should address the obvious water pathways: lower the external ground level to at least two courses below the DPC where practicable, clear and repair the blocked gully, check rainwater goods and render defects, and improve sub-floor ventilation. Internally, I would remove non-breathable coverings from the affected wall, allow the wall to dry, and treat the mould with appropriate personal protection; the cause of the moisture must be corrected before decorative repair.

Re-injection is not my first recommendation because the building already has a chemical DPC and the visible risk factors point to penetrating damp and condensation. Re-injection would not fix a bridged DPC, a blocked gully or high internal humidity, and it could waste the owner's money while masking the real problem. I would monitor moisture content and internal humidity over several months after the drainage and ventilation improvements. If rising damp is still demonstrated by a credible moisture profile and salt evidence after those works, a remedial DPC could then be considered, but the specification should be based on the confirmed cause. The report should explain the reasoning and not simply repeat the previous contractor's diagnosis.

3. How would you report on the existing guarantee and manage the owner's expectation that it will pay for re-injection?

Read the worked answer

I would report that the guarantee is a document to be read in full: it may be insurance-backed or merely a contractor's warranty, may require notification and inspection before works, may exclude condensation and penetrating damp, and may be void if the original installation was not in accordance with the specification. I would not advise the owner that the guarantee will pay for re-injection until the cause is established and the guarantee's terms are checked.

I would explain the distinction between a defect in the original installation and a new or different moisture source. If the evidence supports rising damp despite the injection, the guarantee may be relevant; if the evidence supports condensation or penetrating damp, the guarantee is unlikely to respond. I would recommend a written request to the guarantee provider, keeping photographs and readings, and obtaining their view before authorising further work. I would avoid becoming an advocate for either the owner or the contractor; my role is to report the evidence, the likely causes and the proportionate next steps.