Inspection and survey practice

  • RICS Home Survey Level 1 is a condition report with no repair advice; Level 2 adds condition ratings and repair advice, with a market valuation only if requested; Level 3 is a comprehensive building survey for older, altered or non-standard properties.

  • RICS condition ratings use three points: 1 means no repair currently needed; 2 means defects needing repair or replacement but not serious; 3 means serious defects or urgent action.

  • Inspection sequence: external elevations and roof, roof space, internal rooms, services, outbuildings and boundaries; record date, weather and access at each stage.

  • Measurement conventions: GIA is to internal faces of external walls; GEA is to external faces; NIA is for commercial space. RICS Property Measurement 2nd edition includes IPMS for offices and residential, but UK residential practice still often reports GIA.

  • Moisture meter readings are relative and material-dependent; confirm with a second method such as carbide testing before concluding that damp exists.

  • Thermal imaging shows surface temperature, not moisture; use it to identify insulation gaps, thermal bridging and air leakage, then confirm findings with a moisture meter or borescope.

  • Crack monitoring using tell-tales or crack gauges should run for at least 6-12 months across seasonal cycles before cause is attributed.

  • Record limitations expressly: concealed sub-floor areas, voids, furniture-blocked walls, inaccessible roofs and untested services must be listed in the report with their effect on conclusions.

  • For intrusive work in pre-2000 buildings, presume asbestos-containing materials until a refurbishment or demolition survey proves otherwise; plan lone working and confined-space controls.

Quick reference

Building pathology, defects and repair

  • Damp diagnosis separates rising damp (low level, hygroscopic salts, failed or bridged DPC), penetrating damp (localised, weather-facing, defective fabric) and condensation (surface, cold bridges, high moisture generation).

  • Timber decay: wet rot needs moisture content above about 20%; dry rot (Serpula lacrymans) also needs above 20% but spreads through masonry via mycelium and produces a fruiting body.

  • Condensation risk depends on temperature and relative humidity; surface condensation is controlled by heating, ventilation and insulation, while interstitial risk is assessed by hygrothermal modelling.

  • Movement diagnosis distinguishes subsidence (downward ground movement), settlement (downward building movement) and heave (upward movement, often after tree removal on clay).

  • Diagonal cracking wider at one end suggests differential movement; measure and monitor crack width, and refer cracks around 5mm or more to a structural engineer.

  • Wall tie corrosion in cavity walls produces horizontal cracking and bulging; inspect with a boroscope and specify replacement where section loss is significant.

  • Roof leaks often track along felt, battens or masonry, so the visible damp patch may be remote from the entry point; inspect flashings, valleys, parapets and gutters directly.

  • Repair specifications should be like-for-like where appropriate; listed building consent is needed for alterations affecting character, and replacement elements such as windows or roofs must comply with Building Regulations.

  • Asbestos survey types are management (presume and manage in occupied buildings) and refurbishment/demolition (intrusive, before works); licensed contractors are required for high-risk removal.

Quick reference

Residential valuation

  • RICS market value: the estimated amount for which an asset should exchange on the valuation date between a willing buyer and a willing seller in an arm's length transaction, after proper marketing, with knowledge, prudence and without compulsion.

  • Five valuation methods are comparable, investment, profits, cost and residual; residential valuations normally use comparables, with investment and yield cross-checks for lettings.

  • Comparable adjustments cover date, location, size, condition, tenure, garden, parking, view and EPC; adjust the subject to the comparables rather than adjusting the comparables to the subject.

  • Gross yield = annual rent ÷ capital value × 100; net yield deducts voids, management, maintenance and insurance.

  • Leasehold valuation considers unexpired term, ground rent, marriage value on enfranchisement and lease extension rights under the Leasehold Reform, Housing and Urban Development Act 1993.

  • Special assumptions are hypothetical states of affairs, such as vacant possession or planning consent, and must be stated clearly in the report.

  • A material uncertainty clause states that value may be significantly affected by market conditions and that the valuation is subject to a high degree of uncertainty.

  • Valuation and survey are distinct: valuation is an opinion of value, a survey reports condition, and a valuation may not identify defects; EWS1, cladding and building safety can materially affect value and mortgageability.

  • Reports should state basis of value, valuation date, inspection date, scope, assumptions and any departure from RICS standards.

Quick reference

Law, regulation and statutory frameworks

  • Party Wall etc. Act 1996 notice periods: Line of Junction notice under section 1 at least one month before; Party Structure Notice under section 2 at least two months before; Adjacent Excavation notice under section 3 at least one month before.

  • Party wall dispute resolution uses an agreed surveyor or two surveyors plus a third; the award is binding and enforceable as a court order, with appeal to the county court within 14 days of service.

  • Building Regulations 2010 are supported by Approved Documents A-Q; building control approval is required for most alterations, and a completion certificate is evidence of compliance.

  • Building Safety Act 2022 defines a higher-risk building as at least 18 metres or seven storeys high with two or more residential units; dutyholders, gateway points, safety cases and the golden thread apply.

  • Town and Country Planning Act 1990 controls development and permitted development; listed building consent under the Planning (Listed Buildings and Conservation Areas) Act 1990 is needed for alterations affecting character.

  • Consumer protection includes the Consumer Protection from Unfair Trading Regulations 2008, Misrepresentation Act 1967 and Consumer Rights Act 2015 for services.

  • Landlord and Tenant Act 1985 section 11 imposes repairing obligations for structure, exterior and services; section 19 requires service charges to be reasonable.

  • Defective Premises Act 1972 imposes a duty to build dwellings properly; the Latent Damage Act 1986 provides a 15-year longstop for latent defects.

  • Anti-money laundering: Money Laundering Regulations 2017 require customer due diligence, risk assessment, record keeping and suspicious activity reports to the National Crime Agency.

Quick reference

Energy efficiency, sustainability and retrofit

  • An EPC is produced for existing dwellings using RdSAP, is valid for 10 years, and is required on sale or rent; the A-G rating is based on SAP metrics including energy efficiency, environmental impact and primary energy.

  • Fabric-first hierarchy: reduce heat demand through insulation, airtightness and glazing, then improve services efficiency, then add renewables.

  • Loft insulation is recommended to about 270mm depth; cavity wall insulation is suitable for many walls, while solid wall insulation needs moisture risk assessment before internal or external application.

  • Airtightness must be matched by designed ventilation: MEV, MVHR or PIV, with avoidable draughts controlled rather than eliminated indiscriminately.

  • Heat pumps operate at lower flow temperatures, typically 35-45°C, so emitter sizing and insulation matter; efficiency is expressed as COP or seasonal SCOP.

  • PAS 2035 governs domestic retrofit: assessment, a medium-term improvement plan, retrofit coordinator, competent installers and TrustMark registration.

  • MEES regulations make it unlawful to grant new tenancies for properties rated below EPC E, subject to exemptions; higher future standards have been proposed.

  • Retrofit moisture risk: internal wall insulation can create interstitial condensation and timber decay, so hygrothermal assessment, ventilation and careful detailing are needed.

Quick reference

Professional practice, ethics and reporting

  • RICS Rules of Conduct (2021) cover honesty and integrity, competence, good service, respect and responsibility; breaches can lead to disciplinary action.

  • Terms of engagement should state scope, limitations, fees, payment terms, complaints procedure, liability caps and insurance arrangements.

  • Conflicts of interest must be identified, disclosed and managed, or the instruction declined; acting for both buyer and seller requires informed consent and safeguards.

  • Reports should separate fact from opinion, state assumptions and limitations, use plain language, and give clear recommendations and next steps.

  • Negligence requires a duty of care, breach, causation and loss; the SAAMCo principle limits liability to losses within the scope of the duty assumed.

  • Limitation periods are generally six years for contract and tort, with a 15-year longstop for latent damage under the Latent Damage Act 1986.

  • Professional indemnity insurance must be adequate for the work undertaken, including run-off cover; check policy exclusions and aggregate limits.

  • Firms must operate a complaints handling procedure and provide access to independent redress where required; RICS may investigate breaches of the Rules.