- BREEAM New Construction final certificate
- The certificate issued after post-construction review confirms the as-built asset meets the targeted rating; interim design-stage certification alone does not produce a final certificate.
- Outstanding rating threshold
- In BREEAM New Construction, Outstanding requires at least 85% of available credits, with the maximum achievable score capped at 100% of available credits.
- Very Good rating threshold
- The Very Good rating is awarded at 55% or more of available credits, sitting between Good (45%) and Excellent (70%) in the standard percentage bands.
- Innovation credits cap
- Innovation credits are additional credits capped at 10% of the total available credits, added on top of standard section scores rather than replacing them.
- Energy Performance Ratio (EPR)
- A ratio comparing the assessed building's regulated energy performance against a notional benchmark; a higher EPR corresponds to more energy credits in New Construction.
- Minimum energy standard
- New Construction imposes a minimum energy credit requirement for a Pass, so a project can fail to certify despite adequate total credits if energy performance is too low.
- Highest-weighted New Construction section
- Energy is typically the highest-weighted environmental section, followed by Health and Wellbeing; exact weightings depend on building type and scheme version.
- BREEAM Assessor versus AP
- The licensed Assessor registers the project, compiles evidence, and submits for QA; the AP provides strategic and technical guidance but does not replace the Assessor.
- In-Use Part 1
- Part 1 (Asset Performance) assesses the inherent performance of the existing building asset, such as fabric and services characteristics, largely from documentation and asset data.
- In-Use Part 2
- Part 2 (Building Management) assesses operational management of the building, including energy and water monitoring, maintenance regimes, and owner or manager controlled practices.
- In-Use Part 3
- Part 3 (Occupier Management) assesses how the occupying organisation manages its own fit-out, energy use, and workplace practices within the building.
- In-Use separate part ratings
- Each of the three In-Use parts is scored and rated independently; the scheme does not combine the parts into a single overall building rating.
- In-Use evidence type
- Because In-Use assesses operating buildings, evidence typically includes metered consumption data, management records, and operational policies rather than design-stage submissions.
- In-Use recertification purpose
- In-Use is designed for periodic reassessment, so demonstrating improvement in operational performance between certification cycles is a core purpose of the scheme.
- In-Use rating bands
- In-Use uses the standard BREEAM percentage bands from Pass to Outstanding, but available credits and weightings differ between Part 1, Part 2, and Part 3.
- Refurbishment Part 1
- Part 1 (Fabric and Structure) covers the building envelope and structural elements within the refurbishment scope, assessed separately from services and fit-out.
- Refurbishment Part 2
- Part 2 (Core Services) covers central building services serving the whole building, such as primary plant and distribution, within the refurbishment scope.
- Refurbishment Part 3
- Part 3 (Local Services) covers services serving the assessed unit or fit-out area rather than the whole building, such as local ventilation or terminal units.
- Refurbishment Part 4
- Part 4 (Interior Design) covers finishes, internal layout, and indoor environment quality within the fit-out scope of the refurbishment project.
- Refurbishment multi-part ratings
- Refurbishment and Fit Out rates each assessed part separately, so a single project may hold different ratings for Parts 1 through 4.
- Scope-based credit applicability
- Refurbishment and Fit Out excludes elements outside the project's physical scope, so the assessor must define scope boundaries early to determine which credits apply.
- Refurbishment scheme intent
- The scheme targets projects where the existing building is retained rather than newly built, including renovation, conversion, and fit-out works.
- Fit-out on certified base build
- Where the base building already holds a BREEAM certificate, a fit-out assessment can focus on the fit-out scope rather than re-scoring the entire asset.
- BREEAM Infrastructure former name
- BREEAM Infrastructure was formerly known as CEEQUAL and assesses civil engineering, infrastructure, and public realm projects rather than individual buildings.
- Infrastructure lifecycle phases
- Infrastructure assessments are structured around project lifecycle phases including strategy, design, construction, and operation or handover, with credits available in each phase.
- Infrastructure independent verification
- Each credit requires documented evidence, and an independent verifier reviews the assessment before certification is awarded to the project.
- Infrastructure project-specific scope
- Infrastructure uses a project-specific assessment scope and scoring model that can weight sections to reflect the priorities and characteristics of that project.
- Infrastructure rating expression
- Infrastructure ratings are expressed as a percentage of credits achieved against those available, using award bands from Pass through to Outstanding.
- Communities three stages
- Communities runs through Step 1 (scope and project establishment), Step 2 (masterplan design and assessment), and Step 3 (certification) in sequence.
- Communities assessment scale
- Communities assesses masterplanning and design at neighbourhood or community scale for large developments, rather than assessing individual buildings.
- Communities stakeholder engagement
- Early-stage community engagement and stakeholder consultation are required elements under the governance and social and economic wellbeing issues in Communities.