Quick reference

Leasehold law, leases and legal framework

  • Landlord and Tenant Act 1985 s.18(1): a service charge is an amount payable by a tenant, in addition to rent, for services, repairs, maintenance, insurance or management.

  • LTA 1985 s.19(1): costs are recoverable only to the extent they are reasonably incurred and the works or services are of a reasonable standard; s.19(2) applies the same test to variable service charges.

  • LTA 1985 s.20 consultation: qualifying works exceeding £250 per contributing leaseholder, and qualifying long-term agreements exceeding £100 per leaseholder per year, require notice of intention, at least two estimates and a 30-day inspection period.

  • LTA 1985 s.20B: costs incurred more than 18 months before a written demand are irrecoverable unless the leaseholder was notified in writing, within those 18 months, that the costs had been incurred.

  • LTA 1985 s.21A: every service charge demand must be accompanied by a summary of the tenant's rights and obligations; s.22 gives a right to inspect supporting accounts and receipts.

  • Landlord and Tenant Act 1987 ss.47 and 48: service charge demands must state the landlord's name and an address in England and Wales, and sums are not due until that information is given.

  • Leasehold Reform, Housing and Urban Development Act 1993: a qualifying tenant (long lease, flat, two years' ownership) may extend the lease by 90 years at a peppercorn rent.

  • Marriage value is payable on lease extension or collective enfranchisement only where 80 years or fewer remain unexpired; above 80 years the premium is calculated without it.

  • Commonhold and Leasehold Reform Act 2002 s.167: forfeiture for service charge arrears requires the amount to be admitted or agreed, determined by a court or tribunal, or subject to judgment; the Leasehold Reform (Ground Rent) Act 2022 bans ground rent above a peppercorn on new residential leases granted on or after 30 June 2022.

Quick reference

Service charges, budgeting and accounts

  • Annual budget per unit = total planned expenditure for the service charge year multiplied by the unit's apportionment percentage fixed in the lease.

  • Budget headings typically comprise insurance, management fee, common-part repairs and maintenance contracts, utilities, cleaning, gardening, reserve fund contribution and contingency.

  • Landlord and Tenant Act 1987 s.42: service charge contributions must be held in trust and kept in a designated account separate from the landlord's own money.

  • Reserve (sinking) fund contributions are collected in advance against a lifecycle or condition survey of major components; the lease must permit collection before the works are carried out.

  • Year-end reconciliation compares budget to actual, allocates any surplus to the reserve or credits it to leaseholders, and raises a balancing charge only where the lease permits and s.19 reasonableness is satisfied.

  • LTA 1985 s.21: on written request the landlord must supply a written summary of costs for the relevant period, showing each item, the total, the tenant's share and any surplus or deficit.

  • LTA 1985 s.27A: the First-tier Tribunal (Property Chamber) determines whether a service charge is payable, by whom, and in what amount.

  • Administration charges, including fees for late payment, reminder letters and consent requests, are recoverable only if reasonable and are challengeable at the First-tier Tribunal under Schedule 11, Commonhold and Leasehold Reform Act 2002.

  • Interest on arrears and default charges are recoverable only where the lease expressly provides for them; a lease without such a clause cannot support the charge.

Quick reference

Property management practice and maintenance

  • A planned preventative maintenance schedule lists each asset, its service interval, the competent contractor, the statutory basis and the annual cost, and feeds directly into the reserve fund forecast.

  • LOLER requires passenger lifts to undergo a thorough examination at intervals not exceeding six months, with defects remedied before the lift returns to service.

  • Gas Safety (Installation and Use) Regulations 1998: gas appliances in let dwellings are checked every 12 months by a Gas Safe registered engineer, with the record given to the tenant and retained for two years.

  • Water hygiene (HSG274): hot water stored at 60°C and delivered at 50°C within one minute, cold water below 20°C, with sentinel taps, tanks and showers monitored and results logged.

  • The lease, not custom, allocates repair liability: typically the landlord maintains structure, roof and common parts while the leaseholder maintains the interior, with damage caused by the leaseholder recharged as a service charge item.

  • Contractor appointment decision rule: verify trade registration (Gas Safe, NICEIC), public liability insurance, health and safety policy and references, then issue a written scope with programme, method statements and risk assessments.

  • A communal electricity supply serving common parts is normally recharged through the service charge, so lighting, pumps and lift supplies must be metered or apportioned on a documented basis.

  • Record keeping for each building should include an asset register, O&M manuals, warranties, guarantees, service certificates, insurance valuations and a dated maintenance log.

Quick reference

Health, safety and building safety compliance

  • Building Safety Act 2022: a higher-risk building is at least 18 metres high or has at least 7 storeys (whichever is met first) and contains at least two residential units.

  • The Building Safety Regulator sits within the Health and Safety Executive and oversees design, construction and occupation of higher-risk buildings; occupation requires a Building Assessment Certificate when directed.

  • The accountable person must produce a safety case report covering fire and structural safety, operate a resident engagement strategy and maintain the golden thread of building information.

  • Fire Safety (England) Regulations 2022, for buildings containing two or more domestic premises: record the fire risk assessment, provide residents with fire safety instructions, and give the fire and rescue service building plans and access details.

  • The same Regulations require best endeavours to check flat entrance fire doors annually and common-part fire doors at least every three months, with results recorded.

  • Regulatory Reform (Fire Safety) Order 2005: the responsible person must make and keep under review a suitable and sufficient fire risk assessment; there is no fixed statutory interval, so review at least annually and on any material change.

  • Control of Asbestos Regulations 2012: those responsible for common parts of pre-2000 buildings must survey, register and manage asbestos-containing materials under a duty-to-manage plan.

  • Building Safety Act 2022 leaseholder protections: a qualifying lease (landlord's lease granted before 14 February 2022, with a leaseholder deed of certificate) is exempt from cladding remediation costs, while non-cladding remediation and interim costs are capped.

Quick reference

Leaseholder relations, communication and dispute handling

  • Complaint handling decision rule: acknowledge in writing, investigate against the lease and records, respond within published timescales, and signpost the next stage including any redress scheme or tribunal.

  • Commonhold and Leasehold Reform Act 2002 s.168: before forfeiture for breach of covenant other than non-payment of rent, the landlord must serve a notice specifying the breach and, where capable of remedy, require it to be remedied.

  • Managing and letting agents must belong to a government-approved redress scheme, which gives leaseholders access to independent adjudication of complaints about agent conduct.

  • For landlords within the Housing Ombudsman scheme, a complaint may be escalated after the internal process is exhausted, normally eight weeks after the complaint was made.

  • UK GDPR: a subject access request must be answered without undue delay and within one month, extendable by up to two months where the request is complex.

  • Equality Act 2010: managing agents and landlords must not discriminate in providing services and must make reasonable adjustments for disabled leaseholders, for example in access, communication formats and meeting arrangements.

  • Disputes about service charge payability, reasonableness or administration charges are determined by the First-tier Tribunal (Property Chamber); mediation or a without-prejudice settlement discussion can be attempted first and usually shortens resolution time.

  • Records that support dispute resolution include dated correspondence, consultation notices and responses, contractor estimates and invoices, inspection reports and minutes of residents' meetings.