VA Electrician flashcards
VA Electrician · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Continuous load definition
- A load in which the maximum current is expected to continue for 3 hours or more. Branch-circuit and feeder overcurrent devices must be sized at 125 percent of this load.
- Ohm's law and power
- Voltage equals current multiplied by resistance, E = I × R. Power in a resistive circuit equals voltage times current, P = E × I, which is also I²R.
- Dwelling receptacle spacing rule
- In dwelling units, receptacles must be placed so no point along the floor line of a wall space is more than 6 feet from a receptacle, and wall spaces 2 feet or wider need one.
- Working space in front of equipment
- For equipment rated 600 volts or less, the clear workspace must be at least 3 feet deep, 30 inches wide, and 6 feet 6 inches high, and may not be used for storage.
- Single-phase voltage drop formula
- Voltage drop equals 2 × K × I × L divided by circular mils, where K is 12.9 for copper or 21.2 for aluminum, I is amperes, and L is one-way length in feet.
- AFCI protection scope
- Arc-fault circuit-interrupter protection is required on dwelling branch circuits supplying outlets in bedrooms, living rooms, dining rooms, kitchens, closets, hallways, laundry areas, and similar rooms.
- NM cable support intervals
- Nonmetallic-sheathed cable must be secured at intervals not exceeding 4½ feet and within 12 inches of every box or fitting that does not provide a cable clamp.
- Box fill per 12 AWG conductor
- Each 12 AWG conductor counts as 2.25 cubic inches of box volume, each 14 AWG counts 2.0 cubic inches, and each 10 AWG counts 2.5 cubic inches.
- Grounding conductor box fill count
- All equipment grounding conductors in a box together count as one conductor volume, while each device or yoke counts as two volumes based on the largest conductor connected.
- Direct burial cover depth
- Cables and conductors at 600 volts or less must be buried at least 24 inches deep, except 18 inches under one- and two-family driveways and 12 inches for GFCI-protected residential branch circuits.
- EMT support requirements
- Electrical metallic tubing must be fastened within 3 feet of each box or termination and supported at intervals not exceeding 10 feet along the run.
- Raceway 40 percent fill rule
- Where three or more conductors are installed in a raceway, their total cross-sectional area may not exceed 40 percent of the interior cross-sectional area of the raceway.
- Motor branch conductor sizing
- Motor branch-circuit conductors must have an ampacity of at least 125 percent of the motor full-load current taken from the NEC motor tables, unless the motor is marked otherwise.
- Motor running overload protection
- Overload protection guards the motor against overheating from overload currents and is separate from the short-circuit and ground-fault protection; it is sized from nameplate service factor or temperature rise.
- Fixed space heating branch circuits
- For fixed electric space-heating equipment, branch-circuit conductors and overcurrent devices must be sized at 125 percent of the total connected load.
- Air-conditioning nameplate protection
- For a hermetic refrigerant motor-compressor, the branch-circuit short-circuit and ground-fault protective device may not exceed the rating marked on the nameplate as maximum fuse or circuit breaker.
- Switch mounting height
- Switches and circuit breakers used as switches must be installed so the center of the grip is not more than 6 feet 7 inches above the floor or working platform.
- Class I hazardous location
- Class I locations are those in which flammable gases or vapors may be present in quantities sufficient to produce explosive or ignitable mixtures, covered by Article 501.
- Division 1 versus Division 2
- Division 1 covers conditions that exist during normal operation; Division 2 covers conditions that exist only under abnormal operation such as equipment failure or faulty operation.
- Repair garage floor classification
- In major repair garages, the space from the floor up to 18 inches above it is classified Class I, Division 2 because gasoline vapors are heavier than air.
- Pool equipotential bonding grid
- Article 680 requires a bonding grid connecting pool shells, reinforcing steel, metal fittings, and associated equipment to eliminate voltage gradients, typically using 8 AWG solid copper.
- Hazardous location equipment marking
- Equipment intended for hazardous locations must be marked with its class, division or zone, and gas or dust group so it matches the classification of the area.
- Ground rod electrode
- A rod or pipe grounding electrode must be at least 8 feet long and ½ inch in diameter, driven below permanent moisture level, and supplemented unless its resistance is 25 ohms or less.
- Concrete-encased electrode
- At least 20 feet of ½-inch or larger reinforcing steel, or 20 feet of bare 4 AWG copper, encased in at least 2 inches of concrete near the bottom of a footing.
- Grounding electrode conductor sizing
- Table 250.66 requires a 2 AWG copper grounding electrode conductor where the largest ungrounded service conductor is over 3/0 through 350 kcmil.
- Equipment grounding conductor sizing
- Table 250.122 requires 12 AWG copper for a 20-ampere device, 10 AWG for 60 amperes, 8 AWG for 100 amperes, and 6 AWG for 200 amperes.
- Small conductor overcurrent limits
- Unless specifically permitted, 14 AWG copper is limited to 15 amperes, 12 AWG copper to 20 amperes, and 10 AWG copper to 30 amperes.
- Intersystem bonding termination
- A visible and accessible intersystem bonding termination must be provided near the service equipment so communications, CATV, and radio systems can connect to the grounding electrode system.
- Virginia electrician licensing authority
- Electrician tradesman licenses in Virginia are issued by the Department of Professional and Occupational Regulation through the Board for Contractors, under Title 54.1 of the Code of Virginia.
- Virginia electrician license levels
- Virginia credentials electricians as apprentice, journeyman, and master; a separate electrical contractor license is required to contract with the public for electrical work.
- Virginia excavation notice rule
- Before excavating in Virginia, the excavator must notify the notification center at 811 at least 2 business days but not more than 10 business days before the planned start.
- Virginia building code adoption
- The Virginia Uniform Statewide Building Code adopts the National Electrical Code by reference, and local building officials enforce it through permits, inspections, and certificates of occupancy.