Week 1

Electrical Regulatory Framework, Licensing and Standards (AS/NZS 3000 and related) & Earthing, Protective Bonding and Fault Loop Impedance

  • Map each clause group of AS/NZS 3000 to the ten exam domains so you can locate the governing rule for any scenario

  • Explain the roles of the regulator, licensing body and standards framework in South Australia and how each affects a licensed installer

  • Derive the fault loop impedance limit for a given protective device and supply arrangement using the standard formula

  • Identify the protective earthing and bonding requirements for a main switchboard and a sub-board in a typical installation

Your checkpoint

A one-page cross-reference sheet linking AS/NZS 3000 clause groups to exam domains, plus five worked fault loop impedance limit calculations with answers

Week 2

Electrical Design, Load and Maximum Demand Calculations & Cable Selection, Installation Methods and Voltage Drop

  • Calculate maximum demand for a domestic installation using the standard's demand methods and justify each diversity allowance applied

  • Select cable size for a given circuit by checking current-carrying capacity, derating factors, voltage drop and protective device coordination in that order

  • Apply correction factors for ambient temperature, grouping and thermal insulation to a tabulated current-carrying capacity

  • Compute voltage drop for single-phase and three-phase circuits and compare against the standard's limits

Your checkpoint

A full design calculation for one domestic and one small commercial installation covering maximum demand, cable selection and voltage drop, with all assumptions stated

Week 3

Earthing, Protective Bonding and Fault Loop Impedance & Protection, Switchgear, Control and Discrimination

  • Size protective earthing conductors and main earthing conductors from the active conductor cross-section and justify any reduction

  • Determine the required disconnection time for a circuit from its earthing system type and describe how to verify it by test

  • Select and set protective devices to achieve discrimination between a main and a sub-circuit breaker for overload and short circuit

  • Explain the operating principles of RCDs, MCBs and MCCBs and state the selection criteria for each application

Your checkpoint

A switchboard schedule for a two-board installation showing device ratings, settings, earthing conductor sizes and a written discrimination justification

Week 4

Cable Selection, Installation Methods and Voltage Drop & Special Installations and Locations (hazardous areas, medical, wet areas, construction sites)

  • Choose an installation method and wiring system for a given environment and defend the choice against the standard's requirements

  • Apply the additional requirements for wet areas, construction sites, medical locations and hazardous areas to a set of scenarios

  • Classify a hazardous area by zone and match the equipment selection to that classification

  • Identify the specific control measures required for construction-site and temporary installations

Your checkpoint

A scenario workbook of ten special-location cases, each answered with the applicable requirements, the chosen equipment and the reasoning

Week 5

Testing, Verification, Commissioning and Certification & Fault Diagnosis, Maintenance and Repair

  • Sequence the verification tests for a new installation in the correct order and state the purpose and pass criterion for each

  • Perform and interpret insulation resistance, polarity, continuity of earthing and fault loop impedance results on worked sample data

  • Diagnose five fault scenarios from symptoms and test results and nominate the next test to confirm each diagnosis

  • Describe the certification and record-keeping obligations that follow verification and commissioning

Your checkpoint

A completed verification checklist and test-record template with five worked fault-diagnosis cases showing symptom, test sequence and conclusion

Week 6

Testing, Verification, Commissioning and Certification & Fault Diagnosis, Maintenance and Repair & Work Health and Safety, Risk Control and Safe Work Practices

  • Explain the hierarchy of risk control and apply it to live-work, isolation and testing activities on site

  • Identify the WHS duties of a licensed installer, a supervisor and a principal contractor for a given site situation

  • Plan a safe isolation procedure including proving dead and applying locks and tags

  • Review a maintenance and repair task and specify the isolation, testing and re-commissioning steps required

Your checkpoint

A written safe work method statement for a testing and repair task, including isolation sequence, risk controls and re-commissioning checks

Week 7

Business, Contract, Supervisory and Consumer Relations Responsibilities & Electrical Regulatory Framework, Licensing and Standards (AS/NZS 3000 and related)

  • Explain the contractual and consumer-protection obligations that attach to quoting, contracting and completing electrical work

  • Draft the key clauses of a quotation and a variation notice that protect both the installer and the consumer

  • Describe the supervisory responsibilities of a licensed installer over apprentices and unlicensed workers

  • Resolve two consumer complaint scenarios using the regulatory and contractual framework

Your checkpoint

A quotation template with variation and complaint-handling procedures, plus written responses to two consumer dispute scenarios

Week 8

Electrical Design, Load and Maximum Demand Calculations & Earthing, Protective Bonding and Fault Loop Impedance & Protection, Switchgear, Control and Discrimination & Cable Selection, Installation Methods and Voltage Drop & Special Installations and Locations (hazardous areas, medical, wet areas, construction sites) & Testing, Verification, Commissioning and Certification & Fault Diagnosis, Maintenance and Repair & Work Health and Safety, Risk Control and Safe Work Practices & Business, Contract, Supervisory and Consumer Relations Responsibilities

  • Complete a full-length timed practice exam under exam conditions and record your score by domain

  • Re-study the two weakest domains using your week 1 to 7 deliverables as the reference

  • Re-attempt every question you answered incorrectly and write a one-line reason for each corrected answer

  • Build a final one-page formula and limits sheet covering demand, voltage drop, fault loop impedance and disconnection times

Your checkpoint

A scored practice exam with a domain-by-domain error log and a final one-page formula and limits sheet

Milestones

Week 2: You can complete a domestic maximum demand and cable selection calculation end to end without referring to worked examples

Week 4: You score at least 70 percent on a self-made 30-question set drawn from domains 1 to 6

Week 6: You can state the correct test sequence and pass criteria for a new installation from memory

Week 8: You score at least 80 percent overall on the timed practice exam with no domain below 65 percent