SA Master Installation Electrician study plan
SA Master Installation Electrician · Give each week a clear focus.
8 weeks · About 7 hours per week
Electrical Regulatory Framework, Licensing and Standards (AS/NZS 3000 and related) & Earthing, Protective Bonding and Fault Loop Impedance
Map each clause group of AS/NZS 3000 to the ten exam domains so you can locate the governing rule for any scenario
Explain the roles of the regulator, licensing body and standards framework in South Australia and how each affects a licensed installer
Derive the fault loop impedance limit for a given protective device and supply arrangement using the standard formula
Identify the protective earthing and bonding requirements for a main switchboard and a sub-board in a typical installation
Your checkpoint
A one-page cross-reference sheet linking AS/NZS 3000 clause groups to exam domains, plus five worked fault loop impedance limit calculations with answers
Electrical Design, Load and Maximum Demand Calculations & Cable Selection, Installation Methods and Voltage Drop
Calculate maximum demand for a domestic installation using the standard's demand methods and justify each diversity allowance applied
Select cable size for a given circuit by checking current-carrying capacity, derating factors, voltage drop and protective device coordination in that order
Apply correction factors for ambient temperature, grouping and thermal insulation to a tabulated current-carrying capacity
Compute voltage drop for single-phase and three-phase circuits and compare against the standard's limits
Your checkpoint
A full design calculation for one domestic and one small commercial installation covering maximum demand, cable selection and voltage drop, with all assumptions stated
Earthing, Protective Bonding and Fault Loop Impedance & Protection, Switchgear, Control and Discrimination
Size protective earthing conductors and main earthing conductors from the active conductor cross-section and justify any reduction
Determine the required disconnection time for a circuit from its earthing system type and describe how to verify it by test
Select and set protective devices to achieve discrimination between a main and a sub-circuit breaker for overload and short circuit
Explain the operating principles of RCDs, MCBs and MCCBs and state the selection criteria for each application
Your checkpoint
A switchboard schedule for a two-board installation showing device ratings, settings, earthing conductor sizes and a written discrimination justification
Cable Selection, Installation Methods and Voltage Drop & Special Installations and Locations (hazardous areas, medical, wet areas, construction sites)
Choose an installation method and wiring system for a given environment and defend the choice against the standard's requirements
Apply the additional requirements for wet areas, construction sites, medical locations and hazardous areas to a set of scenarios
Classify a hazardous area by zone and match the equipment selection to that classification
Identify the specific control measures required for construction-site and temporary installations
Your checkpoint
A scenario workbook of ten special-location cases, each answered with the applicable requirements, the chosen equipment and the reasoning
Testing, Verification, Commissioning and Certification & Fault Diagnosis, Maintenance and Repair
Sequence the verification tests for a new installation in the correct order and state the purpose and pass criterion for each
Perform and interpret insulation resistance, polarity, continuity of earthing and fault loop impedance results on worked sample data
Diagnose five fault scenarios from symptoms and test results and nominate the next test to confirm each diagnosis
Describe the certification and record-keeping obligations that follow verification and commissioning
Your checkpoint
A completed verification checklist and test-record template with five worked fault-diagnosis cases showing symptom, test sequence and conclusion
Testing, Verification, Commissioning and Certification & Fault Diagnosis, Maintenance and Repair & Work Health and Safety, Risk Control and Safe Work Practices
Explain the hierarchy of risk control and apply it to live-work, isolation and testing activities on site
Identify the WHS duties of a licensed installer, a supervisor and a principal contractor for a given site situation
Plan a safe isolation procedure including proving dead and applying locks and tags
Review a maintenance and repair task and specify the isolation, testing and re-commissioning steps required
Your checkpoint
A written safe work method statement for a testing and repair task, including isolation sequence, risk controls and re-commissioning checks
Business, Contract, Supervisory and Consumer Relations Responsibilities & Electrical Regulatory Framework, Licensing and Standards (AS/NZS 3000 and related)
Explain the contractual and consumer-protection obligations that attach to quoting, contracting and completing electrical work
Draft the key clauses of a quotation and a variation notice that protect both the installer and the consumer
Describe the supervisory responsibilities of a licensed installer over apprentices and unlicensed workers
Resolve two consumer complaint scenarios using the regulatory and contractual framework
Your checkpoint
A quotation template with variation and complaint-handling procedures, plus written responses to two consumer dispute scenarios
Electrical Design, Load and Maximum Demand Calculations & Earthing, Protective Bonding and Fault Loop Impedance & Protection, Switchgear, Control and Discrimination & Cable Selection, Installation Methods and Voltage Drop & Special Installations and Locations (hazardous areas, medical, wet areas, construction sites) & Testing, Verification, Commissioning and Certification & Fault Diagnosis, Maintenance and Repair & Work Health and Safety, Risk Control and Safe Work Practices & Business, Contract, Supervisory and Consumer Relations Responsibilities
Complete a full-length timed practice exam under exam conditions and record your score by domain
Re-study the two weakest domains using your week 1 to 7 deliverables as the reference
Re-attempt every question you answered incorrectly and write a one-line reason for each corrected answer
Build a final one-page formula and limits sheet covering demand, voltage drop, fault loop impedance and disconnection times
Your checkpoint
A scored practice exam with a domain-by-domain error log and a final one-page formula and limits sheet
Milestones
Week 2: You can complete a domestic maximum demand and cable selection calculation end to end without referring to worked examples
Week 4: You score at least 70 percent on a self-made 30-question set drawn from domains 1 to 6
Week 6: You can state the correct test sequence and pass criteria for a new installation from memory
Week 8: You score at least 80 percent overall on the timed practice exam with no domain below 65 percent