AACE CCT · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Cost Estimating

  • Classify estimate types (concept, feasibility, detailed, definitive) by purpose, required input maturity, and expected accuracy range, and write your own comparison table from memory

  • Compute unit-rate, factored, and parametric estimates for three sample scope packages, showing the arithmetic step by step

  • Apply escalation, contingency, and allowance adjustments to a base estimate and reconcile the adjusted total

  • Build a one-page formula and method reference sheet covering cost indexing, productivity factors, and adjustment math

Your checkpoint

A 30-problem estimating drill set completed closed-book with ≥85% accuracy, plus the finished one-page reference sheet.

Week 2

Cost Estimating & Project Planning and Scheduling

  • Diagnose and correct every error from the week 1 drill set, tagging each miss as knowledge gap, arithmetic slip, or misread question

  • Estimate labor, material, equipment, and indirect costs for a small work package and roll them into a summary with overhead and markup

  • Define scheduling terminology and network logic rules (activity, dependency, lag, lead, constraint, milestone) in your own words

  • Convert a written scope narrative into a 15-activity precedence list with logical ties

Your checkpoint

A timed 40-question Domain 1 practice section scored ≥75%, with a written error log categorizing every missed item.

Week 3

Project Planning and Scheduling

  • Perform a full forward and backward pass on a 12-15 activity network, computing ES, EF, LS, LF, total float, and free float

  • Identify the critical path and explain how a single logic change shifts it

  • Compare finish-to-start, start-to-start, finish-to-finish, and start-to-finish relationships with realistic construction and engineering examples

  • Convert a CPM network into a milestone-based bar chart schedule and note where the two views diverge

Your checkpoint

A hand-calculated CPM schedule for a 12-15 activity network showing all early/late dates, float values, and the marked critical path, cross-checked line by line for arithmetic errors.

Week 4

Project Planning and Scheduling & Cost Estimating

  • Crash a schedule by two working days, computing cost slope per activity and justifying which activities to shorten first

  • Apply resource leveling to a network with an over-allocated crew and document the resulting schedule impact

  • Compute schedule variance in calendar terms when weather, procurement, or approval durations change

  • Re-drill the weakest two Domain 1 topics identified in your error log

Your checkpoint

A timed 60-question mixed Domain 1 and Domain 2 exam scored ≥75%, with all misses reviewed and re-solved correctly.

Week 5

Project Monitoring and Control

  • Compute BCWS, BCWP, and ACWP from a progress narrative and derive CV, SV, CPI, and SPI

  • Calculate EAC using at least three distinct forecasting formulas and explain when each is the correct choice

  • Compute TCPI and interpret what it implies about remaining cost performance

  • Build a progress measurement scheme (percent complete rules, earned value of work packages) for a sample project

Your checkpoint

A 20-computation earned value problem set solved with ≥85% accuracy, each answer annotated with the formula used and its interpretation.

Week 6

Project Monitoring and Control & Project Planning and Scheduling

  • Construct a cost-loaded progress curve (S-curve) from weekly data and mark where the project departs from plan

  • Analyze a variance report and write corrective-action recommendations tied to specific cost accounts

  • Diagnose schedule slippage using float consumption and near-critical path analysis, then propose recovery options

  • Re-drill the two weakest Domain 2 computational topics from your error log

Your checkpoint

A one-page earned value and forecasting decision table plus a timed 50-question Domain 3 section scored ≥75%.

Week 7

Project Cost and Business Management

  • Calculate NPV, IRR, payback period, and benefit-cost ratio for two competing project alternatives and recommend one

  • Build a simple cash flow forecast showing funding requirements and the effect of payment timing on project financing cost

  • Explain change order, claims, and contract type (lump sum, unit price, cost reimbursable) effects on cost risk allocation, using worked examples

  • Compute productivity, unit cost, and variance from field quantity data

Your checkpoint

A 30-question Domain 4 problem set at ≥80% accuracy plus a completed financial-metrics formula sheet covering all four metric families.

Week 8

Cost Estimating & Project Planning and Scheduling & Project Monitoring and Control & Project Cost and Business Management

  • Complete two full-length timed simulations under exam conditions with no reference material

  • Review every missed item across both simulations and re-solve each to full correctness

  • Consolidate all four domain formula sheets into one master sheet you can reproduce from memory

  • Rank remaining weak areas by expected point impact and drill only the top three

Your checkpoint

Two full-length timed simulations averaging ≥80%, with a final one-page remediation list naming the three highest-impact weak areas and the specific drill for each.

Milestones

Week 2: Complete a timed 40-question Domain 1 section at ≥75%; if below, extend Domain 1 review into week 3 mornings before starting new Domain 2 material.

Week 4: Complete a timed 60-question Domain 1 plus Domain 2 exam at ≥75% and demonstrate a hand-built CPM network with correct float values from scratch.

Week 6: Cumulative timed practice average across Domains 1-3 at ≥75%, and all earned value forecasting formulas reproduced from memory without notes.

Week 8: Two full-length timed simulations averaging ≥80% across all four domains, with no domain scoring below 70%.