Quick reference

Forensic Claims Consulting

  • Forensic claims consulting applies engineering, scheduling, and cost-analysis methods to reconstruct causation, liability, and quantum of a disputed claim.

  • Forensic schedule analysis compares as-planned, as-built, and impacted schedules; baseline must be the contemporaneous approved schedule, not a hindsight reconstruction.

  • Delay = time impact on completion; disruption = lost productivity without necessarily extending completion; the two are quantified by different methods.

  • Critical path method (CPM) logic governs entitlement: only delay affecting the controlling critical path yields time entitlement; near-critical float consumption is measured, not assumed.

  • Concurrent delay exists when two or more independent critical delays overlap; under most common-law standards neither party recovers time-related costs for the concurrent period.

  • Total cost method is disfavored; it requires (a) impracticability of a better method, (b) reasonableness of bid, (c) reasonableness of actual cost, and (d) absence of owner-caused or contractor-caused fault.

  • Measured-mile or modified total cost isolates owner-caused inefficiency by comparing bid productivity to actual, then excluding contractor-responsible variance.

  • Forensic cost analysis distinguishes direct cost, indirect/time-related cost, escalation, and profit; each is proven separately with contemporaneous records.

  • Documentation hierarchy for reliability: contemporaneous daily records and cost ledgers > periodic reports > after-the-fact reconstructions > opinion testimony.

Quick reference

Claims and Dispute Resolution

  • A claim requires a causal link: entitlement (contract/legal basis) + liability (responsibility) + causation (delay/disruption) + quantum (cost/time), each independently proven.

  • Notice and claim-preservation clauses are conditions precedent in many contracts; failure to give timely written notice can bar an otherwise valid claim regardless of merit.

  • Time-bar and notice provisions are strictly construed; the clock typically runs from the date the claimant knew or should have known of the event.

  • Change order vs. constructive change: a constructive change arises when the owner's conduct (e.g., defective specifications, overzealous inspection) forces work outside the contract without a formal directive.

  • Differing site conditions are commonly bifurcated into Type I (differing from contract documents) and Type II (differing from what a reasonable site investigation would reveal); notice timing differs.

  • Dispute resolution ladder typically escalates: negotiation → mediation → neutral evaluation/adjudication → arbitration or litigation; each step has its own limitation and cost profile.

  • Arbitration awards are generally final and subject to very limited judicial review (fraud, misconduct, exceeding authority); appeals on the merits are rarely available.

  • Suspension of work and termination for convenience entitle the contractor to costs incurred plus reasonable profit on work done, but not anticipatory lost profit on unperformed work.

  • Burden of proof rests on the claimant; quantum must be proven with reasonable certainty, and speculative or unsubstantiated costs are disallowed.