DPMO formula
Defects per million opportunities equals defects divided by (units times opportunities per unit), multiplied by one million. It normalizes defect counts for comparison across processes.
Six Sigma defect target
Six Sigma aims for 3.4 defects per million opportunities, reflecting a process centered at a 1.5 sigma shift from specification limits.
DMAIC vs DMADV
DMAIC improves an existing process through Define, Measure, Analyze, Improve, Control. DMADV designs a new process or product through Define, Measure, Analyze, Design, Verify.
Eight wastes
Lean's eight wastes are defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion, and extra processing. They represent non-value-adding activity.
Rolled throughput yield
RTY is the product of each process step's first-pass yield. If five steps each yield 95%, RTY is approximately 77%.
Cost of poor quality
COPQ includes internal failure, external failure, appraisal, and prevention costs. Prevention and appraisal are costs of good quality, not poor quality.
Critical to quality
CTQs translate voice-of-customer needs into measurable characteristics with defined specification limits. They drive what the project measures.
Cp definition
Cp equals (USL minus LSL) divided by six sigma. It measures potential capability and ignores whether the process is centered.
Cpk definition
Cpk is the minimum of (USL minus mean) and (mean minus LSL), each divided by three sigma. It accounts for centering and never exceeds Cp.
Capability threshold
A process is commonly considered capable at Cpk of 1.33 or greater, with 1.67 or greater often required for critical characteristics.
OEE formula
Overall equipment effectiveness equals Availability times Performance times Quality. World-class OEE is commonly cited at 85%.
Takt time
Takt time equals available production time divided by customer demand rate. It sets the pace a process must meet to satisfy demand.
Little's Law
Little's Law states that work-in-process equals throughput rate multiplied by flow time. It relates inventory, throughput, and cycle time in a process.
Tuckman team stages
Teams develop through forming, storming, norming, performing, and adjourning. Each stage has distinct leadership needs and team dynamics.
RACI matrix
RACI assigns Responsible, Accountable, Consulted, and Informed roles to tasks. Only one person should be accountable for each task.
Team charter contents
A team charter documents purpose, scope, sponsor, members, milestones, and decision authority. It aligns the team and prevents scope creep.
Thomas-Kilmann conflict modes
Five conflict-handling modes are competing, collaborating, compromising, avoiding, and accommodating. Choice depends on importance of outcome and relationship.
SIPOC diagram
SIPOC maps Suppliers, Inputs, Process, Outputs, and Customers at a high level. It defines process scope and boundaries for the project.
Problem statement criteria
A problem statement should be data-based, quantified, and free of cause or solution language. It states what is wrong and how much.
SMART goal statement
A SMART goal is specific, measurable, achievable, relevant, and time-bound. In Six Sigma it names the metric, baseline, target, and target date.
Kano model categories
Kano classifies requirements as must-be, performance, attractive, indifferent, or reverse. Must-be needs cause dissatisfaction if absent but do not delight when met.
Gage R&R components
Gage R&R partitions measurement variation into repeatability (equipment) and reproducibility (appraiser). Variation under 10% of tolerance is generally acceptable.
Rational subgrouping
Rational subgroups group items produced under similar conditions so within-subgroup variation reflects common causes only. This makes control chart limits meaningful.
Type I and II errors
Type I error rejects a true null hypothesis (alpha). Type II error fails to reject a false null (beta). Power equals one minus beta.
ANOVA purpose
ANOVA compares means of three or more groups. The F statistic is between-group variance divided by within-group variance.
Chi-square test purpose
The chi-square test of independence evaluates whether two categorical variables are associated. It compares observed counts to expected counts.
Poka-yoke
Poka-yoke is error proofing that prevents defects by design rather than detecting them by inspection. Examples include fixtures that make incorrect assembly impossible.
FMEA risk priority number
RPN equals Severity times Occurrence times Detection. Higher RPN failure modes are prioritized for corrective action.
5S method
5S consists of sort, set in order, shine, standardize, and sustain. It creates an organized, standardized workplace that supports flow and reduces waste.
Control chart signals
Points outside three-sigma control limits, runs of eight on one side, and trends signal special-cause variation. Control limits come from process data, not specifications.
Attribute control charts
p and np charts monitor proportion or number defective per subgroup. c and u charts monitor defect counts per unit.
Control plan contents
A control plan records the characteristic, specification, measurement method, sample size, frequency, and reaction plan. It sustains improvements after project closure.