CLBB key terms
CLBB · Get comfortable with the vocabulary.
- Lean Six Sigma
- Related: Waste (Muda), DMAIC, Critical to Quality (CTQ)
A process-improvement approach that combines Lean's focus on removing waste and speeding flow with Six Sigma's statistical focus on reducing variation and defects.
- DMAIC
- Related: Define Phase, Control Phase, Lean Six Sigma
A five-phase improvement cycle-Define, Measure, Analyze, Improve, Control-used to solve problems where the cause is unknown and results must be sustained.
- Waste (Muda)
- Related: Value Stream Map, Kaizen, Lean Six Sigma
Any activity that consumes resources without adding value for the customer, commonly grouped into eight categories such as overproduction, waiting, transport, and defects.
- Kaizen
- Related: Waste (Muda), PDCA Cycle, 5S
A philosophy of continuous, incremental improvement carried out by the people who do the work, often through small rapid changes rather than large one-time projects.
- 5S
- Related: Kaizen, Standard Work, Visual Management
A workplace-organization method with five steps-sort, set in order, shine, standardize, sustain-that reduces searching, clutter, and errors before deeper process work begins.
- Value Stream Map
- Related: Waste (Muda), Little's Law, Process Map
A diagram showing the sequence of process steps, information flows, inventories, and delay times needed to deliver a product or service, used to expose non-value-adding activity.
- Critical to Quality (CTQ)
- Related: Voice of the Customer, SIPOC Diagram, Project Charter
A measurable customer requirement translated from vague customer language into specific, verifiable performance characteristics that a process must satisfy.
- Voice of the Customer (VOC)
- Related: Critical to Quality (CTQ), Kano Model, SIPOC Diagram
Structured collection of customer needs, expectations, and complaints through interviews, surveys, and observation, forming the input for translating requirements into measurable specifications.
- Project Charter
- Related: Problem Statement, SMART Goal, Stakeholder Analysis
A short authorizing document that states the problem, goal, scope, business case, team, milestones, and constraints for an improvement project.
- Problem Statement
- Related: Project Charter, SMART Goal, Root Cause Analysis
A concise description of a gap between current and desired performance, stating what, where, when, and how much without naming a cause or a solution.
- SMART Goal
- Related: Problem Statement, Project Charter
A goal written to be specific, measurable, achievable, relevant, and time-bound, so progress and completion can be judged objectively.
- SIPOC Diagram
- Related: Process Map, Voice of the Customer, Critical to Quality (CTQ)
A high-level view of a process showing its suppliers, inputs, process steps, outputs, and customers, used to agree on scope before detailed mapping.
- Process Map
- Related: SIPOC Diagram, Value Stream Map, Swimlane Diagram
A flowchart of the steps, decisions, and handoffs in a process, used to reveal rework loops, unnecessary steps, and ownership gaps.
- Swimlane Diagram
- Related: Process Map, Value Stream Map
A process map arranged in lanes by role or department so handoffs, delays, and accountability between functions are easy to see.
- Stakeholder Analysis
- Related: Project Charter, RACI Matrix, Change Management
Identification of the people and groups affected by or able to influence a project, along with their interests, influence, and needed engagement.
- RACI Matrix
- Related: Stakeholder Analysis, Team Development Stages
A table assigning each task or decision to those responsible, accountable, consulted, and informed, clarifying roles and preventing duplicated or missing ownership.
- Team Development Stages
- Related: RACI Matrix, Facilitation, Change Management
The typical progression of a team through forming, storming, norming, performing, and adjourning, each calling for different leadership emphasis.
- Facilitation
- Related: Team Development Stages, Brainstorming, Nominal Group Technique
Guiding a group meeting or workshop so objectives are met, all voices contribute, and the team reaches decisions without the leader dictating content.
- Change Management
- Related: Control Plan, Stakeholder Analysis, Standard Work
The structured activities used to prepare people for a process change, address resistance, build sponsorship, and make new ways of working stick.
- Y=f(x)
- Related: Root Cause Analysis, Design of Experiments, Process Capability
A shorthand stating that an outcome (Y) is a function of one or more process inputs (x), which directs attention to controlling inputs rather than inspecting outputs.
- Measurement System Analysis (MSA)
- Related: Gage R&R, Attribute Agreement Analysis, Data Collection Plan
A study that quantifies how much observed variation comes from the measurement system itself, covering repeatability, reproducibility, bias, linearity, and stability.
- Gage R&R
- Related: Measurement System Analysis (MSA), Attribute Agreement Analysis
A repeatability and reproducibility study estimating variation from the measuring device and from operators, usually expressed as a percentage of total or tolerance variation.
- Attribute Agreement Analysis
- Related: Measurement System Analysis (MSA), Gage R&R
A study of how consistently appraisers make categorical judgments, such as pass/fail or defect type, comparing each appraiser with themselves and with a reference standard.
- Data Collection Plan
- Related: Operational Definition, Sampling Plan, Measurement System Analysis (MSA)
A document specifying what data to gather, operational definitions, data type, sampling method, sample size, location, timing, and who records it.
- Operational Definition
- Related: Data Collection Plan, Attribute Agreement Analysis
A precise, unambiguous description of how a characteristic is measured or judged, so different people classify the same item the same way.
- Sampling Plan
- Related: Data Collection Plan, Central Limit Theorem
The rules for selecting which items to measure, including sample size, frequency, and method such as random, stratified, or systematic selection.
- Central Limit Theorem
- Related: Sampling Plan, Hypothesis Test, Control Chart
The principle that sample means tend toward a normal distribution as sample size grows, regardless of the shape of the underlying population distribution.
- Process Capability
- Related: Specification Limits, Control Chart, Y=f(x)
A comparison of process spread and centering against specification limits, summarized by indices such as Cp and Cpk for stable, normally distributed processes.
- Specification Limits
- Related: Process Capability, Control Chart
The upper and lower bounds on a characteristic set by the customer or design, which are distinct from the control limits calculated from process data.
- Control Chart
- Related: Common Cause Variation, Special Cause Variation, Specification Limits
A time-ordered plot of a process measure with statistically derived limits that separates common-cause variation from signals of special-cause variation.
- Common Cause Variation
- Related: Special Cause Variation, Control Chart
The routine, inherent variation produced by the design of a stable process, which is reduced only by changing the system itself.
- Special Cause Variation
- Related: Common Cause Variation, Control Chart, Root Cause Analysis
Irregular variation traceable to an identifiable event, input, or disturbance outside the normal process, signaled by rule violations on a control chart.
- Hypothesis Test
- Related: p-value, Type I Error, Central Limit Theorem
A statistical procedure that weighs sample evidence against a stated null hypothesis, producing a p-value used to decide whether an observed difference is likely real.
- p-value
- Related: Hypothesis Test, Type I Error, Type II Error
The probability of observing data at least as extreme as the sample result if the null hypothesis were true; small values suggest the null is inconsistent with the data.
- Type I Error
- Related: Type II Error, p-value, Hypothesis Test
Concluding that a real difference or effect exists when it does not, often called a false alarm, with probability denoted by alpha.
- Type II Error
- Related: Type I Error, Sample Size
Failing to detect a real difference or effect that exists, often called a miss, with probability denoted by beta; its complement is statistical power.
- Sample Size
- Related: Type II Error, Sampling Plan
The number of observations needed to detect an effect of practical interest with acceptable risk of Type I and Type II errors.
- Root Cause Analysis
- Related: Fishbone Diagram, Y=f(x), Hypothesis Test
A set of techniques, such as the five whys, cause-and-effect diagrams, and stratification, used to find the underlying reasons a problem occurs rather than its symptoms.
- Fishbone Diagram
- Related: Root Cause Analysis, Brainstorming
A cause-and-effect diagram that organizes possible causes of a problem into branches, often people, method, machine, material, measurement, and environment.
- Brainstorming
- Related: Nominal Group Technique, Fishbone Diagram, Facilitation
A group technique for generating many candidate ideas or causes quickly, deferring judgment so quantity and variety come before evaluation.
- Nominal Group Technique
- Related: Brainstorming, Facilitation
A structured group method in which members write ideas silently, share them, then rank or vote, reducing dominance and anchoring effects in idea selection.
- Design of Experiments
- Related: Y=f(x), Pilot Study, Root Cause Analysis
A planned set of runs that deliberately varies input factors together so their individual and interacting effects on a response can be estimated efficiently.
- Pilot Study
- Related: Design of Experiments, Control Plan, Change Management
A small-scale trial of a proposed change run under controlled conditions to confirm expected benefits and surface problems before full deployment.
- PDCA Cycle
- Related: Kaizen, Pilot Study
A repeating loop of plan, do, check, and act that structures iterative testing and adjustment of improvements.
- Poka-Yoke
- Related: Standard Work, Control Plan
A mistake-proofing device or design feature that prevents an error from being made or makes an error immediately obvious before it passes downstream.
- Standard Work
- Related: Control Plan, 5S, Poka-Yoke
Documented, current best method for a task, including sequence, timing, and key quality points, forming the baseline against which further improvement is measured.
- Control Plan
- Related: Standard Work, Control Chart, Change Management
A document listing the process steps, measures, monitoring methods, frequencies, response plans, and owners used to keep an improved process in control.
- Visual Management
- Related: 5S, Standard Work, Control Chart
Placing performance information, status, and standards where the work happens so deviations are noticed immediately without asking or searching.
- Little's Law
- Related: Value Stream Map, Waste (Muda)
A relationship stating that average work-in-process equals average arrival rate multiplied by average time in the system, used to reason about queues and lead time.
- Kano Model
- Related: Voice of the Customer, Critical to Quality (CTQ)
A way of classifying customer needs as basic, performance, or delighter, based on how satisfaction responds to the presence or absence of a feature.