CLBB study materials
CLBB study resources

CLBB key terms

CLBB · Get comfortable with the vocabulary.

Lean Six Sigma

A process-improvement approach that combines Lean's focus on removing waste and speeding flow with Six Sigma's statistical focus on reducing variation and defects.

Related: Waste (Muda), DMAIC, Critical to Quality (CTQ)
DMAIC

A five-phase improvement cycle-Define, Measure, Analyze, Improve, Control-used to solve problems where the cause is unknown and results must be sustained.

Related: Define Phase, Control Phase, Lean Six Sigma
Waste (Muda)

Any activity that consumes resources without adding value for the customer, commonly grouped into eight categories such as overproduction, waiting, transport, and defects.

Related: Value Stream Map, Kaizen, Lean Six Sigma
Kaizen

A philosophy of continuous, incremental improvement carried out by the people who do the work, often through small rapid changes rather than large one-time projects.

Related: Waste (Muda), PDCA Cycle, 5S
5S

A workplace-organization method with five steps-sort, set in order, shine, standardize, sustain-that reduces searching, clutter, and errors before deeper process work begins.

Related: Kaizen, Standard Work, Visual Management
Value Stream Map

A diagram showing the sequence of process steps, information flows, inventories, and delay times needed to deliver a product or service, used to expose non-value-adding activity.

Related: Waste (Muda), Little's Law, Process Map
Critical to Quality (CTQ)

A measurable customer requirement translated from vague customer language into specific, verifiable performance characteristics that a process must satisfy.

Related: Voice of the Customer, SIPOC Diagram, Project Charter
Voice of the Customer (VOC)

Structured collection of customer needs, expectations, and complaints through interviews, surveys, and observation, forming the input for translating requirements into measurable specifications.

Related: Critical to Quality (CTQ), Kano Model, SIPOC Diagram
Project Charter

A short authorizing document that states the problem, goal, scope, business case, team, milestones, and constraints for an improvement project.

Related: Problem Statement, SMART Goal, Stakeholder Analysis
Problem Statement

A concise description of a gap between current and desired performance, stating what, where, when, and how much without naming a cause or a solution.

Related: Project Charter, SMART Goal, Root Cause Analysis
SMART Goal

A goal written to be specific, measurable, achievable, relevant, and time-bound, so progress and completion can be judged objectively.

Related: Problem Statement, Project Charter
SIPOC Diagram

A high-level view of a process showing its suppliers, inputs, process steps, outputs, and customers, used to agree on scope before detailed mapping.

Related: Process Map, Voice of the Customer, Critical to Quality (CTQ)
Process Map

A flowchart of the steps, decisions, and handoffs in a process, used to reveal rework loops, unnecessary steps, and ownership gaps.

Related: SIPOC Diagram, Value Stream Map, Swimlane Diagram
Swimlane Diagram

A process map arranged in lanes by role or department so handoffs, delays, and accountability between functions are easy to see.

Related: Process Map, Value Stream Map
Stakeholder Analysis

Identification of the people and groups affected by or able to influence a project, along with their interests, influence, and needed engagement.

Related: Project Charter, RACI Matrix, Change Management
RACI Matrix

A table assigning each task or decision to those responsible, accountable, consulted, and informed, clarifying roles and preventing duplicated or missing ownership.

Related: Stakeholder Analysis, Team Development Stages
Team Development Stages

The typical progression of a team through forming, storming, norming, performing, and adjourning, each calling for different leadership emphasis.

Related: RACI Matrix, Facilitation, Change Management
Facilitation

Guiding a group meeting or workshop so objectives are met, all voices contribute, and the team reaches decisions without the leader dictating content.

Related: Team Development Stages, Brainstorming, Nominal Group Technique
Change Management

The structured activities used to prepare people for a process change, address resistance, build sponsorship, and make new ways of working stick.

Related: Control Plan, Stakeholder Analysis, Standard Work
Y=f(x)

A shorthand stating that an outcome (Y) is a function of one or more process inputs (x), which directs attention to controlling inputs rather than inspecting outputs.

Related: Root Cause Analysis, Design of Experiments, Process Capability
Measurement System Analysis (MSA)

A study that quantifies how much observed variation comes from the measurement system itself, covering repeatability, reproducibility, bias, linearity, and stability.

Related: Gage R&R, Attribute Agreement Analysis, Data Collection Plan
Gage R&R

A repeatability and reproducibility study estimating variation from the measuring device and from operators, usually expressed as a percentage of total or tolerance variation.

Related: Measurement System Analysis (MSA), Attribute Agreement Analysis
Attribute Agreement Analysis

A study of how consistently appraisers make categorical judgments, such as pass/fail or defect type, comparing each appraiser with themselves and with a reference standard.

Related: Measurement System Analysis (MSA), Gage R&R
Data Collection Plan

A document specifying what data to gather, operational definitions, data type, sampling method, sample size, location, timing, and who records it.

Related: Operational Definition, Sampling Plan, Measurement System Analysis (MSA)
Operational Definition

A precise, unambiguous description of how a characteristic is measured or judged, so different people classify the same item the same way.

Related: Data Collection Plan, Attribute Agreement Analysis
Sampling Plan

The rules for selecting which items to measure, including sample size, frequency, and method such as random, stratified, or systematic selection.

Related: Data Collection Plan, Central Limit Theorem
Central Limit Theorem

The principle that sample means tend toward a normal distribution as sample size grows, regardless of the shape of the underlying population distribution.

Related: Sampling Plan, Hypothesis Test, Control Chart
Process Capability

A comparison of process spread and centering against specification limits, summarized by indices such as Cp and Cpk for stable, normally distributed processes.

Related: Specification Limits, Control Chart, Y=f(x)
Specification Limits

The upper and lower bounds on a characteristic set by the customer or design, which are distinct from the control limits calculated from process data.

Related: Process Capability, Control Chart
Control Chart

A time-ordered plot of a process measure with statistically derived limits that separates common-cause variation from signals of special-cause variation.

Related: Common Cause Variation, Special Cause Variation, Specification Limits
Common Cause Variation

The routine, inherent variation produced by the design of a stable process, which is reduced only by changing the system itself.

Related: Special Cause Variation, Control Chart
Special Cause Variation

Irregular variation traceable to an identifiable event, input, or disturbance outside the normal process, signaled by rule violations on a control chart.

Related: Common Cause Variation, Control Chart, Root Cause Analysis
Hypothesis Test

A statistical procedure that weighs sample evidence against a stated null hypothesis, producing a p-value used to decide whether an observed difference is likely real.

Related: p-value, Type I Error, Central Limit Theorem
p-value

The probability of observing data at least as extreme as the sample result if the null hypothesis were true; small values suggest the null is inconsistent with the data.

Related: Hypothesis Test, Type I Error, Type II Error
Type I Error

Concluding that a real difference or effect exists when it does not, often called a false alarm, with probability denoted by alpha.

Related: Type II Error, p-value, Hypothesis Test
Type II Error

Failing to detect a real difference or effect that exists, often called a miss, with probability denoted by beta; its complement is statistical power.

Related: Type I Error, Sample Size
Sample Size

The number of observations needed to detect an effect of practical interest with acceptable risk of Type I and Type II errors.

Related: Type II Error, Sampling Plan
Root Cause Analysis

A set of techniques, such as the five whys, cause-and-effect diagrams, and stratification, used to find the underlying reasons a problem occurs rather than its symptoms.

Related: Fishbone Diagram, Y=f(x), Hypothesis Test
Fishbone Diagram

A cause-and-effect diagram that organizes possible causes of a problem into branches, often people, method, machine, material, measurement, and environment.

Related: Root Cause Analysis, Brainstorming
Brainstorming

A group technique for generating many candidate ideas or causes quickly, deferring judgment so quantity and variety come before evaluation.

Related: Nominal Group Technique, Fishbone Diagram, Facilitation
Nominal Group Technique

A structured group method in which members write ideas silently, share them, then rank or vote, reducing dominance and anchoring effects in idea selection.

Related: Brainstorming, Facilitation
Design of Experiments

A planned set of runs that deliberately varies input factors together so their individual and interacting effects on a response can be estimated efficiently.

Related: Y=f(x), Pilot Study, Root Cause Analysis
Pilot Study

A small-scale trial of a proposed change run under controlled conditions to confirm expected benefits and surface problems before full deployment.

Related: Design of Experiments, Control Plan, Change Management
PDCA Cycle

A repeating loop of plan, do, check, and act that structures iterative testing and adjustment of improvements.

Related: Kaizen, Pilot Study
Poka-Yoke

A mistake-proofing device or design feature that prevents an error from being made or makes an error immediately obvious before it passes downstream.

Related: Standard Work, Control Plan
Standard Work

Documented, current best method for a task, including sequence, timing, and key quality points, forming the baseline against which further improvement is measured.

Related: Control Plan, 5S, Poka-Yoke
Control Plan

A document listing the process steps, measures, monitoring methods, frequencies, response plans, and owners used to keep an improved process in control.

Related: Standard Work, Control Chart, Change Management
Visual Management

Placing performance information, status, and standards where the work happens so deviations are noticed immediately without asking or searching.

Related: 5S, Standard Work, Control Chart
Little's Law

A relationship stating that average work-in-process equals average arrival rate multiplied by average time in the system, used to reason about queues and lead time.

Related: Value Stream Map, Waste (Muda)
Kano Model

A way of classifying customer needs as basic, performance, or delighter, based on how satisfaction responds to the presence or absence of a feature.

Related: Voice of the Customer, Critical to Quality (CTQ)