Fall Hazard, an Unwitnessed Test, and a Future Contract

ABAA Field Auditor · Put your knowledge to work in context.

All case studies

Fall Hazard, an Unwitnessed Test, and a Future Contract

During a routine audit of a 9,000 ft2 retail fit-out, the auditor sees two workers on a rolling scaffold 14 feet above the slab with no guardrail on the open side and no personal fall arrest, while the air barrier crew sprays a solvent-based contact adhesive nearby with containers left open and the only ventilation is one open man door. Later, the project manager asks the auditor to sign page 4 of the field report, which states that a smoke-pencil test of the roof-wall junction was performed and passed, although the auditor was off site that morning and the subcontractor ran the test unsupervised. The PM adds that the owner has two more towers and that the firm which cooperates gets the work, then asks the auditor to recommend the same subcontractor for remedial membrane work.

1. What are the auditor's safety obligations and immediate actions on the scaffold and adhesive exposures?

Read the worked answer

These are imminent hazards, and they take priority over the audit. Fall protection and guardrails are required at this height on a scaffold; the open side must be guarded or the workers removed from the platform. The adhesive creates an inhalation and fire exposure, and open containers with one man door do not constitute adequate ventilation.

Actions: stop work in the immediate area and notify the GC's competent safety person and site superintendent at once, in person and by written notice the same day; move to a safe location rather than continue inspecting beneath the scaffold; and record the observations with time, location, and photographs if it can be done safely. The auditor should not resume work in that area until the hazard is corrected. If no responsible party responds, she stops the audit, leaves the area, and escalates to the program and the owner, because a hazard left in place is a continuing risk to everyone on site.

2. How should the auditor handle the request to sign the smoke-pencil test result?

Read the worked answer

She must refuse. Signing page 4 would attribute to the auditor a verification she did not perform, which is a misrepresentation regardless of whether the test actually passed. Her signature certifies observation, and there was none.

The correct handling is to correct the record: the report should state that the smoke-pencil test at the roof-wall junction was performed by the subcontractor without third-party observation, and that no auditor verification exists. If the test is required by the program, it must be re-run under observation, with instrumentation, baseline, and conditions documented. She should note in the file that the request was made and declined, keep her field notes, and inform her supervisor before the report is issued. If the PM alters the report, she must notify the program in writing and decline to release it under her name.

3. How should the auditor respond to the implied offer of future work and the request to recommend the subcontractor?

Read the worked answer

Decline the recommendation and disclose the solicitation. Recommending the contractor whose work she audits, for paid remedial work, creates both a conflict of interest and an incentive to find or shape defects. Even if her judgment would be unaffected, the appearance undermines every finding in the report and could taint prior reports on the same account.

She should tell the PM plainly that the audit role does not include selecting or recommending remedial contractors, provide the objective list of qualified bidders maintained by the program if one exists, and record the conversation, including the reference to future towers, in a file note distributed to her manager and the program. Any future work with this owner should be reviewed for independence before acceptance. Remedial design or installation by the auditing firm should be out of scope for the same project, and the client should be told this in writing so the boundary is unambiguous.