- Air barrier system
- A continuous assembly of materials and joints that limits unintended air leakage between conditioned and unconditioned spaces under expected pressure differences.
- Stack effect
- Buoyancy-driven pressure difference caused by indoor-outdoor temperature and density differences; it drives air upward in tall buildings and increases with building height.
- Air leakage condensation
- Moisture accumulation caused when air carries water vapor through envelope defects and reaches a surface below dew point; exfiltration wets cavities in cold weather.
- ACH50
- Air changes per hour at a 50 Pa indoor-outdoor pressure difference; calculated from measured airflow in cubic feet per minute times 60 divided by building volume.
- Air permeance
- Airflow rate through a unit area of material at a specified pressure difference, commonly reported in liters per second per square meter at 75 Pa.
- Transition membrane
- Flexible or fluid-applied air barrier component used to bridge joints and material changes, such as wall-to-floor or wall-to-window interfaces, while maintaining continuity.
- Closed-cell spray foam
- Two-component polyurethane insulation that can also serve as an air barrier when installed at sufficient thickness with continuous coverage and compatible substrates.
- Compatibility testing
- Evaluation of whether sealants, tapes, primers, and membranes adhere to substrates and to each other without degradation; manufacturer instructions and mockups guide acceptance.
- ASTM E2178
- Standard test method measuring air permeance of building materials at a specified pressure difference; results support material qualification, not completed assembly performance.
- ASTM E2357
- Standard test method measuring air leakage of air barrier assemblies, including joints and penetrations, under specified pressure differences; it evaluates assembled system performance.
- ASTM E783
- Field test method for measuring air leakage through installed exterior windows, doors, and curtain walls under specified pressure differences; it verifies installed fenestration airtightness.
- ASTM E1186
- Standard practices for detecting air leakage sites in building envelopes using tracer smoke, infrared thermography, or other methods under controlled pressure differences.
- Shingle lap
- Overlap arrangement in which upper membrane courses lap over lower courses so gravity drainage sheds water outward; air barrier laps follow manufacturer direction and pressure equalization needs.
- Sealant tooling
- Shaping and pressing fresh sealant against joint surfaces to improve adhesion and form a concave profile; tooling helps eliminate voids and ensures contact.
- Fastener overdriving
- Excessive driving of mechanical fasteners that compresses or tears membrane, washers, or substrates; it can create air leakage paths and reduce cladding attachment capacity.
- Penetration sealing
- Treatment of pipes, conduits, ducts, and anchors passing through the air barrier using sleeves, sealants, membranes, or gaskets to restore continuity and limit leakage.
- Risk-based sampling
- Audit sampling strategy that prioritizes locations with high leakage consequence, complex geometry, transitions, penetrations, or repair history rather than choosing only convenient areas.
- Chain of custody
- Chronological record tracking test equipment, samples, photographs, and documents from collection through analysis; it supports integrity and defensibility of audit findings.
- Audit scope statement
- Written description defining what buildings, systems, time period, requirements, and exclusions an audit covers; it prevents misunderstandings about auditor responsibility and conclusions.
- Random sample
- Selection method in which each unit has a known chance of selection, reducing auditor bias; sampling frames and random number tools document the process.
- Blower door test
- Pressurization test using a calibrated fan and manometer to measure building airflow at multiple pressure differences; results quantify envelope airtightness and locate leakage.
- Tracer smoke
- Visual diagnostic using smoke released near suspect envelope details under controlled pressure; moving smoke indicates leakage paths and helps identify defect locations.
- Infrared thermography
- Diagnostic imaging of surface temperature differences caused by air leakage, missing insulation, or moisture; interpretation requires suitable temperature difference and pressure conditions.
- Baseline pressure
- Background indoor-outdoor pressure difference measured before fan operation; it is used to correct test pressures and reduce bias from wind or stack effects.
- Nonconformance report
- Document identifying a requirement, observed condition, location, evidence, and severity where work or documentation fails to meet specified criteria; it triggers corrective action.
- Corrective action
- Documented response to a nonconformance that corrects the condition, investigates root cause, prevents recurrence, and provides verification evidence for closure.
- Observation versus finding
- An observation records a condition without concluding noncompliance; a finding states a verified failure against a specific requirement and is supported by evidence.
- Closeout evidence
- Records demonstrating corrective work is complete and effective, such as photographs, material receipts, inspection sign-offs, and retest results; it supports audit closure.
- Conflict of interest
- Situation where financial, personal, or professional interests could improperly influence audit judgments; auditors disclose and manage such situations to preserve impartiality.
- Stop-work authority
- Right to halt an activity when imminent danger or serious noncompliance exists; it is exercised promptly and reported through agreed project channels.
- Fall protection
- System of guards, harnesses, anchors, or nets used when working at heights; it must match the hazard and comply with applicable safety requirements.
- Confidentiality
- Ethical obligation to protect client information from unauthorized disclosure; auditors use information only for authorized audit purposes and follow applicable privacy requirements.