Wastewater Collection Operator Class III flashcards
Wastewater Collection Operator Class III · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Permit-required confined space
- A confined space that contains or may contain a hazard such as a hazardous atmosphere, engulfment, entrapment, or an internal configuration that could trap an entrant, requiring a permit before entry.
- Atmospheric testing order
- Test oxygen first, then combustible gas in percent LEL, then toxic gases such as hydrogen sulfide and carbon monoxide; test before entry and continuously while occupied.
- Acceptable entry oxygen range
- Oxygen between 19.5 and 23.5 percent by volume; below this is oxygen deficient and above it is oxygen enriched, both of which are hazardous.
- Attendant role
- The attendant stays outside the permit space, monitors entrants, maintains communication, keeps unauthorized persons out, and summons rescue without entering alone.
- Hydrogen sulfide properties
- A heavier-than-air, toxic, and flammable gas that deadens the sense of smell at higher concentrations, so odor cannot be relied on as a warning.
- BOD5 definition
- Five-day biochemical oxygen demand measured at 20 degrees Celsius; it estimates biodegradable organic matter consumed by microorganisms in a wastewater sample.
- Infiltration versus inflow
- Infiltration is groundwater entering through pipe and manhole defects, while inflow is direct stormwater entry through connections such as roof drains and sumps.
- Diurnal flow pattern
- Wastewater flow varies through the day, typically lowest in the early morning hours and highest in late morning or early evening, so design uses peak flow.
- Peaking factor
- The ratio of peak flow to average flow used to size collection and treatment facilities; peak hourly flow equals average daily flow times the peaking factor.
- Self-cleaning velocity
- A minimum flow velocity of about two feet per second at design flow that keeps solids moving and prevents deposition in gravity sewers.
- Manning equation
- Q equals 1.486 divided by n, times area, times hydraulic radius to the two-thirds power, times slope to the one-half power, for gravity flow.
- Part-full gravity design
- Gravity sewers are sized to flow partially full, commonly half to three-quarters of diameter, to allow ventilation and carry peak flows.
- Manhole location requirements
- Manholes are placed at changes in pipe size, slope, or alignment, at junctions, and at maximum spacing to allow access for cleaning and inspection.
- PVC SDR rating
- Dimension ratio for PVC pipe; a lower SDR means a thicker wall and higher pressure rating, with SDR 35 and SDR 26 common for gravity sewers.
- Pipe bedding purpose
- Bedding supports the pipe, distributes loads, and prevents deflection and joint separation; proper haunch compaction is essential for flexible pipe.
- Deflection testing
- A mandrel or go/no-go gauge is pulled through flexible pipe to confirm deflection does not exceed the specification limit, commonly five percent.
- Ductile iron pipe
- A strong pressure-rated pipe joined by push-on or mechanical joints, often cement-lined for corrosion protection and used for force mains and deep installations.
- Hydrocleaning sewer
- High-velocity water jetting removes grease, roots, and debris; nozzle type and pressure are matched to pipe size and material to avoid damage.
- Cured-in-place pipe lining
- A resin-impregnated liner is inserted and cured inside the existing pipe to seal defects and restore structural condition without excavation, slightly reducing capacity.
- Sliplining
- A smaller new pipe is pulled through the old pipe and the annular space is grouted; the method reduces capacity but rehabilitates without excavation.
- Root control
- Cutting removes roots at joints and defects, but the defect remains, so root cutting is combined with rehabilitation to prevent recurrence.
- Pump operating point
- The flow and head where the pump curve intersects the system curve; system head includes static lift plus friction and minor losses.
- Force main septicity
- Slow or stagnant flow in a pressurized main can turn septic and generate hydrogen sulfide, causing odor and corrosion; velocity and air release control it.
- Wet well cycling volume
- Adequate storage between pump start and stop levels limits starts per hour and prevents short cycling that damages motors and pumps.
- Check valve function
- A valve that allows flow in one direction only, preventing backflow when a pump stops; failure can cause reverse flow and overflow.
- CCTV pipe inspection
- A camera travels the sewer to record condition; defects are coded by type and severity so pipes can be ranked and prioritized for repair.
- Smoke testing
- Smoke is forced into the sewer to reveal inflow sources such as roof drains, sumps, illegal connections, and broken laterals that admit stormwater.
- Dye testing
- A tracer dye is released at a suspected source to confirm whether it connects to the sanitary sewer, verifying cross-connections and leaks.
- NPDES permit
- A Clean Water Act permit that sets effluent limits and monitoring and reporting requirements for discharges to waters of the United States.
- Sanitary sewer overflow reporting
- An SSO must be reported to the state regulatory agency within timelines set by state rules and the permit, with volume, location, and corrective actions documented.
- Asset management
- A program that tracks each asset's location, condition, maintenance history, and remaining life to plan repair or replacement and justify budgets.
- Life-cycle cost
- The total of capital, operation, maintenance, and replacement costs over an asset's life; the lowest first cost is not always the lowest life-cycle cost.