Wastewater Collection Operator Class III study materials
Wastewater Collection Operator Class III study resources

Wastewater Collection Operator Class III study plan

Wastewater Collection Operator Class III · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Safety and Confined Space Entry & Sewer Maintenance, Cleaning, and Rehabilitation

  • List the four atmospheric hazards of confined space entry and state the acceptable entry limits for each from memory

  • Explain the difference between a permit-required confined space and a non-permit space and classify five collection system structures accordingly

  • Outline the sequence of a permit-required entry: pre-entry meeting, atmospheric testing order, ventilation, attendant duties, and rescue provisions

  • Describe lockout/tagout steps for a lift station pump before entry

  • Identify the top three causes of sewer maintenance injuries and the control for each

Your checkpoint

A one-page confined space entry checklist covering testing order, permit fields, attendant duties, and rescue notification, self-quizzed to 100% accuracy

Week 2

Sewer Maintenance, Cleaning, and Rehabilitation & Safety and Confined Space Entry

  • Match each cleaning method (rodding, jetting, bucket machine, root saw, chemical) to the blockage or condition it best addresses

  • Calculate jetting water volume and nozzle pressure needs for a stated pipe diameter and length

  • Sequence the steps for safe traffic control and work zone setup on a roadway

  • Explain hydrogen sulfide and methane generation in sewers and the monitoring response for each

  • Practice a written emergency response scenario involving a worker overcome in a manhole

Your checkpoint

A written emergency response drill narrative for a manhole rescue, scored against a self-made rubric of at least eight required actions

Week 3

Sewer Maintenance, Cleaning, and Rehabilitation & Inspection, Condition Assessment, and Infiltration/Inflow

  • Compare trenchless rehabilitation methods (CIPP, slip lining, pipe bursting, spot repair) on cost drivers, diameter limits, and service disruption

  • Describe CCTV inspection procedure including camera setup, travel speed, and documentation of defects

  • Apply a standard defect coding scheme to ten written defect descriptions

  • Distinguish structural defects from operational and maintenance defects with examples

  • Explain how smoke testing and dye testing locate inflow sources and state the limits of each

Your checkpoint

Ten written defect scenarios coded and classified as structural or O&M, with a one-sentence justification for each

Week 4

Pump Stations, Lift Stations, and Force Mains & Inspection, Condition Assessment, and Infiltration/Inflow

  • Trace flow through a wet well and pump station and identify the function of each major component

  • Calculate wet well storage volume and pump cycle time from given dimensions and inflow

  • Diagnose common pump problems (cavitation, air binding, clogging, worn impeller) from written symptom lists

  • Explain force main hydraulics including surge and air release valve purpose

  • Describe infiltration and inflow sources by category and rank them by typical flow contribution

Your checkpoint

A closed-book 25-question self-test covering pump station components, pump troubleshooting, and I/I sources, scored and with missed items re-studied

Week 5

Wastewater Sources, Characteristics, and Flow & Collection System Design, Plans, and Specifications

  • Calculate flow from a partial-full pipe using given depth and velocity data

  • Convert between flow units (mgd, cfs, gpm, liters per day) across ten practice problems

  • Interpret a sanitary sewer profile sheet: invert elevations, slope, and cover

  • Explain design criteria for minimum slope, minimum velocity, and depth of cover and why each matters

  • Describe how sources of wastewater (domestic, commercial, industrial) affect strength and flow peaking

Your checkpoint

A worked problem set of ten flow and slope calculations with units shown at every step, all correct on second attempt

Week 6

Pipe Materials, Installation, and Testing & Regulations, Permits, and Reporting

  • Compare pipe materials (PVC, ductile iron, concrete, HDPE) on strength, joint type, and appropriate application

  • Sequence trench excavation, bedding, laying, and backfill steps and state the inspection point at each

  • Explain low-pressure air testing and deflection testing procedures and acceptance criteria

  • Summarize the reporting obligations of a collection system under an NPDES permit and a sanitary sewer overflow rule

  • List the records a spill or overflow requires and the notification timeline

Your checkpoint

A one-page spill/overflow response and reporting flowchart with notification timing and required record fields

Week 7

Records, Asset Management, and Budgeting & Supervision, Training, and Emergency Response

  • Build a simple asset inventory table with condition rating, install year, and remaining life for ten fictional assets

  • Rank five rehabilitation projects using a written prioritization method and justify the ranking

  • Explain how O&M budget lines are built from labor, equipment, and contracted services

  • Draft a 15-minute training outline for new staff on traffic control and confined space awareness

  • Describe the supervisor's role in after-hours callout and mutual aid coordination

Your checkpoint

A ten-row asset inventory with condition ratings and a ranked top-three rehabilitation priority list with written justification

Week 8

Safety and Confined Space Entry & Sewer Maintenance, Cleaning, and Rehabilitation & Pump Stations, Lift Stations, and Force Mains

  • Complete a timed full-length practice exam and score each domain separately

  • Re-study the two lowest-scoring domains using the week 1-7 deliverables

  • Recite the confined space entry sequence and rescue provisions without notes

  • Re-derive the pump cycle time and flow conversion formulas from scratch

  • Write a one-page personal cheat sheet of formulas, limits, and notification timelines

Your checkpoint

A scored full-length practice exam with a domain-by-domain error log and a completed one-page cheat sheet

Milestones

Week 2: Can recite the confined space entry sequence and rescue provisions from memory and pass a 10-item atmospheric limit quiz

Week 4: Scores at least 80% on the pump station and I/I self-test with all missed items re-studied

Week 6: Completes all flow and slope calculations correctly on second attempt and explains air test acceptance criteria without notes

Week 8: Full-length practice exam score at or above 80% overall with no domain below 70%