Wastewater Collection Operator Class III study plan
Wastewater Collection Operator Class III · Give each week a clear focus.
8 weeks · About 7 hours per week
Safety and Confined Space Entry & Sewer Maintenance, Cleaning, and Rehabilitation
List the four atmospheric hazards of confined space entry and state the acceptable entry limits for each from memory
Explain the difference between a permit-required confined space and a non-permit space and classify five collection system structures accordingly
Outline the sequence of a permit-required entry: pre-entry meeting, atmospheric testing order, ventilation, attendant duties, and rescue provisions
Describe lockout/tagout steps for a lift station pump before entry
Identify the top three causes of sewer maintenance injuries and the control for each
Your checkpoint
A one-page confined space entry checklist covering testing order, permit fields, attendant duties, and rescue notification, self-quizzed to 100% accuracy
Sewer Maintenance, Cleaning, and Rehabilitation & Safety and Confined Space Entry
Match each cleaning method (rodding, jetting, bucket machine, root saw, chemical) to the blockage or condition it best addresses
Calculate jetting water volume and nozzle pressure needs for a stated pipe diameter and length
Sequence the steps for safe traffic control and work zone setup on a roadway
Explain hydrogen sulfide and methane generation in sewers and the monitoring response for each
Practice a written emergency response scenario involving a worker overcome in a manhole
Your checkpoint
A written emergency response drill narrative for a manhole rescue, scored against a self-made rubric of at least eight required actions
Sewer Maintenance, Cleaning, and Rehabilitation & Inspection, Condition Assessment, and Infiltration/Inflow
Compare trenchless rehabilitation methods (CIPP, slip lining, pipe bursting, spot repair) on cost drivers, diameter limits, and service disruption
Describe CCTV inspection procedure including camera setup, travel speed, and documentation of defects
Apply a standard defect coding scheme to ten written defect descriptions
Distinguish structural defects from operational and maintenance defects with examples
Explain how smoke testing and dye testing locate inflow sources and state the limits of each
Your checkpoint
Ten written defect scenarios coded and classified as structural or O&M, with a one-sentence justification for each
Pump Stations, Lift Stations, and Force Mains & Inspection, Condition Assessment, and Infiltration/Inflow
Trace flow through a wet well and pump station and identify the function of each major component
Calculate wet well storage volume and pump cycle time from given dimensions and inflow
Diagnose common pump problems (cavitation, air binding, clogging, worn impeller) from written symptom lists
Explain force main hydraulics including surge and air release valve purpose
Describe infiltration and inflow sources by category and rank them by typical flow contribution
Your checkpoint
A closed-book 25-question self-test covering pump station components, pump troubleshooting, and I/I sources, scored and with missed items re-studied
Wastewater Sources, Characteristics, and Flow & Collection System Design, Plans, and Specifications
Calculate flow from a partial-full pipe using given depth and velocity data
Convert between flow units (mgd, cfs, gpm, liters per day) across ten practice problems
Interpret a sanitary sewer profile sheet: invert elevations, slope, and cover
Explain design criteria for minimum slope, minimum velocity, and depth of cover and why each matters
Describe how sources of wastewater (domestic, commercial, industrial) affect strength and flow peaking
Your checkpoint
A worked problem set of ten flow and slope calculations with units shown at every step, all correct on second attempt
Pipe Materials, Installation, and Testing & Regulations, Permits, and Reporting
Compare pipe materials (PVC, ductile iron, concrete, HDPE) on strength, joint type, and appropriate application
Sequence trench excavation, bedding, laying, and backfill steps and state the inspection point at each
Explain low-pressure air testing and deflection testing procedures and acceptance criteria
Summarize the reporting obligations of a collection system under an NPDES permit and a sanitary sewer overflow rule
List the records a spill or overflow requires and the notification timeline
Your checkpoint
A one-page spill/overflow response and reporting flowchart with notification timing and required record fields
Records, Asset Management, and Budgeting & Supervision, Training, and Emergency Response
Build a simple asset inventory table with condition rating, install year, and remaining life for ten fictional assets
Rank five rehabilitation projects using a written prioritization method and justify the ranking
Explain how O&M budget lines are built from labor, equipment, and contracted services
Draft a 15-minute training outline for new staff on traffic control and confined space awareness
Describe the supervisor's role in after-hours callout and mutual aid coordination
Your checkpoint
A ten-row asset inventory with condition ratings and a ranked top-three rehabilitation priority list with written justification
Safety and Confined Space Entry & Sewer Maintenance, Cleaning, and Rehabilitation & Pump Stations, Lift Stations, and Force Mains
Complete a timed full-length practice exam and score each domain separately
Re-study the two lowest-scoring domains using the week 1-7 deliverables
Recite the confined space entry sequence and rescue provisions without notes
Re-derive the pump cycle time and flow conversion formulas from scratch
Write a one-page personal cheat sheet of formulas, limits, and notification timelines
Your checkpoint
A scored full-length practice exam with a domain-by-domain error log and a completed one-page cheat sheet
Milestones
Week 2: Can recite the confined space entry sequence and rescue provisions from memory and pass a 10-item atmospheric limit quiz
Week 4: Scores at least 80% on the pump station and I/I self-test with all missed items re-studied
Week 6: Completes all flow and slope calculations correctly on second attempt and explains air test acceptance criteria without notes
Week 8: Full-length practice exam score at or above 80% overall with no domain below 70%