ABC Wastewater Collection Class IV study plan
ABC Wastewater Collection Class IV · Give each week a clear focus.
8 weeks · About 7 hours per week
Wastewater Collection System Operations and Maintenance
Map Domain 1 into a checklist of O&M subtopics (preventive maintenance, odor/ corrosion control, root control, grease control, cleaning methods) and rate your confidence 1-5 on each
Define and write out the purpose and typical frequency of the four main pipe-cleaning methods (hydraulic flushing, mechanical rodding, bucket machine, jetting) from memory
Explain how flow velocity, pipe slope, and debris type determine which cleaning method and frequency to select
List the routine maintenance tasks for manholes, force mains, and gravity lines and note the failure each task prevents
Your checkpoint
A one-page O&M decision table matching pipe condition/debris type to cleaning method and frequency, with self-ratings
Collection System Components and Infrastructure
Sketch and label the components of a gravity collection system from a single building service to the treatment plant headworks
Compare the design purpose and typical application of vitrified clay, PVC, ductile iron, concrete, and HDPE pipe
Describe the function of manholes, drop manholes, cleanouts, lampholes, and lift station wet wells and where each belongs
Identify common structural defects (cracks, joint offset, infiltration, root intrusion, sags) and the component each affects
Your checkpoint
A labeled system diagram plus a component-to-function glossary of at least 15 terms
Pumping and Lift Stations & Safety and Confined Space Entry
Trace the flow path through a lift station from influent to discharge and identify the role of each component (wet well, pumps, check and isolation valves, controls, force main, vents)
Compare wet well and dry well configurations, submersible vs. self-priming pumps, and constant vs. variable speed control
List the steps to safely place a lift station pump in and out of service, including lockout/tagout and valve sequencing
Explain pump cavitation, air binding, and clogging symptoms and the corrective actions for each
Outline the confined space entry permit process and the roles of entrant, attendant, and entry supervisor
Your checkpoint
A lift station startup/shutdown procedure plus a confined space entry checklist, each written in numbered steps
Inflow and Infiltration Control & Wastewater Flow, Hydraulics, and Capacity Management
Distinguish inflow from infiltration and give at least three sources of each
Describe the methods used to quantify I/I (flow monitoring, smoke testing, dye testing, CCTV, rainfall-derived infiltration analysis)
Calculate flow using the continuity equation (Q = A x V) and Manning's equation for a partially full pipe
Explain how capacity, slope, velocity, and roughness relate, and identify minimum self-cleaning velocity targets
Describe how excessive I/I reduces system capacity and can cause sanitary sewer overflows
Your checkpoint
A worked problem set of at least 8 hydraulic calculations (continuity, Manning's, velocity) with solutions and a written I/I source summary
Inspection, Testing, and Rehabilitation of Collection Systems & Regulations, Permitting, and Environmental Compliance
Describe the purpose and limitations of CCTV inspection, smoke testing, dye testing, air testing, and deflection testing
Explain how to read a CCTV inspection log and classify defects by severity
Compare rehabilitation methods (CIPP, pipe bursting, slip lining, spot repair, chemical grouting) by application and limitation
Summarize the key requirements of the Clean Water Act, NPDES permitting, and SSO reporting obligations
Identify the permit and reporting requirements that apply to collection system operation in your jurisdiction
Your checkpoint
A defect classification reference sheet plus a rehabilitation method comparison table, and a written regulatory summary of at least one page
Recordkeeping, Reporting, and Asset Management & Supervision, Training, and Emergency Response
Design a simple asset register with fields for location, condition, install date, and maintenance history
Explain how condition assessment data feeds into a capital improvement and rehabilitation prioritization plan
Describe the records and reports a collection system operator must maintain and how they support compliance
Outline a training plan for new operators covering safety, equipment, and job-specific skills
List the elements of an emergency response plan for a sanitary sewer overflow, pump failure, and confined space rescue
Your checkpoint
A sample asset register template with at least 10 entries plus a one-page emergency response outline
Wastewater Collection System Operations and Maintenance & Collection System Components and Infrastructure & Pumping and Lift Stations
Re-review all previously missed or low-confidence items from Domains 1-3 and correct your notes
Complete at least 40 practice questions across Domains 1-3 and record your score and missed topics
Re-derive the cleaning method decision logic and the lift station procedure without notes
Identify remaining knowledge gaps and assign each a review action
Your checkpoint
A practice test score log with a written remediation list of specific gaps
Safety and Confined Space Entry & Inflow and Infiltration Control & Wastewater Flow, Hydraulics, and Capacity Management & Inspection, Testing, and Rehabilitation of Collection Systems & Regulations, Permitting, and Environmental Compliance
Complete at least 40 practice questions across the remaining domains and record your score and missed topics
Re-derive the hydraulic calculations and confined space entry checklist without notes
Review the regulatory and reporting summary and confirm accuracy against your jurisdiction's requirements
Finalize a one-page quick-reference sheet of key formulas, limits, and procedures for exam day
Your checkpoint
A final practice test score log plus a completed one-page exam-day quick-reference sheet
Milestones
Week 2: Can label 15+ collection system components and explain each function without notes
Week 4: Can solve continuity and Manning's equation problems correctly and explain I/I sources and impacts
Week 6: Can describe rehabilitation methods, regulatory obligations, and asset management fields from memory
Week 8: Scored 80% or higher on both practice sets and completed the exam-day quick-reference sheet