ICC study materials
ICC study resources

ICC flashcards

ICC · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Criterion-referenced exam
An exam scored against a fixed passing standard rather than against other candidates' results; passing means meeting the minimum competency cut score.
Scaled score
A transformed score placed on a common reporting scale so that forms of different difficulty yield comparable results against the same cut score.
Modified Angoff method
A standard-setting procedure in which subject-matter experts estimate the probability that a minimally competent candidate answers each item correctly; the sum sets the cut score.
Point-biserial discrimination
A statistic measuring how well an item separates high-scoring from low-scoring candidates; low or negative values flag items for review.
Standard error of measurement
A statistic quantifying the uncertainty around an individual's observed score, indicating how much scores would vary across repeated testing.
Exam blueprint
A table of specifications that weights content domains by job-task frequency and criticality; domain weights sum to 100 percent and guide item counts.
Reliability versus validity
Reliability is the consistency of scores across forms and occasions; validity is whether the exam actually measures the intended knowledge and skills.
Concrete cylinder acceptance
Per ACI 318, averages of three consecutive 6x12 inch cylinder tests must equal or exceed f'c, and no single test may fall below f'c minus 500 psi.
Slump test
A field test performed per ASTM C143 that measures the workability and consistency of fresh concrete; it does not directly measure strength.
Air content testing
Fresh concrete air content is measured by the pressure method (ASTM C231) or the volumetric method (ASTM C173) to verify freeze-thaw durability.
Turn-of-nut pretensioning
A high-strength bolting method in which a specified rotation of the nut after snug-tight condition develops the required bolt tension; rotation depends on bolt length and diameter.
AWS D1.1
The structural welding code for steel, governing welder qualification, procedure qualification, and weld acceptance criteria for structural steel fabrication and erection.
Relative compaction
Field dry density divided by the laboratory maximum dry density, expressed as a percentage, used to verify soil compaction against specification.
Liquid penetrant testing
A nondestructive method that reveals surface-breaking defects in nonporous materials by applying a penetrant and developer to draw it out.
Spill bucket test
A test verifying that the spill containment bucket at a UST fill point is liquid-tight and free of liquid and debris.
Overfill prevention
A device such as a ball-float valve or drop tube that stops product flow at approximately 90 percent of tank capacity to prevent overfilling.
Interstitial monitoring
A release detection method that monitors the space between the primary and secondary walls of a double-walled tank or piping system.
Cathodic protection potential
A structure-to-soil potential of at least -850 mV measured with respect to a copper-copper sulfate reference electrode indicates adequate protection for steel.
40 CFR Part 280
The federal UST regulation covering release detection, spill and overfill prevention, corrosion protection, and closure; state programs may be more stringent.
AST dike capacity
Secondary containment volume typically sized to hold 110 percent of the largest tank's capacity plus displacement from other tanks in the containment area.
Concrete volume in cubic yards
Multiply length times width times depth in feet, then divide by 27 to convert cubic feet to cubic yards.
Ohm's law
The relationship E = I x R, where voltage equals current times resistance; power in a resistive circuit equals I squared times R.
OSHA fall protection trigger
Fall protection for general construction is required at 6 feet, for scaffolds at 10 feet, and for ladders at 24 feet.
Roof pitch
Rise over run expressed as inches of rise per 12 inches of horizontal run; a 4/12 pitch rises 4 inches per foot.
Critical path method
A scheduling technique identifying the longest sequence of dependent activities; delay on the critical path delays project completion.
Retainage
A percentage, commonly 5 to 10 percent, withheld from progress payments until substantial completion to protect the owner.
Combination designation
A credential certifying the holder across multiple disciplines, with each discipline's exam and continuing education tracked separately.
More restrictive provision
The rule applied when disciplines conflict: the more stringent code requirement governs unless the authority having jurisdiction rules otherwise.
Authority having jurisdiction
The governmental body or official responsible for enforcing code and approving permits and inspections; it determines precedence in cross-discipline conflicts.
Special inspections trigger
Special inspections are typically required when the structural engineer of record issues a statement of special inspections identifying the required inspections.
Continuing education allocation
Combined credential holders must satisfy each discipline's minimum continuing education hours; hours are tracked per discipline for audit.
Integrated scenario item
A combined-exam question type requiring the candidate to apply multiple disciplines to one project condition and identify the governing code.