Concepts you must understand
- Code and permit process: when a permit is required, who may perform work, inspection sequencing, and who has authority to approve changes.
- Calculations: material quantities, load and sizing calculations, conduit fill and box fill, voltage drop, concrete volume, and pitch/slope - always confirm the unit and round as the code or question directs.
- Safety obligations: employer responsibility for hazard assessment, PPE, and fall/electrical/excavation protections; the controlling employer concept on multi-employer sites.
- Business and legal: contract essentials, change orders in writing, lien deadlines, licensing scope, and insurance/bonding.
Traps
- Unit mismatch - the stem gives inches and the options are in feet, or vice versa.
- "Who is responsible" - the answer is usually the employer or the party contractually obligated, not the individual worker.
- Verbal change orders - the exam answer almost always requires written authorization.
- Over-precise distractors - an answer with suspicious precision often hides a unit or formula error.
Rule of thumb
Write the formula, substitute units explicitly, and sanity-check magnitude before choosing. If two answers differ by a factor of 12, suspect a unit conversion.
Worked example: A slab measures 10 ft × 12 ft × 4 in. Convert thickness to feet (4 in ÷ 12 = 0.333 ft), then multiply: 10 × 12 × 0.333 ≈ 40 cubic feet. Divide by 27 for cubic yards ≈ 1.48, so order about 1.5 cubic yards plus waste.