ACCA Residential HVAC Design study materials
ACCA Residential HVAC Design study resources

ACCA Residential HVAC Design study plan

ACCA Residential HVAC Design · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Residential HVAC System Design (Manual J, S, and D) & Quality Installation and Quality Standards

  • Compute a full block load by hand for a sample 2,000 sq ft house using Manual J procedures (fenestration, envelope, infiltration, internal gains)

  • Differentiate sensible vs latent loads and explain how each drives equipment selection

  • List the required inputs for an accurate Manual J takeoff and identify which are commonly omitted in the field

  • Map the Manual J → Manual S → Manual D workflow and state the output of each step

Your checkpoint

Completed hand-calculated Manual J load worksheet for a sample house with total, sensible, and latent loads labeled

Week 2

Residential HVAC System Design (Manual J, S, and D) & Quality Installation and Quality Standards

  • Select equipment using Manual S capacity checks at design and part-load conditions

  • Size and lay out a duct system per Manual D using available static pressure and friction rate

  • Verify room-by-room airflow against register and grille selection

  • Identify the top quality-installation failure points in duct design and equipment sizing

Your checkpoint

One-page Manual S and Manual D summary: selected equipment, total external static pressure, and room airflow table

Week 3

Quality Installation and Quality Standards & Refrigerant Handling and Safety

  • Describe commissioning steps for airflow, charge, and combustion/ventilation verification

  • Explain evacuation, dehydration, and pressure-testing procedures before charging

  • Identify refrigerant safety classifications, cylinder handling, and PPE requirements

  • Distinguish recovery, recycling, and reclaim and when each applies

Your checkpoint

Commissioning and refrigerant-handling checklist with at least 20 sequenced steps and pass/fail criteria

Week 4

Refrigerant Handling and Safety & HVAC Business Operations and Code Compliance

  • Compute superheat and subcooling and interpret readings against target values

  • Apply leak-detection and repair requirements, including evacuation levels after repair

  • Summarize refrigerant recordkeeping and disposal obligations for a small contractor

  • Outline permit, inspection, and code-compliance steps for a residential changeout

Your checkpoint

Worked refrigerant diagnostic set (three scenarios) plus a one-page compliance and recordkeeping summary

Week 5

HVAC Business Operations and Code Compliance & Residential HVAC System Design (Manual J, S, and D)

  • Build a job-cost model covering labor, materials, overhead, and profit margin for a residential install

  • Draft a scope-of-work and change-order template tied to design documents

  • Explain how design documentation supports warranty and liability protection

  • Identify code sections most often cited on residential HVAC inspections

Your checkpoint

Sample job estimate with line-item costs, margin calculation, and a matching scope-of-work template

Week 6

Quality Installation and Quality Standards & HVAC Business Operations and Code Compliance

  • Design a QA/QC inspection form covering installation, commissioning, and documentation

  • Explain the roles of permits, third-party verification, and warranty registration

  • Analyze a case where poor installation caused a callback and propose corrective controls

  • Describe how to document design assumptions for code officials and clients

Your checkpoint

Completed QA/QC inspection form applied to a hypothetical install, with deficiency list and corrective actions

Week 7

Residential HVAC System Design (Manual J, S, and D) & Refrigerant Handling and Safety & HVAC Business Operations and Code Compliance

  • Integrate load, equipment selection, duct design, and refrigerant charge into one end-to-end project narrative

  • Calculate refrigerant quantity, leak-check thresholds, and evacuation targets for that project

  • Prepare a compliance packet: permits, design docs, commissioning records, refrigerant log

  • Identify business risks (liability, scope creep, code changes) and mitigations

Your checkpoint

Integrated project packet combining design, commissioning, refrigerant, and compliance documents

Week 8

Residential HVAC System Design (Manual J, S, and D) & Quality Installation and Quality Standards & Refrigerant Handling and Safety & HVAC Business Operations and Code Compliance

  • Complete timed practice sets weighted 25% per domain and review every missed item

  • Re-derive key formulas (load, static pressure, superheat/subcooling) from memory

  • Recite code and refrigerant compliance checklists without notes

  • Build a personal weak-area log and final review sheet

Your checkpoint

Scored practice exam with error analysis and a one-page final review sheet covering all four domains

Milestones

Week 2: Can complete a Manual J load calculation and a Manual S/D selection for a sample house without reference notes

Week 4: Scores at least 80% on a 25-question mixed set covering refrigerant handling and code compliance

Week 6: Produces a complete QA/QC inspection form and correctly identifies at least 8 of 10 common installation deficiencies

Week 8: Scores at least 80% overall on a full-length timed practice exam with no domain below 70%