Two Batches, One Bad Thermometer

ACF CC · Put your knowledge to work in context.

All case studies

Two Batches, One Bad Thermometer

Northgate Catering is producing a 220-guest banquet. At 1:00 p.m. the first 20 qt of beef stew comes off the kettle at 196°F and goes straight into the blast chiller. The remaining 20 qt is panned at 1:25 p.m. into four 5-qt shallow pans and rolled into the 38°F walk-in. At 3:00 p.m. the walk-in batch reads 78°F on the kitchen's dial probe. That probe, checked afterward in an ice-water slurry, reads 40°F instead of 32°F. The blast-chilled batch reads 44°F. The chef wants both batches served at tomorrow's 6:00 p.m. dinner, has no more blast-chiller capacity, and is already short one prep cook.

1. Using a two-stage cooling standard (135°F to 70°F within 2 hours; 70°F to 41°F within 4 more hours), determine the true status of each batch at 3:00 p.m. and state what you would do with each.

Read the worked answer

The dial probe reads 8°F high (40 − 32), so every reading from it must be corrected downward by 8°F.

  • Walk-in batch: 78 − 8 = 70°F at the two-hour mark. The standard requires 70°F or below within 2 hours, so this is exactly at the limit, not a comfortable pass. The batch has spent its entire first stage and has no margin left.
  • Blast-chilled batch: 44 − 8 = 36°F at roughly two hours. It passes both stages and is already below 41°F.

Action: cover, date, and label the blast batch for cold hold. The walk-in batch must now be driven from 70°F to 41°F within four hours - ice bath or agitated chill, pans no deeper than 2 inches, probed every 30 minutes and logged. If it is not at 41°F by 7:00 p.m., reheat to 165°F and recool once, or discard. Do not serve it on the assumption that the probe error was small.

2. The probe error is confirmed. What corrective and preventive actions do you take before tomorrow's service, and how do you document the deviation?

Read the worked answer

Corrective action now: tag the dial probe out of service, replace or recalibrate it against a certified reference, and record the ice-point result on the calibration log.

Records: pull every temperature log since the last documented calibration and correct those readings by 8°F. Any entry that was signed off as compliant and would now fail must be flagged - including cooling, receiving, and hot-hold checks. The 78°F reading is a deviation, so it needs a written corrective action (accelerated chill, verification reading, disposition), who did it, and when.

Prevention: an ice-point check on every shift's opening checklist, one calibrated backup thermometer per department, and a short retraining on correction factors and on never signing a log from an unverified instrument. Tomorrow's service does not run on the dial probe.

3. The stew must now be reheated for the 6:00 p.m. dinner. State the reheat and hold parameters and identify the risk created by re-chilling this product.

Read the worked answer

Reheat to 165°F within 2 hours, stirred in a steam kettle or over a water bath - not in a hotel pan on a warm hold line, where it will sit in the danger zone for hours. Hold at 135°F or above, probe every 30 minutes with the calibrated thermometer, and replenish the serving pan from the hot batch rather than topping up a partially cold pan.

The re-chill risk: this product has already completed one full cooling cycle and one reheat. A second reheat-and-chill repeats the time it spends in the danger zone, degrades the texture, and stacks the odds that the next cooling fails. So reheat only the volume service will actually use, hold any remainder no more than 24 hours, and discard rather than put it through a third cycle. The cooling schedule should be built around what the blast chiller can actually take, not around kettle timing.