ACI Flatwork Technician · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Slump test
ASTM C143 test measuring concrete workability by the vertical drop of a cone of concrete; typical flatwork slump is 4-6 inches (100-150 mm).
Water-cement ratio
Ratio of water weight to cement weight in a mix; typical flatwork ratio is 0.45-0.55; lower ratios increase strength and durability but reduce workability.
Air entrainment
Intentional addition of air bubbles to concrete to improve freeze-thaw durability; recommended air content is 5-7% for 3/4-inch aggregate.
Curing duration
Minimum time concrete must stay moist and above 50°F (10°C) to achieve strength; typically 7 days for normal cement, 3 days for high-early strength.
Contraction joint spacing
Joints cut to control random cracking; spacing should be 24-36 times slab thickness (e.g., 10-12 ft for a 4-inch slab).
Isolation joint
A joint that separates flatwork from structures like walls or columns, allowing independent movement and preventing cracking at connections.
Concrete yield
Volume of concrete produced per batch; 1 cubic yard covers 81 ft² at 4 inches thick, 65 ft² at 5 inches, 54 ft² at 6 inches.
Subgrade compaction
Preparation of soil beneath a slab; compact to 95% Standard Proctor density and proof-roll to ensure uniform support and prevent settlement.
Bleed water
Water that rises to the concrete surface after placement due to settlement of solids; must disappear before finishing to avoid weak, dusty surfaces.
Bull float
A long-handled tool with a flat blade used immediately after screeding to smooth the surface, embed aggregate, and remove high spots.
Troweling
Finishing operation using a steel trowel to produce a dense, smooth surface; performed after bleed water disappears, with increasing blade pressure and angle.
Broom finish
Textured surface created by dragging a broom across concrete; provides slip resistance; use fine broom indoors, coarse outdoors.
Edging
Rounding the edges of a slab with an edger tool to reduce chipping; typical radius is 1/4 to 1/2 inch.
Jointing tool
Tool used to cut contraction joints in plastic concrete to a depth of about 1/4 of slab thickness, controlling where cracks occur.
Hot weather concreting
Practices to prevent rapid moisture loss and early setting: use retarders, cool ingredients, place at night, and cure immediately.
Cold weather concreting
Protecting concrete from freezing for at least 24 hours; use accelerators, heated water, and insulating blankets; avoid calcium chloride in air-entrained concrete.
Screeding
Leveling freshly placed concrete to the desired grade using a straightedge or screed board; first step in finishing.
Float finish
Surface texture produced by a float (wood or magnesium) that leaves a slightly rough, nonslip surface; often used for exterior slabs.
Stamped concrete
Decorative finish where patterns are imprinted into plastic concrete using stamps; timing is critical-concrete must be firm enough to hold the imprint.
Exposed aggregate
Finish where surface mortar is removed to reveal aggregate; achieved by applying a retarder and washing the surface at the right time.
Polished concrete
Surface refined by mechanical grinding with diamond abrasives and chemical densifiers to achieve a glossy, durable finish.
Self-consolidating concrete
Highly flowable concrete that spreads under its own weight without vibration; requires high slump flow (24-30 inches) and tight formwork.
Shrinkage-compensating concrete
Concrete that expands slightly during curing to offset drying shrinkage, reducing cracking in large flatwork; requires special curing and expansion joints.
Densifier
Chemical applied to concrete during polishing to harden the surface and reduce porosity; typically a lithium or sodium silicate solution.
Release agent
Powder or liquid applied to stamps or forms to prevent sticking; also used in stamped concrete to prevent stamps from adhering to concrete.
Flexural strength test
ASTM C78 test measuring concrete's resistance to bending; important for slab design and often specified for pavements.
Compressive strength test
ASTM C39 test on cylindrical specimens to determine concrete strength; typically 28-day strength is specified.
Air content test
ASTM C231 pressure meter test to verify air content in fresh concrete; critical for freeze-thaw durability.
Joint layout
Plan for contraction and isolation joints to control cracking; keep panels square and avoid re-entrant corners.
Overlay
A layer of concrete or other material placed over existing concrete to restore or improve surface; requires proper surface preparation and bonding.
Curing compound
Liquid applied to fresh concrete to form a membrane that prevents moisture loss; must comply with ASTM C309.
Proof-rolling
Compaction test where a heavy roller is passed over subgrade to identify soft spots; part of subgrade preparation for flatwork.