ACI Flatwork Technician · Give each week a clear focus.
8 weeks · About 6 hours per week
Concrete Flatwork Associate
Define the roles and responsibilities of the Flatwork Associate on a placement crew
Identify the components and purpose of subgrade, base, and vapor barrier in flatwork preparation
Explain how water-to-cementitious ratio affects workability, strength, and finishability
Describe proper form setting, grading, and screed guide layout for a slab
Your checkpoint
A one-page glossary of 25 flatwork terms plus a hand-drawn cross-section labeling subgrade, base, vapor barrier, reinforcement, and slab
Concrete Flatwork Associate
Sequence the steps of placing, consolidating, and strike-off for a flat slab
Distinguish when to use a bull float, darby, and fresno based on surface bleed water
Calculate concrete volume for rectangular and irregular flatwork sections
List the causes and prevention of plastic shrinkage cracking
Your checkpoint
Ten solved volume/coverage calculations with a written step-by-step finishing sequence for a 20x30 ft slab
Concrete Flatwork Associate & Concrete Flatwork Finisher
Summarize curing methods and required curing durations for flatwork
Explain joint types, spacing rules, and timing for saw-cut control joints
Identify edge forming and tooling requirements for joints and borders
Describe hot- and cold-weather placement precautions at a foundational level
Your checkpoint
A joint layout sketch for a driveway and patio showing control, isolation, and construction joints with spacing rationale
Concrete Flatwork Finisher
Demonstrate the correct technique and timing for floating and troweling operations
Differentiate hand finishing from machine finishing and select the right tool for each stage
Explain how to apply and finish broom, swirl, and exposed-aggregate textures
Diagnose common surface defects and prescribe corrective finishing actions
Your checkpoint
A finishing-stage decision table mapping bleed-water condition to tool, action, and expected surface result
Concrete Flatwork Finisher
Interpret mix design and slump test results to judge finishability on site
Describe field testing procedures for slump, air content, and temperature
Explain the effects of admixtures on set time and finishing windows
Outline proper sampling and cylinder handling for acceptance testing
Your checkpoint
A completed mock field-test log for three placements with pass/fail judgments and written justification for each
Concrete Flatwork Advanced Finisher
Analyze causes of curling, delamination, and scaling and propose preventive measures
Evaluate finishing schedules for large placements requiring multiple crews and equipment
Explain how ambient conditions, wind, and humidity drive evaporation-rate decisions
Compare decorative and specialty finish systems for durability and maintenance
Your checkpoint
A written case analysis of a failed slab (curling plus delamination) with a root-cause chain and a revised finishing plan
Concrete Flatwork Advanced Finisher
Develop a quality-control checklist covering pre-placement, placement, finishing, and curing
Plan crew roles, equipment staging, and communication for a multi-crew flatwork pour
Apply safety practices for finishing equipment, chemical exposure, and silica dust
Resolve a scheduling conflict between joint sawing, curing, and traffic opening
Your checkpoint
A full QC and safety checklist plus a one-page pour-day plan assigning crew roles and timing for a large commercial slab
Concrete Flatwork Associate & Concrete Flatwork Finisher & Concrete Flatwork Advanced Finisher
Synthesize all three domains into an integrated troubleshooting framework
Answer timed practice questions across all domains and identify weak areas
Re-teach the five weakest concepts in writing without notes
Finalize a personal exam-day strategy and reference sheet
Your checkpoint
A timed 60-question self-assessment scored by domain, plus a one-page personal weak-area remediation summary
Milestones
Week 2: Score at least 80% on a self-made 20-question quiz covering Domain 1 fundamentals and volume calculations
Week 4: Explain the full finishing sequence from strike-off to final texture aloud in under five minutes without notes
Week 6: Correctly diagnose at least four of five presented defect scenarios with both cause and remedy
Week 8: Achieve at least 85% overall on the timed 60-question assessment with no single domain below 75%