ACI MFTT study materials
ACI MFTT study resources

ACI MFTT study plan

ACI MFTT · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Masonry materials, units, mortar, and grout sampling

  • Classify ASTM C270 mortar Types M, S, N, O, and K by their cementitious-to-aggregate proportion limits and state the structural or environmental service condition each type suits.

  • Distinguish the ASTM C90, C216, C652, and C140 unit categories and list the physical property tests each referencing standard mandates.

  • Build a unit sampling plan under ASTM C140 and C67, stating lot size, number of units drawn, and how each specimen is identified and transported without damage.

  • Explain how aggregate moisture, batching method, and mixing water quantity shift field mortar consistency and water content, and predict the direction of each shift.

Your checkpoint

A two-page reference sheet pairing mortar type to proportion limits and service use, plus a completed mock sample-collection form for a 5,000-unit lot showing lot definition, sample size, and identification scheme.

Week 2

Masonry materials, units, mortar, and grout sampling & Field testing of masonry mortar and grout (consistency, water content, compressive strength specimens)

  • Perform the ASTM C1437 flow table procedure on a mortar batch, recording the 25-drop sequence, five spread readings, and computed flow percentage to the nearest whole percent.

  • Determine mortar water content from batch weights and flow calibration data following the ASTM C780 procedure, and show the arithmetic for converting measured flow to reported water content.

  • Sample freshly mixed mortar from both the mixer and the mortar board per ASTM C780, documenting elapsed time between sampling and test so results remain valid.

  • Measure mortar consistency by cone penetration and explain when penetration results are preferred over flow results in the field.

Your checkpoint

A timed dry run of flow and consistency determinations on a laboratory mortar batch, captured on a data sheet with five individual flow readings, computed flow percentage, water content calculation, and elapsed-time entries.

Week 3

Field testing of masonry mortar and grout (consistency, water content, compressive strength specimens)

  • Mold field mortar specimens in 2-inch cube molds, executing the two-layer rodding sequence and strike-off so each cube is square and free of voids.

  • Cure molded specimens under the specified moist conditions and set the stripping and test dates from the standard cure age.

  • Prepare grout specimens per ASTM C1019, including mold selection, filling, consolidation, and curing, and record consistency at the time of sampling.

  • Set up a compression testing machine for masonry specimens, verifying platen alignment, spherically seated block contact, and a loading rate within the required range.

Your checkpoint

A specimen preparation and tracking log covering six mortar cubes and three grout specimens, with mold identification, sampling time, cure start date, planned test date, and a signed capping checklist.

Week 4

Masonry prism construction, curing, and compressive strength testing

  • Construct masonry prisms with the specified unit and mortar, controlling bed joint thickness, full bedding, and head joint fill so each prism meets the ASTM C1314 geometry requirements.

  • Apply the specified prism storage and curing regime, recording temperature, moisture condition, and elapsed days before capping and testing.

  • Cap prism bearing surfaces so each face is parallel and perpendicular to the axis of loading within the tolerance, and measure each prism to the nearest 0.01 inch.

  • Compute prism compressive strength and apply the height-to-thickness correction factor, showing the uncorrected strength, the factor selected, and the corrected result.

Your checkpoint

A documented three-prism set with a construction and curing record plus a complete strength calculation worksheet that shows gross area, measured load, uncorrected strength, height-to-thickness ratio, and corrected compressive strength.

Week 5

Masonry prism construction, curing, and compressive strength testing & Unit compressive strength and absorption/saturation testing

  • Conduct prism compression tests at the required loading rate, describe the failure mode of each specimen, and flag results for outliers or joint-related failures.

  • Test masonry units in compression under ASTM C140, including capping or grinding of bearing faces, alignment on the testing machine, and net-area computation.

  • Calculate net and gross compressive strength for hollow units, showing how the net area is derived from the unit geometry.

  • Interpret prism and unit strength results together and state whether the tested assembly is consistent with the specified masonry compressive strength.

Your checkpoint

A calculation packet containing the corrected prism strength summary and a unit compressive strength worksheet with measured dimensions, net area, gross area, applied load, and both net and gross strengths.

Week 6

Unit compressive strength and absorption/saturation testing

  • Run the 24-hour cold water absorption procedure on masonry units, controlling submersion time, water temperature, and the weighing sequence to the required precision.

  • Run the 5-hour boiling absorption procedure and compute the saturation coefficient as the ratio of 24-hour to boiling absorption.

  • Compute oven-dry density, moisture content, and void ratio from the measured masses, and compare each value against the applicable ASTM C90 or C216 limit.

  • Condition and handle absorption specimens through oven drying, cooling, and reweighing, documenting each transfer so mass changes can be traced to the correct step.

Your checkpoint

A completed absorption test worksheet for five units showing saturated, boiled, and oven-dry masses, 24-hour absorption percentage, boiling absorption percentage, saturation coefficient, and a pass or fail determination against stated limits.

Week 7

Test records, reporting, and qualification of test personnel & Field testing of masonry mortar and grout (consistency, water content, compressive strength specimens) & Masonry prism construction, curing, and compressive strength testing

  • Assemble a field test report containing the project and sample identification, test methods used, specimen ages, environmental conditions, results, and the technician's signature and certification number.

  • Write a specimen tracking and chain-of-custody record that follows each sample from collection through reported result, including any transfer of custody.

  • State the personnel qualification and laboratory accreditation requirements that govern masonry field testing, including technician certification and agency accreditation.

  • Identify the reporting errors that invalidate a test result and describe the correction or re-test path for each one.

Your checkpoint

A complete mock field test report covering one mortar, one grout, and one prism test, with a companion tracking log that traces all specimens from sampling to reported value.

Week 8

Masonry materials, units, mortar, and grout sampling & Field testing of masonry mortar and grout (consistency, water content, compressive strength specimens) & Masonry prism construction, curing, and compressive strength testing & Unit compressive strength and absorption/saturation testing & Test records, reporting, and qualification of test personnel

  • Complete two timed 50-question practice sets spanning all five domains and score at least 80 percent on each.

  • Review every missed item, write the underlying fact or procedure into an error log, and re-state the correct method in your own words.

  • Re-demonstrate the three highest-risk procedures from memory: flow determination, prism height-to-thickness correction, and saturation coefficient calculation.

  • Diagnose remaining weak domains from practice scores and schedule targeted review hours before the exam date.

Your checkpoint

Two scored practice sets at or above 80 percent plus a one-page error log listing each missed item, the corrected fact, and the domain it belongs to.

Milestones

Week 2: Perform a flow test and a water content determination end to end without notes, and explain out loud why each reading is recorded where it is.

Week 4: Produce a corrected prism compressive strength from raw measurements, including the height-to-thickness factor selection, with no reference material open.

Week 6: Compute a saturation coefficient from three raw masses and correctly state pass or fail against the applicable unit standard limit.

Week 8: Score 80 percent or higher on two timed mixed-domain practice sets and show an error log whose entries trace to all five domains.