- Hole cleaning sequence
- Blow dust from the hole, brush the full depth with the specified brush, then blow again; repeat as the manufacturer requires. Incomplete cleaning is a leading cause of adhesive anchor failure.
- Drill bit verification
- Confirm the bit diameter and type match the anchor system's published requirements. Worn, oversize, or wrong-type bits alter hole geometry and invalidate the anchor's tested capacity.
- Embedment depth check
- Measure the hole or installed anchor to confirm effective embedment meets the specified value. Shallow embedment reduces capacity and may violate the manufacturer's listed installation conditions.
- Adhesive gel time
- The working time after mixing during which the anchor may be inserted and adjusted. It shortens as base material temperature rises, so field temperature must be checked before installation.
- Adhesive cure time
- The period after insertion before the anchor may be torqued or loaded. Cure time depends on base material temperature and must follow the manufacturer's published table.
- Cartridge temperature limit
- Adhesive cartridges must be conditioned within the manufacturer's stated temperature range before use. Cold or overheated adhesive may not mix or cure properly.
- Torque verification
- Apply the manufacturer's specified installation torque with a calibrated torque wrench. Record the value; over-torque can fracture the anchor or damage concrete near edges.
- Edge distance check
- Compare measured edge distance to the published table for the specific anchor, diameter, and embedment. Reduced edge distance lowers capacity and requires engineering approval.
- Anchor spacing check
- Verify center-to-center spacing meets the manufacturer's published minimum for the anchor and embedment. Closer spacing causes overlapping stress cones and reduced group capacity.
- Cracked concrete rating
- Anchors in cracked or potentially cracked concrete must be qualified for that condition. Using an uncracked-concrete-only anchor in a cracked section is a nonconformance.
- Adhesive lot and expiration
- Record the adhesive lot number and verify it is within shelf life. Expired or improperly stored adhesive may not cure to the published strength.
- Base material temperature
- Measure concrete temperature near the hole, not just air temperature. It governs gel time, cure time, and the permissible installation window for adhesive anchors.
- Hole condition before setting
- The hole must be dry, free of debris, and at the specified diameter and depth. Standing water, dust, or an oversized hole are reject conditions for most adhesive systems.
- Installation record contents
- Log anchor type and size, location, drill bit, hole depth, cleaning method, adhesive lot, temperatures, installation and cure times, torque, and inspector identity for traceability.
- Concrete compressive strength
- Anchor capacities are published for a minimum concrete strength. Verify strength from cylinder breaks or design documents; lower strength may require reduced capacity or a different anchor.
- Cracked versus uncracked section
- Determine whether the concrete at the anchor location is cracked or may crack in service. This classification selects which anchor listing and capacity table applies.
- Rebar scanning before drilling
- Use GPR or a rebar scanner to locate reinforcement and post-tensioning before drilling. Hitting a tendon or rebar damages structure and creates a reject condition.
- Anchor identification check
- Confirm the installed anchor matches the approved submittal by model, diameter, length, and markings. Substitutions without approval are nonconforming work.
- Go/no-go hole gauge
- A gauge or caliper confirms hole diameter is within tolerance. Oversized holes reduce mechanical interlock and adhesive bond, so they are rejected rather than patched.
- Mechanical anchor set confirmation
- Verify setting by the manufacturer's method, such as reaching the specified torque or a visible setting indicator. An anchor that spins or will not hold torque has failed to set.
- Effective embedment
- The depth over which the anchor transfers load into concrete. It must meet or exceed the specified value and is verified by the setting tool or direct measurement.
- Surface preparation
- Concrete must be sound and free of laitance, coatings, oil, and standing water before installation. Contaminants interfere with anchor seating and adhesive bonding.
- Approved submittal review
- Compare field installation against the approved submittal, manufacturer's instructions, and specifications. Any deviation is documented and resolved before acceptance.
- Special inspection report
- The inspector documents anchor locations, installation parameters, test results, and deviations. It is the record used for acceptance and for resolving later questions.
- Tension versus shear loading
- The anchor's published capacity differs for tension, shear, and combined loading. Verify the installed anchor is qualified for the load direction shown on the design.
- Seismic qualification
- Anchors in seismic-force-resisting or seismic-relevant applications must be qualified for seismic loading. Verify the product listing covers the seismic category specified.
- Lightweight concrete effects
- Lightweight or low-density concrete can reduce anchor capacity relative to normal-weight concrete. Verify the published data applies, or obtain engineering direction.
- Hollow or thin slab condition
- Anchors in thin slabs or hollow-core sections may require through-bolts or special systems. Confirm the anchor type suits the actual slab condition and thickness.
- Proof load testing
- When specified, apply the required proof load to a sample of installed anchors and record deflection. Failed anchors trigger investigation of the installation method.
- Drill stop and depth mark
- Set the drill depth stop or mark the bit to the specified hole depth. Consistent depth control prevents shallow embedment and bottoming of adhesive capsules.
- Concrete age at installation
- New concrete may not have reached design strength when anchors are installed. Verify age and strength criteria from the specification before proceeding.
- Nonconformance documentation
- Record any deviation, such as wrong anchor, shallow embedment, or poor cleaning, with location and corrective action. Undocumented deviations cannot be resolved at closeout.