ACI Dry-Mix Nozzleman study materials
ACI Dry-Mix Nozzleman study resources

ACI Dry-Mix Nozzleman cheat sheet

ACI Dry-Mix Nozzleman · Keep the key ideas within reach.

Quick reference

Materials, Mixture Proportioning, and Dry-Mix Process Fundamentals

  • Dry-mix shotcrete: cementitious binder, aggregate, and additives are pre-blended dry; water is added at the nozzle.

  • Water-cementitious materials ratio (w/cm) controls strength and durability; typical nozzle w/cm is 0.35–0.45.

  • Aggregate gradation per ASTM C33; for dry-mix, coarse aggregate maximum size typically 3/8 in. (9.5 mm) or 1/2 in. (12.7 mm).

  • Cement content typically 600–800 lb/yd³ (356–475 kg/m³) for dry-mix; higher for overhead or wet areas.

  • Silica fume addition (5–12% by mass of cement) improves cohesion, reduces rebound, and increases strength.

  • Accelerators (chloride-free) reduce set time; dosage per manufacturer, typically 1–4% by mass of cement.

  • Fibers (steel, synthetic) improve toughness and crack resistance; dosage per project specification (e.g., 30–100 lb/yd³).

  • Pre-bagged dry-mix must be protected from moisture; use within shelf life and discard caked material.

  • Rebound increases with larger aggregate, higher air pressure, and greater nozzle-to-surface distance.

Quick reference

Equipment: Dry-Mix Gun, Hose, Nozzle, and Air/Water Controls

  • Dry-mix gun: rotor/stator or pneumatic feed; maintain consistent feed rate to avoid pulsation.

  • Air pressure at the gun typically 60–100 psi (4–7 bar); adjust for hose length, elevation, and material.

  • Hose diameter typically 1.25–2 in. (32–50 mm); keep hose as straight as possible; avoid kinks and sharp bends.

  • Nozzle: water ring introduces water; check for even water distribution and worn water ring.

  • Water pressure should exceed air pressure at the nozzle by about 10–20 psi to ensure proper mixing.

  • Air compressor must supply sufficient cfm (typically 100–300 cfm) and be equipped with water trap.

  • Pre-shift inspection: check hose for wear, couplings, nozzle, water ring, and air line; test safety interlocks.

  • Nozzleman must have clear communication with gun operator (radio or hand signals).

Quick reference

Nozzle Operation and Technique (Dry-Mix)

  • Hold nozzle perpendicular to the surface; maintain distance of 3–6 ft (0.9–1.8 m) for dry-mix.

  • Use consistent circular or elliptical motion; avoid dwelling in one spot to prevent build-up and shadows.

  • Start water at the nozzle before material; stop material before water to prevent clogging.

  • Adjust water at the nozzle to achieve a slightly dark, moist appearance with no dry pockets or sagging.

  • Shoot from bottom to top in vertical work; for overhead, apply in thin layers to avoid fall-out.

  • Maintain a consistent layer thickness: typically 1–3 in. (25–75 mm) for vertical, less for overhead.

  • Keep the nozzle at a 90° angle; if angle must be changed, keep it within 15° of perpendicular.

  • Use a test panel or board to verify mixture and technique before starting production.

Quick reference

Surface Preparation, Placement, and Finishing

  • Surface must be clean, rough, and sound; remove loose material, dust, oil, and laitance.

  • Pre-wet the substrate to saturated-surface-dry (SSD) to prevent absorption of mixing water.

  • For overhead or vertical, use a bonding agent or scratch coat as specified; follow manufacturer instructions.

  • Placement temperature: ambient and substrate between 40°F (4°C) and 90°F (32°C); protect from freezing.

  • Apply in layers; allow initial set before next layer; remove rebound and loose material between layers.

  • Finishing: strike off excess with a straightedge, then float or trowel as specified; avoid overworking.

  • Curing: begin curing as soon as finishing is complete; use curing compound, wet curing, or plastic sheeting.

  • Cold joints: roughen and clean surface, pre-wet, and use bonding agent before placing new layer.

Quick reference

Quality Control, Testing, and Inspection

  • Pre-construction test panel: simulate field conditions, including orientation, thickness, and reinforcement.

  • Test panel evaluation: visual inspection, thickness, compressive strength (cores), and bond strength.

  • Compressive strength: sample from test panel or in-place cores; typical 28-day strength 4000–6000 psi (28–41 MPa).

  • Bond strength: pull-off test per ASTM C1583; minimum typically 100 psi (0.7 MPa) or as specified.

  • Thickness: verify with depth gauge or cores; tolerance typically ±1/4 in. (6 mm) of specified thickness.

  • Inspection: check for voids, delamination, dry patches, and rebound pockets; tap with hammer for delamination.

  • Record keeping: document mixture proportions, water addition, test results, and environmental conditions.

  • Quality control testing frequency: per project specification, often one set per 50 yd³ (38 m³) or per shift.

Quick reference

Safety, Environmental, and Regulatory Requirements

  • PPE: wear NIOSH-approved respirator, safety glasses, face shield, gloves, and hearing protection.

  • Silica exposure: dry-mix contains crystalline silica; follow OSHA 29 CFR 1910.1053 (respirable crystalline silica).

  • Use engineering controls: water mist, ventilation, and vacuum dust collection; avoid dry sweeping.

  • Nozzleman and helper must not stand directly in line with the hose; high-pressure air/water can cause injury.

  • Compressed air safety: never exceed hose rated pressure; secure couplings with safety pins.

  • Waste disposal: contain rebound and wash water; prevent entry into storm drains per local regulations.

  • Material Safety Data Sheets (SDS) must be available on site for all products.

  • Confined space entry: follow OSHA 29 CFR 1910.146 if applicable.

Quick reference

Repair, Troubleshooting, and Rework

  • Dry, dusty material at nozzle: increase water pressure or check water ring for blockage.

  • Sagging or sloughing: reduce water content, reduce layer thickness, or increase accelerator dose.

  • Pulsating flow: check for kinked hose, worn rotor/stator, or inconsistent feed; maintain steady air pressure.

  • Clogged hose: stop material, reduce air, and clear hose safely; never look into hose end.

  • Rebound pockets or voids: remove loose material, pre-wet, and fill with fresh material.

  • Delamination: remove unsound material, roughen, clean, and apply bonding agent before repair.

  • Repair procedure: square-cut edges, clean, pre-wet, apply bonding agent, and place repair material.

  • Post-repair inspection: verify bond, thickness, and finish; cure repaired area as specified.