ACI Dry-Mix Nozzleman study plan
ACI Dry-Mix Nozzleman · Give each week a clear focus.
8 weeks · About 7 hours per week
Nozzle operation and technique (dry-mix)
Map the dry-mix nozzle operation sequence from pre-wet check to final pass and label each step's decision points
Explain how nozzle distance, angle, and travel speed each change build thickness and surface finish
Demonstrate (or narrate aloud) correct gun-start and gun-stop technique that avoids cold joints and lumpy starts
Identify the five most common nozzle-technique defects and state the corrective action for each
Your checkpoint
A one-page nozzle-technique decision flowchart plus a 10-item self-quiz scored at 80% or better
Nozzle operation and technique (dry-mix) & Equipment: dry-mix gun, hose, nozzle, and air/water controls
Trace material flow from gun to nozzle tip and explain what each air and water control changes
Adjust water at the nozzle to hit a target consistency and describe the visual cues for too-wet and too-dry mix
Diagnose three air/water control faults (pulsing, surging, wet slugs) and state the first corrective step for each
List hose and nozzle wear indicators and the point at which each part is replaced
Your checkpoint
A written troubleshooting table covering at least 8 equipment/technique symptoms with causes and first actions
Materials, mixture proportioning, and dry-mix process fundamentals
Describe how cementitious binder, aggregate gradation, and admixtures affect set time and rebound in the dry-mix process
Explain why water is added only at the nozzle and how that constrains mixture proportioning
Compare the effect of fiber reinforcement and polymer modification on placement and finishing behavior
Identify how ambient temperature and substrate moisture shift the working consistency target
Your checkpoint
A 300-word plain-language summary of dry-mix fundamentals plus a 15-question practice set scored at 80% or better
Surface preparation, placement, and finishing
Sequence substrate preparation steps for concrete, masonry, and steel and state the acceptance criteria before shooting
Explain surface profile, saturation, and bonding-agent decisions and when each applies
Describe placement sequencing for walls, overheads, and repairs to avoid shadowing and cold joints
Outline finishing steps and the timing window for each relative to set
Your checkpoint
A substrate-preparation and placement checklist that a helper could follow without asking questions
Equipment: dry-mix gun, hose, nozzle, and air/water controls & Surface preparation, placement, and finishing
Assemble a pre-shift equipment inspection routine covering gun, hose, nozzle, gaskets, and air/water supply
State safe shutdown, depressurization, and hose-handling steps in correct order
Match placement method to section thickness and reinforcement spacing
Explain how nozzle orientation and rebound control change when shooting overhead versus vertical
Your checkpoint
A printable pre-shift inspection and shutdown card covering both equipment and placement readiness
Quality control, testing, and inspection
List the field tests and inspections that apply to dry-mix placement and what each one verifies
Explain sampling, specimen handling, and recordkeeping expectations for acceptance testing
Identify visual inspection criteria for thickness, voids, delamination, and surface defects
Describe how to document a nonconformance from discovery through disposition
Your checkpoint
A QC inspection log template with test names, frequencies, acceptance criteria, and sign-off fields
Repair, troubleshooting, and rework & Safety, environmental, and regulatory requirements
Classify defects as cosmetic, structural, or bonding failures and select the matching repair method
Write rework steps for honeycomb, delamination, and cold joints including surface prep for the repair
Identify personal protective equipment, silica-dust controls, and confined-space and overhead hazards for nozzle work
State environmental and regulatory obligations for waste, washout, and airborne dust on a dry-mix job
Your checkpoint
A repair-and-safety reference sheet pairing each defect class with its repair method and the applicable hazard controls
Nozzle operation and technique (dry-mix) & Quality control, testing, and inspection & Repair, troubleshooting, and rework
Run two full-length timed practice exams and review every missed item to root cause
Re-drill weak items in the heaviest domains until each is answered correctly twice
Rehearse verbal explanations of nozzle technique, troubleshooting, and repair decisions as if teaching an apprentice
Confirm exam-day logistics, allowed references, and time-allocation strategy
Your checkpoint
A scored practice-exam summary showing 85% or better overall and a short list of remaining weak areas with a review plan
Milestones
Week 2: Can explain and demonstrate correct gun start/stop and water adjustment, and diagnose at least 6 equipment or technique faults without notes
Week 4: Scores 80% or better on a 25-question mixed set covering domains 1, 3, and 4
Week 6: Can produce a complete QC inspection log from memory and justify each test's purpose
Week 8: Scores 85% or better on two timed full-length practice exams with no domain below 75%