Week 1

Wet-Mix Shotcrete Placement and Nozzle Operation & Shotcrete Materials, Mixture Proportions, and Equipment

  • Define wet-mix shotcrete and contrast it with dry-mix in terms of material flow, water introduction point, and nozzleman control

  • Identify the major components of a wet-mix delivery system (pump, hose, nozzle, air ring, water ring) and state each component's function

  • Describe the nozzleman's core responsibilities during placement, including stance, hose handling, and communication with the pump operator

  • List the key mixture characteristics (slump, air content, aggregate gradation) that affect pumpability and shootability

Your checkpoint

A one-page labeled diagram of a wet-mix delivery system with each component's function written beside it

Week 2

Wet-Mix Shotcrete Placement and Nozzle Operation & Shotcrete Materials, Mixture Proportions, and Equipment

  • Explain how slump and water-cementitious ratio influence pumping, adhesion, and rebound in wet-mix

  • Describe the role of accelerators, silica fume, and fibers in wet-mix and how each affects nozzle technique

  • Outline the correct startup, steady-state, and shutdown sequence for a wet-mix pump and nozzle line

  • Identify common pumping problems (blockages, segregation, pulsation) and state a corrective action for each

Your checkpoint

A troubleshooting table listing at least eight pumping/placement faults with cause and corrective action

Week 3

Wet-Mix Shotcrete Placement and Nozzle Operation & Surface Preparation, Application Technique, and Finish

  • Describe the correct nozzle angle, distance from substrate, and travel pattern for vertical and overhead placement

  • Explain how to build up thickness in layers and when to stop a pass to avoid sagging or sloughing

  • Demonstrate (in writing) how nozzleman movement controls rebound and encapsulation of reinforcement

  • Identify the causes of shadowing behind rebar and state techniques to eliminate voids

Your checkpoint

A written step-by-step placement procedure for a vertical wall with rebar, including nozzle angle, distance, and pass thickness

Week 4

Surface Preparation, Application Technique, and Finish & Wet-Mix Shotcrete Placement and Nozzle Operation

  • List substrate preparation requirements for soil, rock, concrete, and masonry surfaces before shooting

  • Describe surface wetting, bonding agent, and pre-dampening practices and when each applies

  • Explain how to shoot around embedded items, penetrations, and anchors without creating voids

  • Outline finishing operations for wet-mix, including screeding, floating, and texturing timing

Your checkpoint

A substrate preparation checklist covering at least four substrate types with required steps for each

Week 5

Surface Preparation, Application Technique, and Finish & Quality Control, Testing, Safety, and Repair

  • Describe curing requirements for wet-mix shotcrete and select an appropriate curing method for a given exposure

  • Identify common defects (sagging, voids, dry pockets, sand pockets, delamination) and their root causes

  • Explain how to prepare and execute a repair of a defective area, including removal, surface prep, and re-shooting

  • State the acceptance criteria a nozzleman should self-check before leaving a placement

Your checkpoint

A defect-identification and repair guide covering at least six defect types with cause, inspection method, and repair procedure

Week 6

Quality Control, Testing, Safety, and Repair & Shotcrete Materials, Mixture Proportions, and Equipment

  • Describe test panel requirements, including panel construction, orientation, and curing before testing

  • Explain core drilling, compressive strength testing, and how panel results relate to in-place quality

  • Identify the tests used to evaluate wet-mix (slump, air content, temperature, strength) and the purpose of each

  • Describe the nozzleman's role in producing representative test panels

Your checkpoint

A test panel procedure sheet describing panel size, orientation, shooting method, curing, and core extraction steps

Week 7

Quality Control, Testing, Safety, and Repair & Wet-Mix Shotcrete Placement and Nozzle Operation

  • List the personal protective equipment and site hazards specific to wet-mix shotcrete (rebound, dust, noise, confined space)

  • Describe safe practices for nozzle operation, hose handling, and communication during placement

  • Explain confined-space and overhead-shooting precautions and required controls

  • Outline emergency shutdown and line-depressurization procedures

Your checkpoint

A safety job brief for a wet-mix placement covering PPE, hazards, controls, and emergency shutdown steps

Week 8

Wet-Mix Shotcrete Placement and Nozzle Operation & Shotcrete Materials, Mixture Proportions, and Equipment & Surface Preparation, Application Technique, and Finish & Quality Control, Testing, Safety, and Repair

  • Synthesize all four domains into an integrated placement plan for a representative project

  • Self-test on missed concepts from weeks 1-7 and close remaining gaps

  • Explain the nozzleman's quality responsibilities from pre-placement through final acceptance

  • Prepare concise answers to scenario-based questions spanning materials, technique, QC, and safety

Your checkpoint

A complete mock placement plan plus a 40-question self-test with at least 85% correct

Milestones

Week 2: Can explain the wet-mix delivery system and diagnose at least six pumping faults without notes

Week 4: Can write a full vertical-wall placement procedure and a multi-substrate prep checklist from memory

Week 6: Can describe test panel construction and core testing accurately and explain the nozzleman's role

Week 8: Scores at least 85% on the 40-question self-test covering all four domains