ACPV study materials
ACPV study resources

ACPV study plan

ACPV · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Value Management and Value Engineering Methodology

  • Define value management and value engineering in your own words and distinguish them from cost cutting

  • Map the VE job plan phases in order and write a one-sentence purpose for each

  • Identify the function-analysis vocabulary (function, FAST diagram, worth) and produce a labeled example

  • List the criteria used to select candidate VE studies and rank three hypothetical projects against them

Your checkpoint

A one-page VE job plan summary with all phases, purposes, and a hand-drawn FAST diagram for a simple building system

Week 2

Value Management and Value Engineering Methodology

  • Apply function analysis to decompose a constructed example into primary and secondary functions

  • Compute a value index from given function worth and cost figures

  • Compare creative-phase techniques and select one for a stated workshop constraint

  • Draft evaluation-phase scoring criteria and weight them for a sample option set

Your checkpoint

A worked VE case write-up: function list, value index calculations, three alternatives scored, and a recommendation with rationale

Week 3

Project Management Fundamentals and Governance

  • Outline the project life cycle and place governance decision gates at the correct stages

  • Differentiate project, program, and portfolio governance and give a control example for each

  • Describe the roles of sponsor, project manager, and steering committee without overlap

  • Explain how a PMO's mandate changes reporting and escalation paths

Your checkpoint

A governance map for a sample capital project showing gates, approval authorities, and escalation routes

Week 4

Value Management and Value Engineering Methodology & Project Management Fundamentals and Governance

  • Integrate VE study timing into the project life cycle and justify the highest-value intervention points

  • Write governance criteria that trigger a mandatory VE study

  • Produce a short-answer response explaining how VE findings feed gate decisions

Your checkpoint

A two-page integrated brief linking VE study timing to governance gates, with a trigger-criteria table

Week 5

Cost and Schedule Analysis

  • Build a cost breakdown structure and classify costs as direct, indirect, and life-cycle

  • Calculate earned value metrics (PV, EV, AC, CV, SV, CPI, SPI) from a provided data set

  • Interpret a critical path and identify total float on a small network diagram

  • Diagnose schedule variance causes and match each to a corrective action

Your checkpoint

A cost-and-schedule analysis workbook with EVM calculations, a network diagram with float identified, and a variance narrative

Week 6

Risk, Uncertainty, and Decision Analysis

  • Distinguish risk from uncertainty and classify a list of events correctly

  • Perform qualitative risk assessment using probability and impact scoring

  • Select and justify a quantitative technique (expected value, decision tree, sensitivity) for three scenarios

  • Construct a decision tree with expected values and recommend a branch

Your checkpoint

A risk register with scores plus a solved decision tree showing expected values and a documented recommendation

Week 7

Stakeholder Engagement and Team Leadership & Ethics, Professional Conduct, and Standards

  • Map stakeholders by influence and interest and assign an engagement strategy to each quadrant

  • Draft a communication plan with frequency, channel, and owner for a sample project

  • Identify conflicts of interest and apply a disclosure-and-recusal response to two scenarios

  • Summarize core professional conduct obligations and where they constrain cost or schedule pressure

Your checkpoint

A stakeholder engagement and communication plan paired with two written ethics scenario responses

Week 8

Project Management Fundamentals and Governance & Value Management and Value Engineering Methodology & Cost and Schedule Analysis & Risk, Uncertainty, and Decision Analysis & Stakeholder Engagement and Team Leadership & Ethics, Professional Conduct, and Standards

  • Retrieve key definitions and formulas from memory across all six domains

  • Complete timed practice sets and log every miss by domain

  • Re-teach the three weakest subtopics in writing without notes

  • Build a final one-page formula and concept sheet

Your checkpoint

A full-length timed practice result log with a prioritized remediation list and a finished one-page reference sheet

Milestones

Week 2: Can complete a full function analysis and value index calculation unaided on a new example

Week 4: Can explain VE-to-governance linkage in a five-minute verbal walkthrough without notes

Week 6: Scores 80% or higher on a mixed cost, schedule, and risk practice set

Week 8: Scores 75% or higher overall on a full timed practice exam with no domain below 70%