ACT WorkKeys is a family of career-readiness assessments from ACT that measure foundational workplace skills. The Workplace Observation assessment is one of the Essential Skills listed alongside Applied Math, Graphic Literacy, Workplace Documents, Applied Technology, Business Writing, and Talent Fit. According to ACT, the assessments were developed to solve actual workplace problems and measure a range of skills relevant to any occupation, at any level, and across industries. Successful completion of the WorkKeys core assessments can lead to earning an ACT WorkKeys National Career Readiness Certificate (NCRC), a credential that verifies skills most essential across industries and occupations. The WorkKeys Observation case studies are 5 cases and about 1,921 words.

1

Shift Coverage with Cross-Trained Staff

A distribution center runs two shifts: Day (7:00–15:00) and Evening (15:00–23:00). Six employees are cross-trained on the forklift certification that the evening receiving dock requires.

373 words, about 2 min
2

Reading a Production Line Chart for a Bottleneck

A packaging line has four stations in series. A posted throughput chart (units per hour, by station) shows: Filler 480, Capper 420, Labeler 600, Case Packer 500.

367 words, about 2 min
3

Interpreting a Policy Memo with Conflicting Clauses

Carryover must be used by March 31 or it is forfeited. Requests for carryover use in Q1 are approved on a first-come basis; no more than two employees per team may be on vacation in the same week.

361 words, about 2 min
4

Diagnosing an Intermittent Equipment Fault

A conveyor motor trips its overload breaker intermittently - roughly twice per shift, always 20–40 minutes after start-up, and more often on warm afternoons. The breaker resets fine and the motor runs normally afterward.

371 words, about 2 min
5

Rewriting a Blaming Message to a Vendor

A purchasing coordinator must email a supplier about a late shipment. Our whole line is going to shut down Friday because your shipment is late, and frankly this is unacceptable.

449 words, about 2 min