- Percent change formula
- Subtract the old value from the new value, divide by the old value, then multiply by 100. A negative result indicates a decrease.
- Unit rate
- A ratio that compares a quantity to one unit of another quantity, such as miles per hour. Divide the quantity by the time to find it.
- Solving a proportion
- Set two ratios equal and cross-multiply: if a/b = c/d, then ad = bc. Solve the resulting equation for the unknown value.
- Mean calculation
- Add all the values in a data set and divide by the number of values. The mean is affected by unusually high or low values.
- Mixture concentration
- The amount of a substance equals its concentration multiplied by the volume. When mixing, total substance is the sum of the parts.
- Reading a line graph
- The horizontal axis shows the independent variable and the vertical axis the dependent variable. Find a point, then read across to the other axis.
- Graph scale interval
- The value between consecutive tick marks. Find it by dividing the difference between labeled marks by the number of spaces between them.
- Pie chart purpose
- A pie chart shows parts of a whole; each slice's size is proportional to its share of the total. All slices sum to 100 percent.
- Using a legend
- A legend maps colors, patterns, or symbols to categories. Match each symbol to its label before interpreting the data shown.
- Gantt chart bars
- A Gantt chart shows tasks as horizontal bars. Bar length represents duration, and position shows start and end dates.
- Must versus may
- In policies, 'must' indicates a required action, while 'may' indicates an optional one. The distinction determines compliance obligations.
- Memo header lines
- The TO, FROM, DATE, and SUBJECT lines identify the audience, sender, timing, and purpose of a memo before the body text.
- Signal words in warnings
- DANGER indicates the most severe hazard, WARNING a moderate hazard, and CAUTION the least severe. The word signals the level of risk.
- Resolving document conflicts
- When two workplace documents conflict, the more specific or more recently issued document generally governs, unless policy states otherwise.
- Scanning a document
- Looking for headings, bold text, or keywords to locate a specific fact quickly, rather than reading every line in order.
- Open-loop control
- A system that runs a set process without measuring the output. It cannot correct itself if conditions change.
- Closed-loop control
- A system that measures actual output and adjusts the process to reach a target, such as a thermostat controlling a heater.
- Series versus parallel circuits
- In a series circuit, one break stops all current. In a parallel circuit, other branches continue to operate if one fails.
- Torque relationship
- Torque equals force multiplied by distance from the pivot. Increasing the distance increases torque for the same applied force.
- Gear ratio effect
- A larger gear meshing with a smaller gear turns more slowly but delivers greater torque. The smaller gear turns faster with less torque.
- Preventive maintenance
- Maintenance scheduled at set intervals to prevent failure, as opposed to corrective maintenance performed after equipment breaks down.
- Active voice
- A sentence structure where the subject performs the action, such as 'The team approved the plan.' It is clearer and more direct.
- Main point first
- Placing the most important information in the opening sentence or paragraph so busy readers understand the purpose immediately.
- Parallel structure
- Using the same grammatical form for items in a list or series, such as all verbs or all nouns, which improves readability.
- Concise word choice
- Replacing wordy phrases with shorter equivalents, such as 'daily' for 'on a daily basis' or 'because' for 'due to the fact that.'
- Bad-news message structure
- Open with a buffer, give the reason, state the decision clearly, and close with a forward-looking statement or alternative.
- Fact versus inference
- A fact is directly observed, such as a time and action. An inference is a conclusion about cause or intent that may be wrong.
- Observation report contents
- Include who, what, when, where, and how, stated without blame. Separate factual observations from opinions or judgments.
- Comparing to a standard
- Checking observed behavior or conditions against a written procedure or specification to identify deviations that need correction.
- Detecting change
- Comparing the current state of a workplace or process to a known baseline to identify differences that may indicate a problem.
- Can-do versus will-do
- Can-do factors are skills and abilities; will-do factors are motivation and attitude. Talent fit considers both for a role.
- Demonstrating reliability
- Showing up on time, attending consistently, and completing commitments. Reliability is a key predictor of workplace fit.