Electrical Theory and Fundamentals

  • Ohm's law: E = I × R; power P = E × I = I²R = E²/R (DC resistive circuits).

  • Series circuit: R_total = R1 + R2 + …; current is identical through every element; voltage divides in proportion to resistance.

  • Parallel circuit: 1/R_total = 1/R1 + 1/R2 + …; voltage is identical across branches; branch currents sum to total current.

  • AC impedance: Z = √(R² + X²); inductive reactance X_L = 2πfL (lags 90°), capacitive reactance X_C = 1/(2πfC) (leads 90°).

  • Three-phase power: P = √3 × E_line × I_line × PF for a balanced load; single-phase P = E × I × PF.

  • Transformer voltage ratio equals turns ratio: E_primary/E_secondary = N_primary/N_secondary; power in ≈ power out (minus losses).

  • Conductor resistance rises with length and temperature and falls with increased circular-mil area: R = K × L / CM.

  • Effective (RMS) value of a sine wave = 0.707 × peak; average value = 0.637 × peak.

Quick reference

National Electrical Code (NEC) Requirements

  • NEC is organized into Chapters 1–9; Chapter 1–4 rules apply generally, Chapters 5–7 cover special occupancies, equipment, and conditions, Chapter 9 holds tables.

  • Article 100 definitions govern throughout: a branch circuit is the circuit conductors between the final overcurrent device and the outlets.

  • Continuous loads are calculated at 125% of their rated current for branch-circuit and feeder sizing (NEC 210.19, 215.2).

  • Standard overcurrent device sizes per NEC 240.6 include 15, 20, 30, 40, 50, 60, 70, 100, 125, 150, 200 A.

  • Working clearance at equipment is governed by NEC 110.26 Table 110.26(A)(1): 3 ft for 0–150 V to ground, increasing with voltage and condition.

  • GFCI protection is required for personnel in bathrooms, garages, outdoors, kitchens, and similar wet or damp locations per NEC 210.8.

  • Conductor ampacity tables are NEC 310.16; ampacities are adjusted for ambient temperature and number of current-carrying conductors (310.15).

  • The NEC is not a design manual or installation specification; it is the minimum standard for safe installation, and local amendments may be stricter.

Quick reference

Electrical Safety and Hazard Awareness

  • Current, not voltage, causes physiological damage; roughly 1 mA is perceptible, 10–20 mA causes muscle lock, and 100+ mA can be fatal.

  • Body resistance drops sharply when skin is wet, so shock severity rises with moisture, contact area, and duration.

  • Arc flash incident energy depends on available fault current, clearing time, and working distance; boundaries are defined in NFPA 70E.

  • Approach boundaries: limited, restricted, and arc flash boundary; energized work requires an energized electrical work permit unless justified as infeasible de-energized.

  • Lockout/tagout requires a verified zero-energy state, a lock per worker, and a test with a meter rated for the system voltage (CAT III/IV).

  • PPE categories are selected from an arc-rated clothing system matched to the calculated incident energy, not to voltage alone.

  • Class C fires involve energized electrical equipment; a conductive extinguishing agent must not be used until power is removed.

  • Grounding and bonding limit touch potential; equipment grounding conductors carry fault current back to the source to trip the overcurrent device.

Quick reference

Wiring Methods, Materials, and Installation Practices

  • NM-B cable is permitted in dry, protected locations; it is prohibited in wet locations, in masonry cavities, and where subject to physical damage.

  • EMT requires support within 3 ft of a box and at intervals not exceeding 10 ft; rigid metal conduit intervals are 10 ft with 3-ft box support.

  • Box fill is calculated per NEC 314.16 by counting conductors, devices, and grounds as volume allowances against the box's cubic-inch rating.

  • Conduit fill per Chapter 9 Table 1: 1 conductor 53%, 2 conductors 31%, over 2 conductors 40% of interior cross-sectional area.

  • Bend radius and conduit body sizing are governed by NEC 344/358 and Chapter 9 Table 2; total bends between pull points are limited to 360°.

  • Wire ampacity depends on insulation temperature rating (60/75/90 °C) and termination rating; the lower of conductor and terminal ratings governs.

  • Cable and raceway entries into enclosures require listed connectors; unused openings must be closed to maintain the enclosure rating.

  • Expansion, seismic, and corrosion considerations dictate fitting selection; dissimilar metals require compatible connectors to avoid galvanic corrosion.

Quick reference

Electrical Equipment, Devices, and Controls

  • Motor branch-circuit short-circuit protection is sized per NEC 430.52 (e.g., inverse-time breaker typically up to 250% of FLC), separate from overload protection.

  • Motor overload protection protects the motor from sustained overcurrent; the running overload device is sized to the motor's service factor and temperature rise.

  • Contactors switch load current; starters add overload relays; a disconnect must be within sight of the motor controller per NEC 430.102.

  • A transformer's primary protection is sized per NEC 450.3 based on transformer rating and primary/secondary voltage; secondary protection may be required.

  • Switch and receptacle ratings must not be less than the circuit's ampacity; a 15 A receptacle may be used on a 20 A circuit only where permitted by 210.21(B).

  • Control circuits are classified by voltage and source; a Class 2 circuit is power-limited and must be separated from power conductors per Article 725.

  • Device terminal markings (screw color, back-wire clamps) indicate conductor material and torque requirements; terminations must be torqued to the manufacturer's specification.

  • GFCI and AFCI devices protect against different hazards: GFCI against ground-fault shock, AFCI against arc-fault ignition.

Quick reference

Electrical Systems Design, Planning, and Estimating

  • Load calculation per NEC Article 220 uses general lighting VA per square foot, demand factors, and appliance/receptacle additions.

  • Standard dwelling lighting load is 3 VA/ft²; small-appliance and laundry branch circuits are 1,500 VA each, subject to demand factors.

  • Service and feeder sizing uses the calculated load divided by the supply voltage; account for the largest motor at 125% per NEC 430.24.

  • Voltage drop approximation: VD = (2 × K × I × L) / CM for single-phase, and √3 factor for three-phase; 3% branch and 5% total are common targets.

  • Panel schedule planning includes spare capacity, breaker space for future loads, and balancing phase loads to limit neutral current.

  • Estimating requires takeoff of conduit, conductors, boxes, devices, and labor units; labor units are typically expressed per device or per 100 ft.

  • Coordination studies set breaker trip settings so downstream devices clear faults before upstream devices, minimizing outage scope.

  • Short-circuit and available fault current studies verify equipment interrupting ratings (AIC) exceed the calculated available fault current.

Quick reference

Testing, Troubleshooting, and Maintenance

  • A meter's CAT rating must meet or exceed the installation's overvoltage category; CAT III/IV for service and distribution equipment.

  • Continuity and resistance tests are performed with power off; voltage tests are performed with power on and the meter on the correct function.

  • Insulation resistance testing (megohmmeter) applies a DC test voltage and reads resistance in megohms; readings trend downward indicate degradation.

  • A clamp-on ammeter measures current without breaking the circuit; it must be clamped around a single conductor to read that conductor's current.

  • Ground fault location uses a ground-fault clamp or divided-circuit testing; a neutral-to-ground bond downstream of the service causes nuisance tripping.

  • Motor troubleshooting sequence: verify voltage at the disconnect, check overloads, measure winding resistance, then test insulation to ground.

  • Thermographic inspection identifies loose connections and overloaded conductors by temperature rise under load.

  • Preventive maintenance includes torque checks, cleaning, insulation testing, and exercising breakers and switches on a defined schedule.