AEE CEP · Keep the key ideas within reach.

Quick reference

Energy Markets and Price Fundamentals

  • Merit-order dispatch ranks generating units by ascending marginal cost; the most expensive unit required to meet demand sets the clearing price, so all infra-marginal units earn a margin.

  • Heat rate (Btu/kWh) = 3,412 / thermal efficiency; a 50%-efficient combined-cycle plant has a heat rate of about 6,824 Btu/kWh.

  • Spark spread ($/MWh) = power price - (gas price $/MMBtu x heat rate / 1,000); a positive spread signals profitable gas-fired generation.

  • Electricity cannot be stored at scale, so supply must equal demand instantaneously; inelastic demand plus must-run or subsidized generation produces sharp volatility and negative prices.

  • North American gas benchmarks at Henry Hub (NYMEX futures); European gas at TTF; Asian LNG commonly indexed to JKM or oil-linked formulas.

  • Crude benchmarks are WTI (delivered Cushing) and Brent (North Sea); refined products trade at the crude price plus a crack spread.

  • Forward curves are in contango when forward prices exceed spot (carry, storage cost) and in backwardation when forward prices sit below spot (prompt scarcity, convenience yield).

  • Power forward curves are shaped rather than flat: on-peak blocks price above off-peak, and the peak/off-peak ratio widens as renewable penetration grows and reserve margins tighten.

  • Resource adequacy is priced either through a capacity market (for example PJM) or through scarcity and ancillary pricing (ERCOT); a shrinking reserve margin raises that price.

Quick reference

Procurement Strategy and Sourcing Methods

  • The sourcing spectrum runs from full fixed price (budget certainty, risk premium included) through block-and-index to pure index purchase (no premium, full market exposure).

  • Block-and-index practice commonly fixes 60-80% of forecast load with shaped blocks and leaves the remainder floating to retain participation in price declines.

  • A full-requirements contract transfers volume and shape risk to the supplier and is priced at a premium over the equivalent block purchase.

  • Build the load baseline first: interval meter data, weather normalization, and 12-36 months of history establish the volume and hourly shape to be procured.

  • Layered (tranche) procurement spreads execution over successive periods, averaging the achieved price and removing single-entry timing risk.

  • RFP design must fix volume, term, shape, index, credit terms, and the evaluation formula so that bids are comparable on total delivered cost.

  • Counterparty screening covers credit rating, collateral demanded, delivery track record, and a maximum concentration limit per supplier.

  • Total delivered cost = commodity + capacity or demand charges + transmission and distribution + ancillary services + taxes + supplier margin; commodity price alone misleads.

  • Demand-side measures (efficiency, load shifting, on-site generation) shrink the volume that must be hedged and are usually cheaper per MWh than additional supply.

Quick reference

Contract Structures, Terms, and Negotiation

  • Contract families: fixed price and fixed volume, full requirements, index-plus-adder, block-and-index, collar, and physical or virtual PPA.

  • Volume clauses normally set a tolerance band (often plus or minus 10-20%) around nominations; delivery outside the band triggers imbalance charges or penalties.

  • The price formula should name the index, the publication, a fallback for missing or corrupted data, rounding conventions, and the settlement calendar.

  • Credit terms to negotiate: unsecured thresholds, mark-to-market collateral, letters of credit, parent guarantees, and rating-based triggers.

  • Change-in-law and tax pass-through clauses allocate regulatory cost risk; force majeure should be defined narrowly so it cannot become a market-price escape.

  • Longer fixed-price terms carry a larger supplier risk premium; the price-versus-term trade-off is the central lever alongside volume flexibility and credit.

  • Negotiate multiple issues at once, trading term, volume tolerance, and credit terms against price, rather than haggling on price alone.

  • Termination provisions should address default, insolvency, and extended force majeure, and must specify how the close-out amount is calculated.

  • Governing law, dispute forum, and collateral valuation methodology are frequent sources of dispute and should be specified explicitly.

Quick reference

Price Risk Management and Hedging Instruments

  • Instrument map: forwards and futures (linear), fixed-for-floating swaps, options (caps, floors, collars), basis swaps, and financial or physical PPAs.

  • Cleared futures require initial margin and daily variation margin, so a hedge that will later be physically offset can still create significant liquidity demands.

  • A cap is a call on the index, a floor is a put, and a collar is a bought cap plus a sold floor: premium is reduced but the benefit of falling prices is capped.

  • Option premium = intrinsic value + time value; time value decays toward expiry, so short-dated protection costs less but covers a shorter window.

  • Hedge ratio = hedged volume / forecast exposure; set it from budget tolerance, competitive position, and the risk appetite approved by the board.

  • Basis risk arises when the hedge hub differs from the delivery point; mitigate with basis swaps or by explicitly accepting the locational spread.

  • Heating-degree-day and cooling-degree-day derivatives hedge volumetric risk where consumption or revenue depends on temperature rather than on price.

  • Effectiveness testing (dollar-offset or regression under IFRS 9 / ASC 815) determines whether hedge gains and losses may be deferred in other comprehensive income.

  • Governance requires a written risk policy with position limits, segregation of execution from approval, and regular mark-to-market and stress reporting.

Quick reference

Regulatory, Financial, and Sustainability Considerations

  • Market architecture: FERC regulates wholesale transmission and ISO/RTO markets, state commissions set retail tariffs and default service, and ERCOT is an intrastate market outside FERC rate jurisdiction.

  • A commercial electricity bill contains commodity, capacity or demand charges, transmission, distribution, ancillary services, riders, and taxes; only some components can be hedged.

  • Carbon pricing (EU ETS, RGGI, California cap-and-trade) raises the marginal cost of emitting generation, shifting the merit order and lifting clearing prices.

  • Renewable portfolio standards and voluntary markets create certificate obligations; the REC or guarantee of origin must be retired to substantiate the claim.

  • GHG Protocol Scope 2 reporting has location-based and market-based methods; contractual instruments determine the market-based figure.

  • Contract classification matters: derivative treatment under ASC 815 / IFRS 9, lease treatment under ASC 842 / IFRS 16, or own-use executory treatment each produce different balance-sheet outcomes.

  • Credit exposure = current mark-to-market + potential future exposure; collateral calls can absorb large amounts of liquidity during price spikes.

  • Corporate clean-energy targets increasingly require hourly (24/7 carbon-free energy) matching rather than annual volumetric matching.

  • Disclosure regimes such as CSRD and climate-related SEC rules increase audit scrutiny of emissions claims that rest on procurement choices.