AEE CMVP key terms
AEE CMVP · Get comfortable with the vocabulary.
- Adjustment (in M&V)
- Related: Routine Adjustment, Non-Routine Adjustment, Baseline
A routine or non-routine change made to baseline or reported energy use so savings reflect current conditions rather than the conditions that existed when the baseline was set.
- Routine Adjustment
- Related: Non-Routine Adjustment, Independent Variable, Baseline
A predictable, regularly applied correction to baseline energy use driven by variables such as weather, production volume, or occupancy, typically calculated with an agreed mathematical method each reporting period.
- Non-Routine Adjustment
- Related: Routine Adjustment, Adjustment (in M&V), Baseline
A correction applied when an unforeseeable change alters energy use, such as a facility addition, major equipment swap, or occupancy shift, requiring engineering judgment and often negotiated documentation before savings are reported.
- Baseline
- Related: Baseline Period, Adjustment (in M&V), Energy Baseline
The pre-retrofit period of energy use, demand, and operating conditions against which post-installation performance is compared to compute savings.
- Baseline Period
- Related: Baseline, Reporting Period, Independent Variable
The defined span of time, usually twelve consecutive months, selected to represent typical pre-retrofit operations and used to develop the baseline model or average.
- Reporting Period
- Related: Baseline Period, Savings, Measurement Boundary
The defined interval after retrofit installation over which actual energy use is measured and compared with adjusted baseline values to determine savings.
- Independent Variable
- Related: Routine Adjustment, Regression Model, Static Factor
A measurable factor such as outdoor temperature, degree-days, or production output that drives energy use and is used in a model to adjust the baseline to current conditions.
- Static Factor
- Related: Independent Variable, Routine Adjustment, Non-Routine Adjustment
A condition or driver expected to remain essentially unchanged between baseline and reporting periods, such as building size or installed equipment capacity, so no routine adjustment is needed for it.
- Interactive Effects
- Related: Measurement Boundary, Adjustment (in M&V), Savings
Changes in energy use in one system caused by a retrofit in another, such as reduced lighting heat load lowering space heating or raising cooling energy, which should be accounted for in the measurement boundary.
- IPMVP Option A
- Related: Retrofit Isolation, Stipulated Value, IPMVP Option B
Retrofit isolation with key parameter measurement, where the savings-determining parameters are measured continuously or periodically while others are stipulated by agreement, often used for lighting or fixed-load retrofits.
- IPMVP Option B
- Related: Retrofit Isolation, IPMVP Option A, Continuous Measurement
Retrofit isolation with all parameter measurement, where every parameter affecting the savings calculation is measured for the full reporting period, suited to variable-load measures with significant uncertainty.
- IPMVP Option C
- Related: Whole Facility Metering, Regression Model, IPMVP Option D
Whole facility metering, where savings are determined from utility meter data for the entire building or site, with adjustments from a baseline model, appropriate when savings are large relative to total use.
- IPMVP Option D
- Related: Calibrated Simulation, IPMVP Option C, Model Calibration
Calibrated simulation, where a computer model of the facility is calibrated to measured baseline data and used to estimate savings, useful when metering is impractical or multiple measures interact strongly.
- Retrofit Isolation
- Related: Measurement Boundary, IPMVP Option A, IPMVP Option B
A measurement boundary limited to the equipment or system affected by a single energy conservation measure, isolating its energy use from the rest of the facility.
- Measurement Boundary
- Related: Retrofit Isolation, Whole Facility Metering, Interactive Effects
The defined physical or logical envelope within which energy flows are measured or estimated for savings determination, which must be documented and applied consistently across baseline and reporting periods.
- Stipulated Value
- Related: IPMVP Option A, M&V Plan, Continuous Measurement
A parameter value agreed by the parties rather than measured, permitted under Option A for factors that are well understood and unlikely to change, and documented in the M&V plan.
- Whole Facility Metering
- Related: IPMVP Option C, Regression Model, Measurement Boundary
Use of the main utility meters serving an entire building or site to determine total energy use for savings calculations, capturing all measures and their interactions together.
- Calibrated Simulation
- Related: IPMVP Option D, Model Calibration, Regression Model
A building energy model adjusted until its predicted energy use closely matches measured utility data for a known period, then used to estimate savings under defined conditions.
- Model Calibration
- Related: Calibrated Simulation, Coefficient of Variation (CV(RMSE)), Regression Model
The iterative process of tuning simulation inputs so model output statistically matches measured energy data, judged with metrics such as mean bias error and coefficient of variation of root mean square error.
- M&V Plan
- Related: Measurement Boundary, Baseline Period, Stipulated Value
A document written before construction that defines the measurement boundary, baseline, metering approach, adjustment method, reporting format, and responsibilities for verifying savings.
- Savings
- Related: Adjustment (in M&V), Baseline, Reporting Period
The difference between adjusted baseline energy use or cost and actual reporting-period energy use or cost, expressed as avoided consumption rather than a simple before-and-after subtraction.
- Avoided Energy Cost
- Related: Savings, Demand Savings, Normalized Savings
The monetary value of energy not consumed because of a retrofit, calculated using the applicable tariff or rate structure and reported alongside physical energy savings.
- Normalized Savings
- Related: Savings, Routine Adjustment, Independent Variable
Savings recalculated to a common set of conditions, such as a typical weather year or standard production level, so results from different periods or projects can be compared fairly.
- Demand Savings
- Related: Interval Data, Avoided Energy Cost, Savings
Reduction in peak electrical demand (kW) achieved by a measure, determined from interval or peak-interval data and often valued separately from energy (kWh) savings under the tariff.
- Data Quality Indicators
- Related: Metering Plan, Uncertainty, M&V Plan
Documented assessments of metering accuracy, completeness, and reliability that support the credibility of reported savings and are typically recorded in the M&V plan and reports.
- Metering Plan
- Related: Interval Data, Data Quality Indicators, M&V Plan
The portion of an M&V plan specifying which meters, sensors, and data loggers are installed, where, at what interval, and how data are validated and stored.
- Interval Data
- Related: Demand Savings, Metering Plan, Continuous Measurement
Energy measurements recorded at fixed short time steps, such as 15-minute or hourly readings, enabling load-shape analysis, demand determination, and time-of-use savings evaluation.
- Continuous Measurement
- Related: Interval Data, IPMVP Option B, Stipulated Value
Ongoing recording of a parameter throughout the reporting period, as opposed to spot or short-term measurement, providing the strongest evidence for savings under retrofit isolation options.
- Short-Term Measurement
- Related: Continuous Measurement, Stipulated Value, Uncertainty
Measurement conducted for a limited period, often used to establish load shapes or operating patterns that are then extrapolated, with the extrapolation method documented in the M&V plan.
- Regression Model
- Related: Independent Variable, Routine Adjustment, Coefficient of Variation (CV(RMSE))
A statistical equation relating energy use to one or more independent variables, commonly used to adjust baseline energy use to reporting-period conditions.
- Coefficient of Variation (CV(RMSE))
- Related: Regression Model, Model Calibration, Uncertainty
A normalized measure of how well a model fits measured data, computed as the root mean square error divided by the mean measured value, with lower values indicating better fit.
- Coefficient of Determination (R-squared)
- Related: Regression Model, Independent Variable, Model Calibration
A statistic describing the proportion of variation in measured energy use explained by the regression model, used to judge whether the model captures the dominant drivers.
- Uncertainty
- Related: Data Quality Indicators, Coefficient of Variation (CV(RMSE)), Savings
The range within which true savings are expected to lie, arising from metering error, sampling, modeling error, and unknown variables, and typically reported alongside the savings estimate.
- Energy Baseline
- Related: Baseline, Regression Model, Routine Adjustment
The modeled or averaged relationship between energy use and its drivers during the baseline period, used as the reference for computing adjusted savings in later periods.
- Energy Conservation Measure (ECM)
- Related: Retrofit Isolation, Measurement Boundary, Savings
A specific retrofit, equipment change, or operational practice installed to reduce energy use or cost, and the unit around which the measurement boundary is usually drawn.
- Stipulated Load Shape
- Related: Stipulated Value, Short-Term Measurement, IPMVP Option A
An agreed pattern of energy use over time, based on engineering estimates or prior data, used in place of continuous metering when measurement is impractical or uneconomic.