Asbestos Inspection and Assessment Findings

  • Inspection findings must identify the material, its location, quantity (square or linear feet), accessibility, condition, and type (surfacing, thermal system insulation, or miscellaneous).

  • Assessment categories: damaged or significantly damaged TSI, damaged friable surfacing, damaged friable miscellaneous, and nonfriable materials that may become friable.

  • Friability is the ability of a material to be crumbled, pulverized, or reduced to powder by hand pressure.

  • Homogeneous areas group materials of similar composition applied at the same time; sampling is performed by homogeneous area, not by individual room.

  • A management planner relies on the inspector's written assessment; the planner does not re-sample or re-assess materials.

  • Seven assessment ratings commonly recorded: none, minor damage, significant damage, potential for damage, potential for significant damage, and undetermined.

  • Quantities are reported in square feet for surfacing materials and linear feet for TSI and some miscellaneous materials.

  • Reinspection/reassessment is required at least once every three years in schools under AHERA.

Quick reference

Evaluation of Asbestos Hazards and Exposure Potential

  • Potential for fiber release depends on friability, condition, accessibility, activity level, air movement, and vibration in the area.

  • Airborne fiber concentration is expressed in fibers per cubic centimeter (f/cc); phase contrast microscopy is the standard method for routine air samples.

  • Exposure potential rises when damaged friable material is in a high-traffic area, near air-handling equipment, or subject to disturbance.

  • A hazard assessment weighs damage state against likelihood of disturbance; intact material in a sealed area presents lower potential.

  • Occupancy and use of the space (children, frequent maintenance, cleaning methods) modify the exposure estimate.

  • Deterioration can be accelerated by water damage, vibration, and physical contact; these factors should be documented in the assessment.

  • Risk is evaluated per homogeneous area and per location, not only building-wide, because exposure varies by room function.

Quick reference

Selection and Prioritization of Response Actions

  • Response actions: operations and maintenance, repair, enclosure, encapsulation, and removal.

  • Removal is generally reserved for significantly damaged friable material, material that will be disturbed by renovation or demolition, or material that cannot be controlled by other means.

  • Enclosure and encapsulation are interim controls; they require ongoing surveillance and do not eliminate the hazard.

  • Repair is used for limited damage, such as patching TSI or sealing small tears, and is typically paired with O&M.

  • Prioritize actions by hazard: significantly damaged friable material in occupied or high-traffic areas first, then lesser damage, then intact material under O&M.

  • Encapsulation is not appropriate for materials subject to water damage or for TSI that may need future access.

  • The management planner selects response actions and sets a schedule; the plan must state what will be done, where, and when.

  • Cost, effectiveness, durability, and potential for fiber release during the action itself are weighed when choosing among options.

Quick reference

Management Plan Development and Required Content

  • An AHERA management plan must include the inspection and assessment results, response actions, a schedule, and the O&M plan.

  • Required elements include a list of homogeneous areas, location and quantity of materials, and the assessment of condition.

  • The plan must describe response actions for each material, including who will perform them and the timetable.

  • A plan must identify the steps taken to inform workers, building occupants, and guardians of the plan's availability.

  • The plan must include a procedure for periodic surveillance (every six months) and reinspection (every three years).

  • The plan must address how records are maintained and made available for public inspection.

  • Plans are prepared by an accredited management planner based on an accredited inspector's findings.

  • The plan should include a statement of the building's asbestos-related goals and the rationale for chosen actions.

Quick reference

O&M Programs and Operations and Maintenance Plans

  • An O&M program addresses activities that may disturb asbestos, such as maintenance, repair, cleaning, and minor renovation.

  • O&M provisions include work practices, worker training, respiratory protection, cleaning procedures, and waste handling.

  • Specialized cleaning (HEPA vacuuming, wet wiping) is used where friable material has shed fibers; dry sweeping and dusting are prohibited.

  • Employees whose duties may disturb asbestos receive asbestos awareness training; O&M work requires more detailed training.

  • The O&M plan specifies safe work practices for each material type and location, and prohibits activities that would disturb ACM.

  • Minor maintenance that disturbs ACM follows prescribed work practices; larger disturbances require abatement by a contractor.

  • Warning labels or signage identify asbestos-containing materials and areas where access is restricted.

  • O&M is appropriate for material in good condition that is not likely to be significantly disturbed.

Quick reference

Regulatory Requirements and Recordkeeping

  • AHERA requires inspection of school buildings by accredited inspectors and management plans by accredited management planners.

  • Accreditation requires completion of an EPA-approved course and passing an examination; refresher training is required annually for management planners.

  • Local education agencies must maintain records of inspections, assessments, response actions, and periodic surveillance.

  • Records must be made available to the EPA, state agencies, and the public; the plan is kept on site.

  • Notification to parents, teachers, and employee organizations is required annually and whenever the plan is updated.

  • Abatement contractors and workers must be accredited or certified; abatement is regulated under NESHAP and applicable OSHA standards.

  • Waste containing asbestos is handled as regulated waste and transported and disposed of per NESHAP requirements.

  • Recordkeeping must document training, surveillance, reinspection, and any response actions performed.

Quick reference

Communication, Notification, and Plan Updates

  • The management plan must be available for inspection by parents, teachers, and the public during normal school hours.

  • Annual written notification informs parents, teachers, and employee organizations of the plan's availability and any updates.

  • Notification is required when response actions are performed or when the plan is revised.

  • Periodic surveillance occurs every six months to check material condition and note changes.

  • Reinspection by an accredited inspector occurs at least every three years and triggers plan revision if conditions change.

  • Plan updates must reflect new findings, completed response actions, and revised schedules.

  • Communication should describe the location of ACM, its condition, and the actions being taken, in plain language.

  • Records of notifications and updates are retained with the management plan.